
About 4 Archs Project Private Limited
Data last updated:
4 Archs Project Private Limited is a private limited company based in Mumbai, Maharashtra, India. It operates in the engineering design and consultancy segment of the engineering sector. It was incorporated on 12 February 2021 and has been in existence for over 5 years.
The company is registered with the Registrar of Companies (ROC), Mumbai, under CIN U45400MH2021PTC355223. Its GSTIN is 27AABCZ6862F1Z0 (Maharashtra).
The company has an authorised share capital of ₹10 Lakh and a paid-up capital of ₹1 Lakh. It is led by directors Rashiduddin Shah and Sajid Hanif Nathani.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at Kw/345 Road Over Bridge Off S V Road Nr. Habiba Masjid Oshiwara Jogeshwari W, Mumbai, Maharashtra, India – 400102.
As per the financials filed for FY 2025, the company reported a revenue of ₹4.7 Cr, a decline of 21% compared to the previous year. For the same year it recorded a net profit of ₹16.42 Lakh (net margin 3.5%) and EBITDA of ₹22.96 Lakh (EBITDA margin 4.9%). Revenue has grown at a compounded annual rate (CAGR) of 3% over three years.
The company has about 7 employees on its provident fund (EPFO) records.
As per MCA filings, the company has open charges of ₹54.87 Lakh on record.
For more details, the company can be reached via its website 4archs.com.
- EmailLocked
- TelephoneLocked
- Website
- Social Media
- Registered AddressKw/345 Road Over Bridge Off S V Road Nr. Habiba Masjid Oshiwara Jogeshwari W, Mumbai, Maharashtra, India – 400102
- IndustryEngineering, Engineering Design & Consultancy
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of 4 Archs Project Private Limited
The main business activity of 4 Archs Project is professional, scientific and technical activities. In detail, this covers architectural and engineering activities; technical testing and analysis.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| M | Professional, scientific and technical activities | 71 | Architectural and engineering activities; technical testing and analysis | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of 4 Archs Project Private Limited FY 2025 filings available
4 Archs Project Private Limited reported revenue of ₹4.7 Cr (down 21% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR) of 4 Archs Project Private Limited
Revenue fell 21% in the latest year, but over three years it has grown at a compounded annual rate (CAGR) of 3%. EBITDA fell 11% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of 4 Archs Project Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹22.96 Lakh | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | ₹16.42 Lakh | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of 4 Archs Project Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 4.9% | •••• | •••• | •••• | •••• |
| Net Profit Margin | 3.5% | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of 4 Archs Project are in the company report.
Financial statements from FY 2021
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of 4 Archs Project Private Limited
4 Archs Project Private Limited is compared with the companies closest to it by revenue in the Engineering industry (Engineering Design). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Rollecate Engineering Services Private Limited | ₹4.77 Cr (FY 2024) | •••• | •••• | 21.0% | •••• | Ernakulam, Kerala, India |
| Padmavathi Engineering Design Solutions Private Limited | ₹4.76 Cr (FY 2025) | •••• | •••• | 109.0% | •••• | Kovvur, Andhra Pradesh, India |
| Map Technolab Private Limited | ₹4.75 Cr (FY 2025) | •••• | •••• | 30.0% | •••• | Gandhinagar, Gujarat, India |
| KNR Engineers (India) Private Limited | ₹4.75 Cr (FY 2024) | •••• | •••• | 38.0% | •••• | Chennai, Tamil Nadu, India |
| Lusso Designs (India) Private Limited | ₹4.74 Cr (FY 2025) | •••• | •••• | 8609.0% | •••• | Mumbai, Maharashtra, India |
| 4 Archs Project Private Limited this company | ₹4.7 Cr (FY 2025) | •••• | •••• | -21.0% | •••• | Mumbai, Maharashtra, India |
| Rtroyaltech Structures Private Limited | ₹4.7 Cr (FY 2024) | •••• | •••• | 1775.0% | •••• | Hyderabad, Telangana, India |
| Autorev Engineering Private Limited | ₹4.7 Cr (FY 2024) | •••• | •••• | 30.0% | •••• | Pune, Maharashtra, India |
| Bhargav Build Pro Technologies Private Limited | ₹4.69 Cr (FY 2025) | •••• | •••• | 42.0% | •••• | Secunderabad, Telangana, India |
| Wegl Services India Private Limited | ₹4.69 Cr (FY 2021) | •••• | •••• | 74.0% | •••• | Chennai, Tamil Nadu, India |
| Orgate Automation Private Limited | ₹4.69 Cr (FY 2025) | •••• | •••• | 60.0% | •••• | Pune, Maharashtra, India |
Peers are the five companies nearest above and the five nearest below 4 Archs Project by revenue in the Engineering industry (Engineering Design), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Auditor Details of 4 Archs Project Private Limited
4 Archs Project Private Limited is audited by N.R. Panchal & Co. for the financial year 2023.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| N.R. Panchal & Co. | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Board of Directors of 4 Archs Project Private Limited
4 Archs Project has 2 current directors and 2 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Sajid Hanif Nathani | Additional Director | 07 Apr 2021 | 5 Years 6 Months | Current |
| Rashiduddin Shah | Director | 12 Feb 2021 | 5 Years 7 Months | Current |
Ownership and Shareholding of 4 Archs Project Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of 4 Archs Project Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 06 Aug 2025 | Others | ₹50 Lakh | Open |
| 28 Jun 2021 | Hdfc Bank Limited | ₹4.87 Lakh | Open |
Total charge records: 2 View all charges
Employees and EPFO Compliance at 4 Archs Project Private Limited
4 Archs Project Private Limited has a workforce of 7 employees as of Mar 27, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on 4 Archs Project Private Limited
4 Archs Project Private Limited has 5 board changes on record since 2021: 3 appointments and 2 cessations. The latest: Abdul Kalam Saifee ceased to be Additional Director on 04 Jul 2025.
Credit Ratings, Litigation & Regulatory Alerts for 4 Archs Project Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by 4 Archs Project Private Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of 4 Archs Project Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of 4 Archs Project Private Limited
4 Archs Project has 1 GST registration: 1 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 27AABCZ6862F1Z0 | Maharashtra | Active | 18 Feb 2021 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of 4 Archs Project Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about 4 Archs Project Private Limited
4 Archs Project is an active private limited company based in Mumbai, Maharashtra, India. The company works in engineering design and consultancy, within the engineering industry. It was incorporated on 12 February 2021 (5+ years old) and is registered under CIN U45400MH2021PTC355223.
4 Archs Project reported revenue of ₹4.7 Cr for FY 2025 (down 21% YoY).
4 Archs Project has 2 current directors:
- Sajid Hanif Nathani - Additional Director
- Rashiduddin Shah - Director
4 Archs Project reported a net profit of ₹16.42 Lakh (net margin 3.5%) and EBITDA of ₹22.96 Lakh (EBITDA margin 4.9%) for FY 2025, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of 4 Archs Project is 3% over three years. In the latest year (FY 2025) revenue fell 21%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of 4 Archs Project is 27AABCZ6862F1Z0, registered in Maharashtra.
The CIN (Corporate Identification Number) of 4 Archs Project is U45400MH2021PTC355223. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
4 Archs Project was incorporated on 12 February 2021, making it 5+ years old. It is registered with the Registrar of Companies, Mumbai.
The peers of 4 Archs Project by revenue are Rollecate Engineering Services Private Limited, Padmavathi Engineering Design Solutions Private Limited, Map Technolab Private Limited, KNR Engineers (India) Private Limited, Lusso Designs (India) Private Limited and 5 more, all in the Engineering industry (Engineering Design).
Abdul Kalam Saifee ceased to be Additional Director on 04 Jul 2025. Mohammed Yaqub Shaikh ceased to be Director on 04 Jul 2025. Abdul Kalam Saifee was appointed as Additional Director on 07 Apr 2021. 4 Archs Project has 5 board changes on record in total.
4 Archs Project can be reached through the website 4archs.com. Its registered office is in Mumbai, Maharashtra, India.