Arman Engineering Projects Private Limited
About Arman Engineering Projects Private Limited
Data last updated: 06 March 2026
Arman Engineering Projects Private Limited is a private limited company based in Nayagarh, Orissa, India. It specialises in electronics retail and distribution, a part of the broader consumer electronics and durables sector. Incorporated on 08 March 2011, the company has been in operation for over 15 years.
Registered with ROC Cuttack under CIN U45303OR2011PTC013267.
Capital: an authorised share capital of ₹10 Lakh and a paid-up capital of ₹9.78 Lakh. It is led by directors Madhab Chandra Sahu and Anjana Mohapatra.
Last AGM: 30 September 2025. Financial statements filed for year ended 31 March 2025. Office: Plot No – 1307/4146 Lane – 6 Mishra Colony, Nayagarh, Orissa, India – 752069.
As per the financials filed for FY 2025, the company reported a revenue of ₹2.51 Cr, reflecting significant growth compared to the previous year.
The company has a workforce of approximately 4 employees as per the latest available data.
As per MCA filings, the company has open charges of ₹1.18 Cr and satisfied charges of ₹55 Lakh on record.
The current compliance status is marked as compliant by the Registrar of Companies.
-
Email*****@*****.com
-
Telephone+91-****-******
-
Website**************
-
Social Media**************
-
Registered AddressPlot No – 1307/4146 Lane – 6 Mishra Colony, Nayagarh, Orissa, India – 752069
-
IndustryConsumer Electronics & Durables, Electronic Appliances Retail & Distribution
- Historical Financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Litigation, compliance and MCA filings
- PDF report delivered after checkout
Business Activity of Arman Engineering Projects Private Limited
Arman Engineering Projects Private Limited is engaged in the principal business activity of construction, with detailed activities including demolition & site preparation, electrical, plumbing & other specialized construction activities.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | F3 | Demolition & site preparation, Electrical, plumbing & other Specialized construction Activities | ********* |
Auditor Details of Arman Engineering Projects Private Limited
Arman Engineering Projects Private Limited is audited by P C JENA & CO for the financial year 2019. The auditor plays a crucial role in ensuring financial transparency and compliance with accounting standards.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| P C JENA & CO | blur-value | blur-value | blur-value |
Board of Directors of Arman Engineering Projects Private Limited
Arman Engineering Projects Private Limited is governed by 2 directors who oversee the company's operations and strategic decisions.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
|
Madhab Chandra Sahu
Also directs:
Ayushman Transformers Private Limited
|
Director | 08 Mar 2011 | 15 Years 4 Months | Current |
|
Anjana Mohapatra
Also directs:
Ayushman Transformers Private Limited
|
Director | 08 Mar 2011 | 15 Years 4 Months | Current |
Financials of Arman Engineering Projects Private Limited FY 2025 filings available
Arman Engineering Projects Private Limited reported revenue of ₹2.51 Cr (up 371% YoY) for FY 2025. Profit growth despite declining revenue indicates effective cost management and margin discipline.
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Revenue | |||||
| Revenue from Operations | ***** | ***** | ***** | ***** | ***** |
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Other Income | ***** | ***** | ***** | ***** | ***** |
| Total Revenue | ***** | ***** | ***** | ***** | ***** |
| Expenses | |||||
| Total Expenses | ***** | ***** | ***** | ***** | ***** |
| Raw Material Cost | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory FG | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory WIP | ***** | ***** | ***** | ***** | ***** |
| Purchase of Traded Goods | ***** | ***** | ***** | ***** | ***** |
| Employee Cost | ***** | ***** | ***** | ***** | ***** |
| Managerial Remuneration | ***** | ***** | ***** | ***** | ***** |
| Audit Fees | ***** | ***** | ***** | ***** | ***** |
| Insurance | ***** | ***** | ***** | ***** | ***** |
| Power & Fuel | ***** | ***** | ***** | ***** | ***** |
| Interest | ***** | ***** | ***** | ***** | ***** |
| Depreciation | ***** | ***** | ***** | ***** | ***** |
| Other Expenses | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| EBITDA (Operating Profit) | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| Exceptional Items | ***** | ***** | ***** | ***** | ***** |
| Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Exceptional & Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Tax & Net Profit | |||||
| Tax Expense | ***** | ***** | ***** | ***** | ***** |
| Current Tax | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax | ***** | ***** | ***** | ***** | ***** |
| Profit from Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Tax on Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Profit | ***** | ***** | ***** | ***** | ***** |
| Net Margin % | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Shareholders' Funds | |||||
| Total Shareholders' Funds | ***** | ***** | ***** | ***** | ***** |
| Equity Capital | ***** | ***** | ***** | ***** | ***** |
| Reserves & Surplus | ***** | ***** | ***** | ***** | ***** |
| Money Against Warrants | ***** | ***** | ***** | ***** | ***** |
| Other Equity | ***** | ***** | ***** | ***** | ***** |
| Non-Current Liabilities | |||||
| Total Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Liabilities | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Current Liabilities | |||||
| Total Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Trade Payables | ***** | ***** | ***** | ***** | ***** |
| Other Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Total Equity & Liabilities | ***** | ***** | ***** | ***** | ***** |
| Non-Current Assets | |||||
| Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Tangible Assets | ***** | ***** | ***** | ***** | ***** |
| Intangible Assets | ***** | ***** | ***** | ***** | ***** |
| Capital WIP | ***** | ***** | ***** | ***** | ***** |
| Intangibles Under Dev | ***** | ***** | ***** | ***** | ***** |
| Investments | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Assets | ***** | ***** | ***** | ***** | ***** |
| LT Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Assets | |||||
| Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Investments | ***** | ***** | ***** | ***** | ***** |
| Inventories | ***** | ***** | ***** | ***** | ***** |
| Trade Receivables | ***** | ***** | ***** | ***** | ***** |
| Cash & Bank Balance | ***** | ***** | ***** | ***** | ***** |
| ST Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Current Assets | ***** | ***** | ***** | ***** | ***** |
| Total Assets | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Cash from Operating Activities (CFO) | |||||
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Non-Cash Adjustments | ***** | ***** | ***** | ***** | ***** |
| + Interest Expense | ***** | ***** | ***** | ***** | ***** |
| + Depreciation | ***** | ***** | ***** | ***** | ***** |
| +/- Unrealized Forex | ***** | ***** | ***** | ***** | ***** |
| - Dividend Income | ***** | ***** | ***** | ***** | ***** |
| - Interest Income | ***** | ***** | ***** | ***** | ***** |
| +/- Other Non-Cash Items | ***** | ***** | ***** | ***** | ***** |
| Changes in Working Capital | ***** | ***** | ***** | ***** | ***** |
| +/- Inventory | ***** | ***** | ***** | ***** | ***** |
| +/- Debtors | ***** | ***** | ***** | ***** | ***** |
| +/- Creditors | ***** | ***** | ***** | ***** | ***** |
| Reconciliation Adjustments | ***** | ***** | ***** | ***** | ***** |
| Cash Generated from Operations | ***** | ***** | ***** | ***** | ***** |
| Income Taxes Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFO (Cash from Operations) | ***** | ***** | ***** | ***** | ***** |
| Cash from Investing Activities (CFI) | |||||
| Acquisitions & Disposals | ***** | ***** | ***** | ***** | ***** |
| Disposal of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Acquisition of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Capex | ***** | ***** | ***** | ***** | ***** |
| Purchase of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Sale of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Other Investing Cash Flows | ***** | ***** | ***** | ***** | ***** |
| Net CFI (Cash from Investing) | ***** | ***** | ***** | ***** | ***** |
| Cash from Financing Activities (CFF) | |||||
| Equity Issuance | ***** | ***** | ***** | ***** | ***** |
| Debt Raised | ***** | ***** | ***** | ***** | ***** |
| Debt Repaid | ***** | ***** | ***** | ***** | ***** |
| Dividends Paid | ***** | ***** | ***** | ***** | ***** |
| Interest Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFF (Cash from Financing) | ***** | ***** | ***** | ***** | ***** |
| Net Cash Position | |||||
| Net Change in Cash (Pre-Forex) | ***** | ***** | ***** | ***** | ***** |
| Closing Cash & Equivalents | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Liquidity | |||||
| Current Ratio | ***** | ***** | ***** | ***** | ***** |
| Quick Ratio | ***** | ***** | ***** | ***** | ***** |
| Cash Ratio | ***** | ***** | ***** | ***** | ***** |
| Efficiency | |||||
| Inventory Days | ***** | ***** | ***** | ***** | ***** |
| Debtor Days | ***** | ***** | ***** | ***** | ***** |
| Creditor Days | ***** | ***** | ***** | ***** | ***** |
| Cash Conversion Cycle | ***** | ***** | ***** | ***** | ***** |
| Asset Turnover | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| Net Profit Margin % | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| ROE % | ***** | ***** | ***** | ***** | ***** |
| ROCE % | ***** | ***** | ***** | ***** | ***** |
| Net Worth Margin % | ***** | ***** | ***** | ***** | ***** |
| Growth | |||||
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Leverage | |||||
| Equity Multiplier | ***** | ***** | ***** | ***** | ***** |
| Debt / EBITDA | ***** | ***** | ***** | ***** | ***** |
| Solvency | |||||
| D/E Ratio | ***** | ***** | ***** | ***** | ***** |
| ICR | ***** | ***** | ***** | ***** | ***** |
Consolidated Statements
Income Statement, Balance Sheet, Cash Flow & Ratios available in the full report.
Shareholding Pattern of Arman Engineering Projects Private Limited
As of FY 2019, Arman Engineering Projects Private Limited's shareholding pattern shows 100.00% by promoters. The promoters hold a majority stake, indicating strong promoter control.
| Year | 2025 |
|---|---|
| Promoters | 33.19% |
| DII | 23.22% |
| FII | 18.28% |
| Public | 22.89% |
| Others | 2.42% |
Charges & Borrowings of Arman Engineering Projects Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 25 Aug 2020 | Indian Bank | ₹1.18 Cr | Open |
| 13 May 2015 | Hdfc Bank Limited | ₹55 Lakh | Satisfied |
Total charge records: 2 View all charges
Employees and EPFO Compliance at Arman Engineering Projects Private Limited
Arman Engineering Projects Private Limited has a workforce of 4 employees as of Mar 21, 2024.
Employee Count & EPFO Data of Arman Engineering Projects Private Limited
Access employee headcount trends, monthly PF payment records, EPFO establishment details, and compliance data.
GST Compliance of Arman Engineering Projects Private Limited
GSTIN & GST Filing Data of Arman Engineering Projects Private Limited
Access GSTIN registrations, state-wise filing compliance, HSN/SAC codes, and detailed goods & services data.
Credit Ratings, Litigation & Regulatory Alerts for Arman Engineering Projects Private Limited
Credit Ratings, Legal Cases & Regulatory Alerts of Arman Engineering Projects Private Limited
Access complete credit rating history, litigation records, regulatory alerts, and compliance data.
MSME Payment Delays by Arman Engineering Projects Private Limited
MSME Payment Delays by Arman Engineering Projects Private Limited
Track payments outstanding to micro and small enterprise vendors, as disclosed in half-yearly MSME-1 returns filed with the MCA.
Subsidiaries & Group Companies of Arman Engineering Projects Private Limited
Subsidiaries & Group Companies of Arman Engineering Projects Private Limited
See the full corporate group - holding company, subsidiaries, associates and joint ventures of Arman Engineering Projects Private Limited with ownership details.
MCA Filings & Documents of Arman Engineering Projects Private Limited
MCA Filings & Documents of Arman Engineering Projects Private Limited
Download official documents filed with the Ministry of Corporate Affairs - from incorporation papers to the latest annual filings.
Recent Activity on Arman Engineering Projects Private Limited
Frequently Asked Questions about Arman Engineering Projects Private Limited
Arman Engineering Projects Private Limited is an active private limited company in the consumer electronics and durables sector based in Nayagarh, Orissa, India. It was incorporated on 08 March 2011 (15+ years old) and is registered under CIN U45303OR2011PTC013267. The company has 4 employees.
Arman Engineering Projects Private Limited reported revenue of ₹2.51 Cr for FY 2025 (up 371.00% YoY).
The current directors of Arman Engineering Projects Private Limited are:
The primary industry of Arman Engineering Projects Private Limited is consumer electronics and durables. The company specifically operates in electronic appliances retail and distribution. The company is currently active in this sector.
Arman Engineering Projects Private Limited can be reached at the registered office: Plot No – 13074146 Lane – 6 Mishra Colony, Nayagarh, Orissa, India – 752069.
The authorised capital is ₹10 Lakh, and the paid-up capital is ₹9.78 Lakh.