
About Ars Infrastructure Project Private Limited
Data last updated:
Ars Infrastructure Project Private Limited is a private limited company based in Vadodara, Gujarat, India. It operates in the construction or demolition equipment segment of the construction sector. It was incorporated on 05 June 2018 and has been in existence for over 8 years.
The company is registered with the Registrar of Companies (ROC), Ahmedabad, under CIN U45500GJ2018PTC102666. Its GSTIN is 24AACCU2580J1ZA (Gujarat). The company holds 3 GST registrations, all of them active.
The company has an authorised share capital of ₹1 Lakh and a paid-up capital of ₹1 Lakh. It is led by directors Kanchan Samanta and Chandankumar Harendrakumar Samanta.
Its last annual general meeting (AGM) was held on 29 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at Office No./Tf – 306 The Space Opp.Signet Plaza Krunal Cross Rd Gotri, Vadodara, Gujarat, India – 390021.
As per the financials filed for FY 2024, the company reported a revenue of ₹1.83 Cr, reflecting significant growth compared to the previous year. For the same year it recorded a net profit of ₹10.48 Lakh (net margin 5.7%) and EBITDA of ₹15.33 Lakh (EBITDA margin 8.4%). Revenue has grown at a compounded annual rate (CAGR) of 104% over three years and 11% over five years.
The company has about 28 employees on its provident fund (EPFO) records.
As per MCA filings, the company has open charges of ₹1.95 Cr on record.
For more details, the company can be reached via its website arsinfrastructure.com.
- EmailLocked
- TelephoneLocked
- Website
- Social MediaLocked
- Registered AddressOffice No./Tf – 306 The Space Opp.Signet Plaza Krunal Cross Rd Gotri, Vadodara, Gujarat, India – 390021
- IndustryConstruction, Construction Or Demolition Equipment, Renting
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of Ars Infrastructure Project Private Limited
The main business activity of Ars Infrastructure Project is construction. In detail, this covers demolition & site preparation, electrical, plumbing & other specialized construction activities.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | F3 | Demolition & site preparation, Electrical, plumbing & other Specialized construction Activities | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Ars Infrastructure Project Private Limited FY 2025 filings available
Ars Infrastructure Project Private Limited reported revenue of ₹1.83 Cr (up 214% YoY) for FY 2024.
Compounded Annual Growth Rate (CAGR) of Ars Infrastructure Project Private Limited
Revenue has grown at a compounded annual rate (CAGR) of 11% over five years, including 214% growth in the latest year. EBITDA rose 249% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of Ars Infrastructure Project Private Limited
| Metrics | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹15.33 Lakh | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | ₹10.48 Lakh | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of Ars Infrastructure Project Private Limited
| Metrics | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 8.4% | •••• | •••• | •••• | •••• |
| Net Profit Margin | 5.7% | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Ars Infrastructure Project are in the company report.
Financial statements from FY 2019
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of Ars Infrastructure Project Private Limited
Ars Infrastructure Project Private Limited is compared with the companies closest to it by revenue in the Infrastructure industry (Construction Services). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Akb Techflow Private Limited | ₹1.83 Cr (FY 2024) | •••• | •••• | 11.0% | •••• | Cuttack, Odisha, India |
| RK Enterprises India Private Limited | ₹1.83 Cr (FY 2025) | •••• | •••• | 50.0% | •••• | Indore, Madhya Pradesh, India |
| Ambey Nistha Automotives Private Limited | ₹1.83 Cr (FY 2018) | •••• | •••• | •••• | Patna, Bihar, India | |
| Lacimehc Protech Private Limited | ₹1.83 Cr (FY 2018) | •••• | •••• | 583.0% | •••• | Vadodara, Gujarat, India |
| Mirsons Construction Private Limited | ₹1.83 Cr (FY 2025) | •••• | •••• | 1774.0% | •••• | Jammu and Kashmir, India |
| Ars Infrastructure Project Private Limited this company | ₹1.83 Cr (FY 2024) | •••• | •••• | 214.0% | •••• | Vadodara, Gujarat, India |
| Samhan Constructions & Electric Company (India) Private Limited | ₹1.83 Cr (FY 2021) | •••• | •••• | -85.0% | •••• | Chennai, Tamil Nadu, India |
| Qualcon Engineering Solutions (Pune) Private Limited | ₹1.83 Cr (FY 2025) | •••• | •••• | 10.0% | •••• | Pune, Maharashtra, India |
| Mechause India Private Limited | ₹1.83 Cr (FY 2024) | •••• | •••• | 242.0% | •••• | Indore, Madhya Pradesh, India |
| Fidus Trading Ltd | ₹1.82 Cr (FY 2024) | •••• | •••• | -74.0% | •••• | Kolkata, West Bengal, India |
| Jes Engineering Company Private Limited | ₹1.82 Cr (FY 2024) | •••• | •••• | -37.0% | •••• | New Delhi, Delhi, India |
Peers are the five companies nearest above and the five nearest below Ars Infrastructure Project by revenue in the Infrastructure industry (Construction Services), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Board of Directors of Ars Infrastructure Project Private Limited
Ars Infrastructure Project has 2 current directors and 1 former director. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Kanchan Samanta | Director | 05 Jun 2018 | 8 Years 4 Months | Current |
| Chandankumar Harendrakumar Samanta | Director | 05 Jun 2018 | 8 Years 4 Months | Current |
Ownership and Shareholding of Ars Infrastructure Project Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Ars Infrastructure Project Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 26 Jun 2023 | Others | ₹1.95 Cr | Open |
Total charge records: 1 View all charges
Employees and EPFO Compliance at Ars Infrastructure Project Private Limited
Ars Infrastructure Project Private Limited has a workforce of 28 employees as of Apr 10, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on Ars Infrastructure Project Private Limited
Ars Infrastructure Project Private Limited has 4 board changes on record since 2018: 3 appointments and 1 cessation. The latest: Parthasarthi Nirapada Ghosh ceased to be Director on 22 Jun 2018.
Credit Ratings, Litigation & Regulatory Alerts for Ars Infrastructure Project Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by Ars Infrastructure Project Private Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Ars Infrastructure Project Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Ars Infrastructure Project Private Limited
Ars Infrastructure Project has 3 GST registrations: 3 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 24AACCU2580J1ZA | Gujarat | Active | 16 Jun 2018 |
| 08AACCU2580J1Z4 | Rajasthan | Active | 10 Aug 2018 |
| 37AACCU2580J1Z3 | Andhra Pradesh | Active | 17 Dec 2019 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Ars Infrastructure Project Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Ars Infrastructure Project Private Limited
Ars Infrastructure Project is an active private limited company based in Vadodara, Gujarat, India. The company works in construction or demolition equipment, within the construction industry. It was incorporated on 05 June 2018 (8+ years old) and is registered under CIN U45500GJ2018PTC102666.
Ars Infrastructure Project reported revenue of ₹1.83 Cr for FY 2024 (up 214% YoY).
Ars Infrastructure Project has 2 current directors:
- Kanchan Samanta - Director
- Chandankumar Harendrakumar Samanta - Director
Ars Infrastructure Project reported a net profit of ₹10.48 Lakh (net margin 5.7%) and EBITDA of ₹15.33 Lakh (EBITDA margin 8.4%) for FY 2024, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of Ars Infrastructure Project is 104% over three years and 11% over five years. In the latest year (FY 2024) revenue rose 214%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of Ars Infrastructure Project is 24AACCU2580J1ZA, registered in Gujarat. The company has 3 GST registrations in all, of which 3 are active. Other active GSTINs include 08AACCU2580J1Z4 (Rajasthan), 37AACCU2580J1Z3 (Andhra Pradesh).
The CIN (Corporate Identification Number) of Ars Infrastructure Project is U45500GJ2018PTC102666. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Ars Infrastructure Project was incorporated on 05 June 2018, making it 8+ years old. It is registered with the Registrar of Companies, Ahmedabad.
The peers of Ars Infrastructure Project by revenue are Akb Techflow Private Limited, RK Enterprises India Private Limited, Ambey Nistha Automotives Private Limited, Lacimehc Protech Private Limited, Mirsons Construction Private Limited and 5 more, all in the Infrastructure industry (Construction Services).
Parthasarthi Nirapada Ghosh ceased to be Director on 22 Jun 2018. Chandankumar Harendrakumar Samanta was appointed as Director on 05 Jun 2018. Kanchan Samanta was appointed as Director on 05 Jun 2018. Ars Infrastructure Project has 4 board changes on record in total.
Ars Infrastructure Project can be reached through the website arsinfrastructure.com. Its registered office is in Vadodara, Gujarat, India.