
CIN: U70102KA1998PTC023632Bengaluru, Karnataka, India
About Bearys Infrastructure and Construction Engineering Private Limited
Data last updated:
Bearys Infrastructure and Construction Engineering Private Limited is a private limited company based in Bengaluru, Karnataka, India. It operates in the construction services segment of the infrastructure sector. It was incorporated on 17 April 1998 and has been in existence for over 28 years.
The company is registered with the Registrar of Companies (ROC), Bangalore, under CIN U70102KA1998PTC023632. It holds 2 GST registrations, all of them active, including GSTIN 27AAACB8025F1ZY (Maharashtra). The company has an authorised share capital of ₹5 Cr and a paid-up capital of ₹1 Cr. It has 4 current directors, including Mohidin Mazhar Syed Beary and Syed Mohamed Moidin Beary.
As per the financials filed for FY 2024, the company reported a revenue of ₹14.98 Cr, a decline of 64% compared to the previous year. It closed the year with a net profit.
Company details
- MCA compliance: Active Compliant
- Private Limited Company
- Registration number 023632
- Incorporated 17 April 1998
- Authorised capital ₹5 Cr
- Turnover of ₹10 crore to ₹100 crore
- Revenue ₹14.98 Cr in FY 2024
- Company limited by shares
- Non-government company
- Class: Private
- Business activity, as per the annual return of FY 2024: Buildings
Contact details
Bearys Infrastructure and Construction Engineering Private Limited's registered office is in Bengaluru, Karnataka. Its website is bearysgroup.com.
- Email@bearysgroup.com
- Website
- Registered AddressBEARYS HORIZON 4th FLOOR WOOD STREET, Bengaluru, Karnataka, India – 560025
- City: Bengaluru
- State: Karnataka
- PIN Code: 560025
- Financial statements and ratios, year by year
- Directors, KMP and signatories
- Shareholding and group structure
- Charges, legal cases and credit ratings
Company history
- Previous name
- Beary's Infrastructure Development Private Limited
- Previous CIN
- U07010KA1998PTC023632
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Key highlights
- Revenue fell 64% in the latest year (FY 2024)
- Company status is active and it is marked ACTIVE compliant by the MCA
- In existence for over 28 years
- Reported a net profit in the latest year (FY 2024)
- All 3 charges on record are satisfied
- 4 current directors
- Paid-up capital of ₹1 Cr
- 2 active GST registrations
Business activity
The main business activity of Bearys Infrastructure and Construction Engineering is construction. In detail, this covers buildings.
| Main activity group code | Main activity | Business activity code | Business activity | Share of turnover |
|---|---|---|---|---|
| F | Construction | F1 | Buildings |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Bearys Infrastructure and Construction Engineering Private Limited
FY 2025 filings availableBearys Infrastructure and Construction Engineering Private Limited reported revenue of ₹14.98 Cr (down 64% YoY) for FY 2024.
Compounded Annual Growth Rate (CAGR)
Revenue has declined at a compounded annual rate (CAGR) of 1% over five years, including a 64% fall in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Summary
The latest five years are shown here. The company report carries every year filed since 2015.
| Summary | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|
| Revenue | 14.98 Cr | ||||
| EBITDA | |||||
| EBITDA Margin | |||||
| Profit After Tax | |||||
| PAT Margin | |||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since 2015, up to FY 2023-24. The latest four years are previewed here. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | ||||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Liquidity ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since 2015
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Bearys Infrastructure and Construction Engineering Private Limited
Bearys Infrastructure and Construction Engineering has 4 current directors and 4 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Mohidin Mazhar Syed Beary | Director | 01 Oct 2009 | 17 yrs 1 mo | Current |
| Syed Mohamed Moidin Beary | Director | 17 Apr 1998 | 28 yrs 7 mos | Current |
| Abubakar Siddique Beary | Director | 17 Apr 1998 | 28 yrs 7 mos | Current |
| Mohammed Ashraf Beary | Director | 17 Apr 1998 | 28 yrs 7 mos | Current |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Bearys Infrastructure and Construction Engineering Private Limited is compared with the 10 companies closest to it by revenue in the Infrastructure industry (Construction Services), with the same principal business activity (buildings), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Tectus Infra Private Limited | ₹15.13 Cr FY 2024 | 564.0% | Coimbatore, Tamil Nadu, India | |||
| Balaji Ingenieria Private Limited | ₹15.11 Cr FY 2024 | -7.0% | Bokaro, Jharkhand, India | |||
| Mezdoo Engineering and Construction Private Limited | ₹15.11 Cr FY 2024 | 97.0% | Jagatsinghapur, Odisha, India | |||
| GGP Buildtech Private Limited | ₹15.08 Cr FY 2016 | 4425.0% | Kharar, Punjab, India | |||
| Arugonda Infratech Private Limited | ₹15.07 Cr FY 2024 | -22.0% | Secunderabad, Telangana, India | |||
| Destiny Enviro Solutions Private Limited | ₹15 Cr FY 2025 | 10.0% | Kalyan, Maharashtra, India | |||
| Bearys Infrastructure and Construction Engineering Private Limitedthis company | ₹14.98 Cr FY 2024 | -64.0% | Bengaluru, Karnataka, India | |||
| Ireo Victory Valley Private Limited | ₹14.95 Cr FY 2025 | 374.0% | New Delhi, Delhi, India | |||
| Aworks Design Private Limited | ₹14.91 Cr FY 2025 | 14.0% | Gurugram, Haryana, India | |||
| JBR Constructions Private Limited | ₹14.88 Cr FY 2024 | 154.0% | Hyderabad, Telangana, India | |||
| Goldendreams Buildcon Private Limited | ₹14.84 Cr FY 2015 | 4.0% | Chhatrapati Sambhajinagar, Maharashtra, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Auditor
The statutory auditor of Bearys Infrastructure and Construction Engineering Private Limited is KUMBHAT & CO (firm registration number 001609S), as per its latest filing for the financial year 2022.
- The statutory auditor of every financial year filed since 2015
- Audit firm, signing partner, membership number and firm registration number
- Whether each year's audit report was qualified, with the auditors' remarks
- Whether CARO applied, and the CARO remarks
- Auditor resignations, where one was filed
Shareholding
The shareholding of Bearys Infrastructure and Construction Engineering Private Limited is on record for 8 financial years, from FY 2015 to FY 2022, split between promoters, domestic institutions, public shareholders and others. The latest 5 years are previewed here.
| Shareholder category | FY 2022 | FY 2021 | FY 2020 | FY 2019 | FY 2018 |
|---|---|---|---|---|---|
| Promoters | |||||
| Domestic institutional investors (DII) | |||||
| Public | |||||
| Others |
- Promoter and public holding for every financial year
- Number of shares and percentage, category by category
- Shares held by each director and KMP
- Share transfers with transferor, transferee and number of shares
Charges & borrowings
Bearys Infrastructure and Construction Engineering Private Limited has 3 charge records registered with the MCA, created between 2010 and 2014: none open and 3 satisfied.
Satisfied charges by lender
Latest charges
| Created on | Charge ID | Lender | Amount | Status |
|---|---|---|---|---|
| 06 Jan 2014 | 10471107 | Vijaya Bank | ₹10.4 Cr | Satisfied |
| 18 Sep 2013 | 10450361 | Vijaya Bank | ₹1.83 Cr | Satisfied |
| 31 Aug 2010 | 10243865 | Vijaya Bank | ₹10 Cr | Satisfied |
- Every charge record
- Creation, last modification and satisfaction date of each charge
- Open and satisfied amount with every lender
- Each lender's share of the open amount
GST
Bearys Infrastructure and Construction Engineering has 2 GST registrations: 2 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 27AAACB8025F1ZY | Maharashtra | Active | 15 Mar 2021 |
| 29AAACB8025F1ZU | Karnataka | Active | 01 Jul 2017 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Bearys Infrastructure and Construction Engineering Private Limited has 8 board changes on record since 1998: 4 appointments and 4 cessations. The latest: Abubakar Siddique Beary ceased to be Whole-Time Director on 01 Apr 2014.
| Date | Type | Event |
|---|---|---|
| 1 year 1 month ago | AGM | Bearys Infrastructure And Construction Engineering Private Limited last Annual general meeting of members was held on 30 Sep 2025 as per latest MCA records. |
| 1 year 7 months ago | Filing | Bearys Infrastructure And Construction Engineering Private Limited has filed its annual Financial statements for the year ended 31 Mar 2025 with ROC Bangalore. |
| 9 years ago | Charges | A charge registered on 06 Jan 2014 via Charge ID 10471107 with Vijaya Bank was fully satisfied on 11 Apr 2017. |
| 11 years ago | Charges | A charge with Vijaya Bank of Rs. 10.40 Cr registered on 06 Jan 2014 with Charge ID 10471107 was modified on 23 Jul 2015. |
| 12 years ago | Charges | A charge registered on 18 Sep 2013 via Charge ID 10450361 with Vijaya Bank was fully satisfied on 12 Jun 2014. |
| 12 years ago | Ceased | Abubakar Siddique Beary ceased to be Whole-Time Director. |
| 12 years ago | Ceased | Mohamed Beary Ashraf ceased to be Managing Director. |
| 12 years ago | Ceased | Mohidin Mazhar Syed Beary ceased to be Whole-Time Director. |
Also available in the company report of Bearys Infrastructure and Construction Engineering Private Limited
Legal cases
- Court and tribunal cases, with case number, court and year
- Parties to each case and its status
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Bearys Infrastructure and Construction Engineering is an active private limited company based in Bengaluru, Karnataka, India. The company works in construction services, within the infrastructure industry. It was incorporated on 17 April 1998 (28+ years old) and is registered under CIN U70102KA1998PTC023632.
Bearys Infrastructure and Construction Engineering has 4 current directors:
- Mohidin Mazhar Syed Beary - Director
- Syed Mohamed Moidin Beary - Director
- Abubakar Siddique Beary - Director
- Mohammed Ashraf Beary - Director
The latest financial statements of Bearys Infrastructure and Construction Engineering on record with the MCA are for the year ended 31 March 2025. Its last annual general meeting was held on 30 September 2025. Year-wise statements from 2015 are in the company report.
The GSTIN of Bearys Infrastructure and Construction Engineering is 27AAACB8025F1ZY, registered in Maharashtra. The company has 2 GST registrations in all, of which 2 are active. Other active GSTINs include 29AAACB8025F1ZU (Karnataka).
The CIN (Corporate Identification Number) of Bearys Infrastructure and Construction Engineering is U70102KA1998PTC023632. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Bearys Infrastructure and Construction Engineering was incorporated on 17 April 1998, making it 28+ years old. It is registered with the Registrar of Companies, Bangalore.
The peers of Bearys Infrastructure and Construction Engineering by revenue are Tectus Infra Private Limited, Balaji Ingenieria Private Limited, Mezdoo Engineering and Construction Private Limited, GGP Buildtech Private Limited, Arugonda Infratech Private Limited and 5 more, all in the Infrastructure industry (Construction Services), with the same principal business activity (buildings).
Abubakar Siddique Beary ceased to be Whole-Time Director on 01 Apr 2014. Mohamed Beary Ashraf ceased to be Managing Director on 01 Apr 2014. Mohidin Mazhar Syed Beary ceased to be Whole-Time Director on 01 Apr 2014. Bearys Infrastructure and Construction Engineering has 8 board changes on record in total.
Bearys Infrastructure and Construction Engineering can be reached through the website bearysgroup.com. Its registered office is in Bengaluru, Karnataka, India.
The registered office of Bearys Infrastructure and Construction Engineering is at BEARYS HORIZON 4th FLOOR WOOD STREET, Bengaluru, Karnataka, India – 560025.
Bearys Infrastructure and Construction Engineering operates in the infrastructure industry, in the construction services segment.

