About Ahmednagar Bypass Road Project Private Limited
Data last updated: 30 December 2025
Ahmednagar Bypass Road Project Private Limited is a private limited company based in Mumbai, Maharashtra, India, a subsidiary of Ghv (India) Private Limited. It specialises in road and bridge construction, a part of the broader infrastructure and utilities sector. Incorporated on 01 January 2019, the company has been in operation for over 7 years.
Registered with ROC Mumbai under CIN U45100MH2019PTC318917.
Capital: an authorised share capital of ₹50 Cr and a paid-up capital of ₹50 Cr. Formerly known as Ghv Power (India) Private Limited. It is led by directors Pradeep Pandey and Birendra Prasad.
Last AGM: 30 September 2025. Financial statements filed for year ended 31 March 2025. Office: 1St Floor Aml Centre 1 8 Mahakali Caves Road Andheri East, Mumbai, Maharashtra, India – 400093.
As per the financials filed for FY 2025, the company reported a revenue of ₹70.19 Cr, a decline of 75% compared to the previous year.
It operates as a subsidiary of Ghv (India) Private Limited.
As per MCA filings, the company has open charges of ₹361.5 Cr and satisfied charges of ₹252.12 Cr on record.
The current compliance status is marked as compliant by the Registrar of Companies. For more details, the company can be reached via its website ghvgroup.com.
-
Email*****@*****.com
-
Telephone+91-****-******
-
Website
-
Social Media**************
-
Registered Address1St Floor Aml Centre 1 8 Mahakali Caves Road Andheri East, Mumbai, Maharashtra, India – 400093
-
IndustryInfrastructure and Utilities, Road & Bridge Construction
- Historical Financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Litigation, compliance and MCA filings
- PDF report delivered after checkout
CIN History of Ahmednagar Bypass Road Project Private Limited
Ahmednagar Bypass Road Project Private Limited has one previous CIN (Corporate Identification Number): U74999MH2019PTC318917. The current CIN is U45100MH2019PTC318917, which is the unique identifier assigned by the Registrar of Companies.
| CIN | Status |
|---|---|
| U45100MH2019PTC318917 | Current |
| U74999MH2019PTC318917 | Previous |
Business Activity of Ahmednagar Bypass Road Project Private Limited
Ahmednagar Bypass Road Project Private Limited is engaged in the principal business activity of construction, with detailed activities including roads, railways, utility projects.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | F2 | Roads, railways, Utility projects | ********* |
Auditor Details of Ahmednagar Bypass Road Project Private Limited
Ahmednagar Bypass Road Project Private Limited is audited by Manubhai & Shah LLP for the financial year 2023. The auditor plays a crucial role in ensuring financial transparency and compliance with accounting standards.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| Manubhai & Shah LLP | blur-value | blur-value | blur-value |
Board of Directors of Ahmednagar Bypass Road Project Private Limited
Ahmednagar Bypass Road Project Private Limited is currently managed by 3 directors, with 7 former directors having served the organization. The current Directors play a crucial role in shaping the company's strategic direction and governance.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
|
Pradeep Pandey
Also directs:
Ahmednagar Bypass Road Project Private Limited
|
Director | 10 Mar 2023 | 3 Years 4 Months | Current |
|
Birendra Prasad
Also directs:
Ahmednagar Bypass Road Project Private Limited
|
Director | 10 Mar 2023 | 3 Years 4 Months | Current |
Financials of Ahmednagar Bypass Road Project Private Limited FY 2025 filings available
Ahmednagar Bypass Road Project Private Limited reported revenue of ₹70.19 Cr (down 75% YoY) for FY 2025. Profit growth despite declining revenue indicates effective cost management and margin discipline.
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Revenue | |||||
| Revenue from Operations | ***** | ***** | ***** | ***** | ***** |
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Other Income | ***** | ***** | ***** | ***** | ***** |
| Total Revenue | ***** | ***** | ***** | ***** | ***** |
| Expenses | |||||
| Total Expenses | ***** | ***** | ***** | ***** | ***** |
| Raw Material Cost | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory FG | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory WIP | ***** | ***** | ***** | ***** | ***** |
| Purchase of Traded Goods | ***** | ***** | ***** | ***** | ***** |
| Employee Cost | ***** | ***** | ***** | ***** | ***** |
| Managerial Remuneration | ***** | ***** | ***** | ***** | ***** |
| Audit Fees | ***** | ***** | ***** | ***** | ***** |
| Insurance | ***** | ***** | ***** | ***** | ***** |
| Power & Fuel | ***** | ***** | ***** | ***** | ***** |
| Interest | ***** | ***** | ***** | ***** | ***** |
| Depreciation | ***** | ***** | ***** | ***** | ***** |
| Other Expenses | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| EBITDA (Operating Profit) | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| Exceptional Items | ***** | ***** | ***** | ***** | ***** |
| Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Exceptional & Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Tax & Net Profit | |||||
| Tax Expense | ***** | ***** | ***** | ***** | ***** |
| Current Tax | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax | ***** | ***** | ***** | ***** | ***** |
| Profit from Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Tax on Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Profit | ***** | ***** | ***** | ***** | ***** |
| Net Margin % | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Shareholders' Funds | |||||
| Total Shareholders' Funds | ***** | ***** | ***** | ***** | ***** |
| Equity Capital | ***** | ***** | ***** | ***** | ***** |
| Reserves & Surplus | ***** | ***** | ***** | ***** | ***** |
| Money Against Warrants | ***** | ***** | ***** | ***** | ***** |
| Other Equity | ***** | ***** | ***** | ***** | ***** |
| Non-Current Liabilities | |||||
| Total Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Liabilities | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Current Liabilities | |||||
| Total Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Trade Payables | ***** | ***** | ***** | ***** | ***** |
| Other Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Total Equity & Liabilities | ***** | ***** | ***** | ***** | ***** |
| Non-Current Assets | |||||
| Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Tangible Assets | ***** | ***** | ***** | ***** | ***** |
| Intangible Assets | ***** | ***** | ***** | ***** | ***** |
| Capital WIP | ***** | ***** | ***** | ***** | ***** |
| Intangibles Under Dev | ***** | ***** | ***** | ***** | ***** |
| Investments | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Assets | ***** | ***** | ***** | ***** | ***** |
| LT Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Assets | |||||
| Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Investments | ***** | ***** | ***** | ***** | ***** |
| Inventories | ***** | ***** | ***** | ***** | ***** |
| Trade Receivables | ***** | ***** | ***** | ***** | ***** |
| Cash & Bank Balance | ***** | ***** | ***** | ***** | ***** |
| ST Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Current Assets | ***** | ***** | ***** | ***** | ***** |
| Total Assets | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Cash from Operating Activities (CFO) | |||||
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Non-Cash Adjustments | ***** | ***** | ***** | ***** | ***** |
| + Interest Expense | ***** | ***** | ***** | ***** | ***** |
| + Depreciation | ***** | ***** | ***** | ***** | ***** |
| +/- Unrealized Forex | ***** | ***** | ***** | ***** | ***** |
| - Dividend Income | ***** | ***** | ***** | ***** | ***** |
| - Interest Income | ***** | ***** | ***** | ***** | ***** |
| +/- Other Non-Cash Items | ***** | ***** | ***** | ***** | ***** |
| Changes in Working Capital | ***** | ***** | ***** | ***** | ***** |
| +/- Inventory | ***** | ***** | ***** | ***** | ***** |
| +/- Debtors | ***** | ***** | ***** | ***** | ***** |
| +/- Creditors | ***** | ***** | ***** | ***** | ***** |
| Reconciliation Adjustments | ***** | ***** | ***** | ***** | ***** |
| Cash Generated from Operations | ***** | ***** | ***** | ***** | ***** |
| Income Taxes Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFO (Cash from Operations) | ***** | ***** | ***** | ***** | ***** |
| Cash from Investing Activities (CFI) | |||||
| Acquisitions & Disposals | ***** | ***** | ***** | ***** | ***** |
| Disposal of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Acquisition of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Capex | ***** | ***** | ***** | ***** | ***** |
| Purchase of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Sale of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Other Investing Cash Flows | ***** | ***** | ***** | ***** | ***** |
| Net CFI (Cash from Investing) | ***** | ***** | ***** | ***** | ***** |
| Cash from Financing Activities (CFF) | |||||
| Equity Issuance | ***** | ***** | ***** | ***** | ***** |
| Debt Raised | ***** | ***** | ***** | ***** | ***** |
| Debt Repaid | ***** | ***** | ***** | ***** | ***** |
| Dividends Paid | ***** | ***** | ***** | ***** | ***** |
| Interest Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFF (Cash from Financing) | ***** | ***** | ***** | ***** | ***** |
| Net Cash Position | |||||
| Net Change in Cash (Pre-Forex) | ***** | ***** | ***** | ***** | ***** |
| Closing Cash & Equivalents | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Liquidity | |||||
| Current Ratio | ***** | ***** | ***** | ***** | ***** |
| Quick Ratio | ***** | ***** | ***** | ***** | ***** |
| Cash Ratio | ***** | ***** | ***** | ***** | ***** |
| Efficiency | |||||
| Inventory Days | ***** | ***** | ***** | ***** | ***** |
| Debtor Days | ***** | ***** | ***** | ***** | ***** |
| Creditor Days | ***** | ***** | ***** | ***** | ***** |
| Cash Conversion Cycle | ***** | ***** | ***** | ***** | ***** |
| Asset Turnover | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| Net Profit Margin % | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| ROE % | ***** | ***** | ***** | ***** | ***** |
| ROCE % | ***** | ***** | ***** | ***** | ***** |
| Net Worth Margin % | ***** | ***** | ***** | ***** | ***** |
| Growth | |||||
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Leverage | |||||
| Equity Multiplier | ***** | ***** | ***** | ***** | ***** |
| Debt / EBITDA | ***** | ***** | ***** | ***** | ***** |
| Solvency | |||||
| D/E Ratio | ***** | ***** | ***** | ***** | ***** |
| ICR | ***** | ***** | ***** | ***** | ***** |
Consolidated Statements
Income Statement, Balance Sheet, Cash Flow & Ratios available in the full report.
Shareholding Pattern of Ahmednagar Bypass Road Project Private Limited
As of FY 2023, Ahmednagar Bypass Road Project Private Limited's shareholding pattern shows 100.00% by promoters. The promoters hold a majority stake, indicating strong promoter control.
| Year | 2025 |
|---|---|
| Promoters | 33.19% |
| DII | 23.22% |
| FII | 18.28% |
| Public | 22.89% |
| Others | 2.42% |
Charges & Borrowings of Ahmednagar Bypass Road Project Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 19 Mar 2024 | Others | ₹361.5 Cr | Open |
| 05 Jul 2021 | Others | ₹252.12 Cr | Satisfied |
Total charge records: 2 View all charges
Employees and EPFO Compliance at Ahmednagar Bypass Road Project Private Limited
View historical data on people associated with Ahmednagar Bypass Road Project Private Limited, including employment history and EPFO contributions.
Employee Count & EPFO Data of Ahmednagar Bypass Road Project Private Limited
Access employee headcount trends, monthly PF payment records, EPFO establishment details, and compliance data.
GST Compliance of Ahmednagar Bypass Road Project Private Limited
GSTIN & GST Filing Data of Ahmednagar Bypass Road Project Private Limited
Access GSTIN registrations, state-wise filing compliance, HSN/SAC codes, and detailed goods & services data.
Credit Ratings, Litigation & Regulatory Alerts for Ahmednagar Bypass Road Project Private Limited
Credit Ratings, Legal Cases & Regulatory Alerts of Ahmednagar Bypass Road Project Private Limited
Access complete credit rating history, litigation records, regulatory alerts, and compliance data.
MSME Payment Delays by Ahmednagar Bypass Road Project Private Limited
MSME Payment Delays by Ahmednagar Bypass Road Project Private Limited
Track payments outstanding to micro and small enterprise vendors, as disclosed in half-yearly MSME-1 returns filed with the MCA.
Subsidiaries & Group Companies of Ahmednagar Bypass Road Project Private Limited
Subsidiaries & Group Companies of Ahmednagar Bypass Road Project Private Limited
See the full corporate group - holding company, subsidiaries, associates and joint ventures of Ahmednagar Bypass Road Project Private Limited with ownership details.
MCA Filings & Documents of Ahmednagar Bypass Road Project Private Limited
MCA Filings & Documents of Ahmednagar Bypass Road Project Private Limited
Download official documents filed with the Ministry of Corporate Affairs - from incorporation papers to the latest annual filings.
Recent Activity on Ahmednagar Bypass Road Project Private Limited
Recent News on Ahmednagar Bypass Road Project Private Limited
Frequently Asked Questions about Ahmednagar Bypass Road Project Private Limited
Ahmednagar Bypass Road Project Private Limited is an active private limited company in the infrastructure and utilities sector based in Mumbai, Maharashtra, India. It was incorporated on 01 January 2019 (7+ years old) and is registered under CIN U45100MH2019PTC318917.
Ahmednagar Bypass Road Project Private Limited reported revenue of ₹70.19 Cr for FY 2025 (down 75.00% YoY).
The current directors of Ahmednagar Bypass Road Project Private Limited are:
- Pradeep Pandey
- Birendra Prasad
- Rupa Harianna Shetty
The primary industry of Ahmednagar Bypass Road Project Private Limited is infrastructure and utilities. The company specifically operates in road and bridge construction. The company is currently active in this sector.
Ahmednagar Bypass Road Project Private Limited can be reached at the registered office: 1St Floor Aml Centre 1 8 Mahakali Caves Road Andheri East, Mumbai, Maharashtra, India – 400093, or through the website ghvgroup.com.
The authorised capital is ₹50 Cr, and the paid-up capital is ₹50 Cr.