About Anawil Wire and Engineering Limited
Data last updated:
Anawil Wire and Engineering Limited is a public limited company based in Pardi, Gujarat, India, a subsidiary of Darpan Infrastructure Private Limited. It operates in the industrial products manufacturers segment of the machinery and industrial equipment sector. It was incorporated on 02 January 2021 and has been in existence for over 5 years.
The company is registered with the Registrar of Companies (ROC), Ahmedabad, under CIN U27320GJ2021PLC119254. It holds 5 GST registrations, all of them active, including GSTIN 08AAUCA6057G1Z9 (Rajasthan). It is a listed company as per MCA records. The company has an authorised share capital of ₹25 Cr and a paid-up capital of ₹19.72 Cr. It has 6 current directors, including Nimesh Rameshbhai Vashi (Managing Director) and Ayush Nimish Vashi (Whole-Time Director).
As per the financials filed for FY 2026, the company reported a revenue of ₹143.63 Cr, a growth of 80.89% compared to the previous year. It closed the year with a net profit. The company has about 93 employees on its provident fund (EPFO) records.
Company details
- Public Limited Company
- Registration number 119254
- Incorporated 02 January 2021
- Authorised capital ₹25 Cr
- Turnover of ₹100 crore to ₹500 crore
- Revenue ₹143.63 Cr in FY 2026
- 93 employees, as per EPFO records
- Business activity, as per the annual return of FY 2024: Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment
Contact details
Anawil Wire and Engineering Limited's registered office is in Pardi, Gujarat.
- Registered AddressPlot No. 201 Office No – 1, Vibrant Business Park G.I.D.C, Pardi, Gujarat, India – 396191
- City: Pardi
- State: Gujarat
- PIN Code: 396191
Company history
- Previous CIN
- U27320GJ2021PTC119254
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Business activity
Anawil Wire and Engineering operates primarily in the manufacturing sector. 2 business activities are registered with the MCA.
| Main activity group | Business activity | Share of turnover |
|---|---|---|
| Manufacturing | Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Anawil Wire and Engineering Limited
FY 2026 filings availableAnawil Wire and Engineering Limited reported revenue of ₹143.63 Cr (up 80.89% YoY) for FY 2026.
Compounded Annual Growth Rate (CAGR)
Revenue has grown at a compounded annual rate (CAGR) of 77.28% over three years, including 80.89% growth in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Summary
The latest five years are shown here. The company report carries every year filed since FY 2020-21.
| Summary | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|---|
| Revenue | 143.63 Cr | ||||
| EBITDA | |||||
| EBITDA Margin | |||||
| Profit After Tax | |||||
| PAT Margin | |||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since FY 2020-21, up to FY 2025-26. The latest four years are previewed here. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | 143.63 Cr | |||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Cash Flow Statement In the report
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Profit Before Tax | ||||
| Adjustments for Finance Costs | ||||
| Adjustments for Depreciation and Amortisation | ||||
| Adjustments for Inventories | ||||
| Adjustments for Trade Receivables | ||||
| Adjustments for Trade Payables | ||||
| Adjustments for Other Current Assets | ||||
| Adjustments for Other Current Liabilities | ||||
| Adjustments for Provisions | ||||
| Adjustments for Interest Income | ||||
| Adjustments for Dividend Income | ||||
| Other Non-cash Adjustments | ||||
| Net Cash Flows from Operations | ||||
| Income Taxes Paid | ||||
| Net Cash Flows from Operating Activities | ||||
| Purchase of Property, Plant and Equipment | ||||
| Proceeds from Sale of Property, Plant and Equipment | ||||
| Cash Flows on Acquiring or Losing Control of Subsidiaries | ||||
| Interest Received | ||||
| Dividends Received | ||||
| Net Cash Flows from Investing Activities | ||||
| Proceeds from Issuing Shares | ||||
| Proceeds from Borrowings | ||||
| Repayments of Borrowings | ||||
| Payments of Lease Liabilities | ||||
| Interest Paid | ||||
| Dividends Paid | ||||
| Net Cash Flows from Financing Activities | ||||
| Net Change in Cash and Cash Equivalents | ||||
| Cash and Cash Equivalents at the Beginning | ||||
| Cash and Cash Equivalents at the End |
Liquidity ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since incorporation
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Anawil Wire and Engineering Limited
Anawil Wire and Engineering has 6 current directors and 4 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Bhavin Navinchandra Desai | Director | 02 Jan 2021 | 5 yrs 10 mos | Current |
| Bijal Vashi | Director | 01 Feb 2025 | 1 yr 9 mos | Current |
| Nimesh Rameshbhai Vashi | Managing Director | 01 Feb 2025 | 1 yr 9 mos | Current |
| Ayush Nimish Vashi | Whole-Time Director | 02 Jan 2021 | 5 yrs 10 mos | Current |
| Nirav Jashvantrai Desai | Director | 20 Jun 2025 | 1 yr 5 mos | Current |
| Digant Hemantkumar Bhagat | Director | 20 Jun 2025 | 1 yr 5 mos | Current |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Anawil Wire and Engineering Limited is compared with the 9 companies closest to it by revenue in the Machinery and Equipment industry (Foundry and Fabrication, Industrial Products Manufacturers), with the same principal business activity (electrical equipment, general purpose and special purpose machinery & equipment, transport equipment), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Urjayant Engineering Private Limited | ₹152.46 Cr FY 2025 | 19.0% | Nashik, Maharashtra, India | |||
| Moog Controls (India) Private Limited | ₹146.48 Cr FY 2025 | 2.0% | Bengaluru, Karnataka, India | |||
| Rajamane Industries Private Limited | ₹145.48 Cr FY 2025 | 2.0% | Bengaluru, Karnataka, India | |||
| Anawil Wire and Engineering Limitedthis company | ₹143.63 Cr FY 2026 | 80.9% | Pardi, Gujarat, India | |||
| Fives Combustion Systems Private Limited | ₹143.51 Cr FY 2025 | 79.0% | Vadodara, Gujarat, India | |||
| Skye Batteries Private Limited | ₹139.81 Cr FY 2025 | 1.0% | Pune, Maharashtra, India | |||
| Advance Ventilation Pvt Ltd | ₹138.83 Cr FY 2025 | 6.0% | New Delhi, Delhi, India | |||
| Teksons Private Limited | ₹138.82 Cr FY 2025 | 1.0% | Thane, Maharashtra, India | |||
| Chemtrols Industries Private Limited | ₹138.45 Cr FY 2024 | -18.0% | Mumbai, Maharashtra, India | |||
| Swam Pneumatics Private Limited | ₹136.88 Cr FY 2025 | 18.0% | New Delhi, Delhi, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Charges & borrowings
Anawil Wire and Engineering Limited has 6 charge records registered with the MCA, created between 2021 and 2025: 6 open and none satisfied.
Open charges by lender
Open and latest charges
| Created on | Charge ID | Lender | Amount | Status |
|---|---|---|---|---|
| 26 Nov 2025 | 101198358 | Others | ₹1.79 Cr | Open |
| 01 Aug 2025 | 101133939 | Others | ₹51.81 Lakh | Open |
| 29 Mar 2025 | 101070890 | Others | ₹4.9 Cr | Open |
| 21 Mar 2023 | 100699661 | Others | ₹10.4 Lakh | Open |
| 30 Dec 2021 | 100520032 | Others | ₹130.84 Cr | Open |
- All 6 charge records, 2021 to 2025
- Creation, last modification and satisfaction date of each charge
- Open and satisfied amount with every lender
- Each lender's share of the open amount
Deals & funding
Anawil Wire and Engineering Limited has 1 deal on record (1 ipo); the latest was in August 2026.
- Every funding round, acquisition and share transfer on record
- Deal amount and post-money valuation
- Investors, buyers and sellers in each deal
- Funding and valuation over time
Deal records are compiled from filings and public sources; amounts are shown only where the source reported them.
GST
Anawil Wire and Engineering has 5 GST registrations: 5 active. The first 4 active GSTINs are listed below.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 08AAUCA6057G1Z9 | Rajasthan | Active | 16 Nov 2022 |
| 20AAUCA6057G1ZN | Jharkhand | Active | 28 Jan 2022 |
| 29AAUCA6057G1Z5 | Karnataka | Active | 14 Jan 2022 |
| 23AAUCA6057G1ZH | Madhya Pradesh | Active | 05 Mar 2021 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Anawil Wire and Engineering Limited has 10 board changes on record since 2021: 6 appointments and 4 cessations. The latest: Digant Hemantkumar Bhagat was appointed as Director on 20 Jun 2025.
| Date | Type | Event |
|---|---|---|
| 7 months ago | Filing | Anawil Wire And Engineering Limited has filed its annual Financial statements for the year ended 31 Mar 2026 with ROC Ahmedabad. |
| 1 year ago | Charges | A charge with Others amounted to Rs. 1.79 Cr with Charge ID 101198358 was registered on 26 Nov 2025. |
| 1 year ago | Charges | A charge with Others of Rs. 130.84 Cr registered on 30 Dec 2021 with Charge ID 100520032 was modified on 06 Nov 2025. |
| 1 year ago | Charges | A charge with Others of Rs. 130.84 Cr registered on 28 Dec 2021 with Charge ID 100520030 was modified on 04 Nov 2025. |
| 1 year 3 months ago | Charges | A charge with Others amounted to Rs. 0.52 Cr with Charge ID 101133939 was registered on 01 Aug 2025. |
| 1 year 3 months ago | AGM | Anawil Wire And Engineering Limited last Annual general meeting of members was held on 31 Jul 2025 as per latest MCA records. |
| 1 year 5 months ago | Appointed | Digant Hemantkumar Bhagat was appointed as Director. |
| 1 year 5 months ago | Appointed | Nirav Jashvantrai Desai was appointed as Director. |
Also available in the company report of Anawil Wire and Engineering Limited
Legal cases
- Court and tribunal cases, with case number, court and year
- Parties to each case and its status
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Anawil Wire and Engineering is an active public limited company based in Pardi, Gujarat, India. The company works in industrial products manufacturers, within the machinery and equipment industry. It was incorporated on 02 January 2021 (5+ years old) and is registered under CIN U27320GJ2021PLC119254.
Anawil Wire and Engineering has 6 current directors:
- Nimesh Rameshbhai Vashi - Managing Director
- Ayush Nimish Vashi - Whole-Time Director
- Bhavin Navinchandra Desai - Director
- Bijal Vashi - Director
- Nirav Jashvantrai Desai - Director
- Digant Hemantkumar Bhagat - Director
The latest financial statements of Anawil Wire and Engineering on record with the MCA are for the year ended 31 March 2026. Its last annual general meeting was held on 31 July 2025. Year-wise statements from FY 2021 are in the company report.
The GSTIN of Anawil Wire and Engineering is 08AAUCA6057G1Z9, registered in Rajasthan. The company has 5 GST registrations in all, of which 5 are active. Other active GSTINs include 20AAUCA6057G1ZN (Jharkhand), 29AAUCA6057G1Z5 (Karnataka), 23AAUCA6057G1ZH (Madhya Pradesh).
The CIN (Corporate Identification Number) of Anawil Wire and Engineering is U27320GJ2021PLC119254. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Yes. Anawil Wire and Engineering is a listed company as per MCA records.
Anawil Wire and Engineering was incorporated on 02 January 2021, making it 5+ years old. It is registered with the Registrar of Companies, Ahmedabad.
Anawil Wire and Engineering has 1 deal on record (1 ipo); the latest was in August 2026.
The peers of Anawil Wire and Engineering by revenue are Urjayant Engineering Private Limited, Moog Controls (India) Private Limited, Rajamane Industries Private Limited, Fives Combustion Systems Private Limited, Skye Batteries Private Limited and 4 more, all in the Machinery and Equipment industry (Foundry and Fabrication, Industrial Products Manufacturers), with the same principal business activity (electrical equipment, general purpose and special purpose machinery & equipment, transport equipment).
Digant Hemantkumar Bhagat was appointed as Director on 20 Jun 2025. Nirav Jashvantrai Desai was appointed as Director on 20 Jun 2025. Anawil Wire and Engineering has 10 board changes on record in total.
Anawil Wire and Engineering can be reached through the website anawilvapi.com. Its registered office is in Pardi, Gujarat, India.


