About Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Data last updated: 26 July 2025
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited was a private limited company based in Mumbai, Maharashtra, India, operated as a subsidiary of Capacit'e Infraprojects Limited. The company has been amalgamated - it was merged with another entity and no longer exists as a separate legal entity. It specialised in general infrastructure services, a part of the broader infrastructure and utilities sector. Incorporated on 22 May 2013.
Registered with ROC Mumbai under CIN U45400MH2013PTC243496.
Capital: an authorised share capital of ₹10 Lakh and a paid-up capital of ₹9.5 Lakh. It was led by directors Rohit Ramnath Katyal and Rahul Ramnath Katyal.
Last AGM: 20 September 2023. Financial statements filed for year ended 31 March 2023. Office: 602 – 607 6Th Floor Shrikant Chambers Adjacent To R.K.Studios Sion Trombay Road Chembur, Mumbai, Maharashtra, India – 400071.
It operated as a subsidiary of Capacit'e Infraprojects Limited.
As per MCA filings, the company had satisfied charges of ₹1.4 Cr on record.
The company has been merged (amalgamated) with another entity and no longer exists separately. Business activities, if any, continue under the successor entity. The last known website on record is capacite.in.
-
Email*****@*****.com
-
Telephone+91-****-******
-
Website
-
Social Media**************
-
Registered Address602 – 607 6Th Floor Shrikant Chambers Adjacent To R.K.Studios Sion Trombay Road Chembur, Mumbai, Maharashtra, India – 400071
-
IndustryInfrastructure and Utilities, General Infrastructure Services
- Historical Financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Litigation, compliance and MCA filings
- PDF report delivered after checkout
Business Activity of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited operates primarily in the construction sector. The company has 2 registered business activity segments, reflecting its diverse operational portfolio.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| ********* | Construction | ********* | Buildings | ********* |
| ********* | Construction | ********* | Buildings | ********* |
Auditor Details of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited is audited by Darshan Bheda & Associates for the financial year 2023. The auditor plays a crucial role in ensuring financial transparency and compliance with accounting standards.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| Darshan Bheda & Associates | blur-value | blur-value | blur-value |
Board of Directors of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited is governed by 2 directors who oversee the company's operations and strategic decisions.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
|
Rohit Ramnath Katyal
Also directs:
Capacit'e Infraprojects Limited
|
Director | 22 May 2013 | 13 Years 1 Months | As last reported |
|
Rahul Ramnath Katyal
Also directs:
Capacit'e Infraprojects Limited, Tpl-Cil Construction Llp, Cepl-Adl Construction Llp and 5 more
|
Director | 22 May 2013 | 13 Years 1 Months | As last reported |
Financials of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited FY 2023 filings available
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited reported revenue of ₹- (down -100.00% YoY) for FY 2023. Profit growth despite declining revenue indicates effective cost management and margin discipline.
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Revenue | |||||
| Revenue from Operations | ***** | ***** | ***** | ***** | ***** |
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Other Income | ***** | ***** | ***** | ***** | ***** |
| Total Revenue | ***** | ***** | ***** | ***** | ***** |
| Expenses | |||||
| Total Expenses | ***** | ***** | ***** | ***** | ***** |
| Raw Material Cost | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory FG | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory WIP | ***** | ***** | ***** | ***** | ***** |
| Purchase of Traded Goods | ***** | ***** | ***** | ***** | ***** |
| Employee Cost | ***** | ***** | ***** | ***** | ***** |
| Managerial Remuneration | ***** | ***** | ***** | ***** | ***** |
| Audit Fees | ***** | ***** | ***** | ***** | ***** |
| Insurance | ***** | ***** | ***** | ***** | ***** |
| Power & Fuel | ***** | ***** | ***** | ***** | ***** |
| Interest | ***** | ***** | ***** | ***** | ***** |
| Depreciation | ***** | ***** | ***** | ***** | ***** |
| Other Expenses | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| EBITDA (Operating Profit) | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| Exceptional Items | ***** | ***** | ***** | ***** | ***** |
| Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Exceptional & Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Tax & Net Profit | |||||
| Tax Expense | ***** | ***** | ***** | ***** | ***** |
| Current Tax | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax | ***** | ***** | ***** | ***** | ***** |
| Profit from Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Tax on Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Profit | ***** | ***** | ***** | ***** | ***** |
| Net Margin % | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Shareholders' Funds | |||||
| Total Shareholders' Funds | ***** | ***** | ***** | ***** | ***** |
| Equity Capital | ***** | ***** | ***** | ***** | ***** |
| Reserves & Surplus | ***** | ***** | ***** | ***** | ***** |
| Money Against Warrants | ***** | ***** | ***** | ***** | ***** |
| Other Equity | ***** | ***** | ***** | ***** | ***** |
| Non-Current Liabilities | |||||
| Total Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Liabilities | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Current Liabilities | |||||
| Total Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Trade Payables | ***** | ***** | ***** | ***** | ***** |
| Other Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Total Equity & Liabilities | ***** | ***** | ***** | ***** | ***** |
| Non-Current Assets | |||||
| Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Tangible Assets | ***** | ***** | ***** | ***** | ***** |
| Intangible Assets | ***** | ***** | ***** | ***** | ***** |
| Capital WIP | ***** | ***** | ***** | ***** | ***** |
| Intangibles Under Dev | ***** | ***** | ***** | ***** | ***** |
| Investments | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Assets | ***** | ***** | ***** | ***** | ***** |
| LT Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Assets | |||||
| Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Investments | ***** | ***** | ***** | ***** | ***** |
| Inventories | ***** | ***** | ***** | ***** | ***** |
| Trade Receivables | ***** | ***** | ***** | ***** | ***** |
| Cash & Bank Balance | ***** | ***** | ***** | ***** | ***** |
| ST Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Current Assets | ***** | ***** | ***** | ***** | ***** |
| Total Assets | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Cash from Operating Activities (CFO) | |||||
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Non-Cash Adjustments | ***** | ***** | ***** | ***** | ***** |
| + Interest Expense | ***** | ***** | ***** | ***** | ***** |
| + Depreciation | ***** | ***** | ***** | ***** | ***** |
| +/- Unrealized Forex | ***** | ***** | ***** | ***** | ***** |
| - Dividend Income | ***** | ***** | ***** | ***** | ***** |
| - Interest Income | ***** | ***** | ***** | ***** | ***** |
| +/- Other Non-Cash Items | ***** | ***** | ***** | ***** | ***** |
| Changes in Working Capital | ***** | ***** | ***** | ***** | ***** |
| +/- Inventory | ***** | ***** | ***** | ***** | ***** |
| +/- Debtors | ***** | ***** | ***** | ***** | ***** |
| +/- Creditors | ***** | ***** | ***** | ***** | ***** |
| Reconciliation Adjustments | ***** | ***** | ***** | ***** | ***** |
| Cash Generated from Operations | ***** | ***** | ***** | ***** | ***** |
| Income Taxes Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFO (Cash from Operations) | ***** | ***** | ***** | ***** | ***** |
| Cash from Investing Activities (CFI) | |||||
| Acquisitions & Disposals | ***** | ***** | ***** | ***** | ***** |
| Disposal of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Acquisition of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Capex | ***** | ***** | ***** | ***** | ***** |
| Purchase of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Sale of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Other Investing Cash Flows | ***** | ***** | ***** | ***** | ***** |
| Net CFI (Cash from Investing) | ***** | ***** | ***** | ***** | ***** |
| Cash from Financing Activities (CFF) | |||||
| Equity Issuance | ***** | ***** | ***** | ***** | ***** |
| Debt Raised | ***** | ***** | ***** | ***** | ***** |
| Debt Repaid | ***** | ***** | ***** | ***** | ***** |
| Dividends Paid | ***** | ***** | ***** | ***** | ***** |
| Interest Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFF (Cash from Financing) | ***** | ***** | ***** | ***** | ***** |
| Net Cash Position | |||||
| Net Change in Cash (Pre-Forex) | ***** | ***** | ***** | ***** | ***** |
| Closing Cash & Equivalents | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Liquidity | |||||
| Current Ratio | ***** | ***** | ***** | ***** | ***** |
| Quick Ratio | ***** | ***** | ***** | ***** | ***** |
| Cash Ratio | ***** | ***** | ***** | ***** | ***** |
| Efficiency | |||||
| Inventory Days | ***** | ***** | ***** | ***** | ***** |
| Debtor Days | ***** | ***** | ***** | ***** | ***** |
| Creditor Days | ***** | ***** | ***** | ***** | ***** |
| Cash Conversion Cycle | ***** | ***** | ***** | ***** | ***** |
| Asset Turnover | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| Net Profit Margin % | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| ROE % | ***** | ***** | ***** | ***** | ***** |
| ROCE % | ***** | ***** | ***** | ***** | ***** |
| Net Worth Margin % | ***** | ***** | ***** | ***** | ***** |
| Growth | |||||
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Leverage | |||||
| Equity Multiplier | ***** | ***** | ***** | ***** | ***** |
| Debt / EBITDA | ***** | ***** | ***** | ***** | ***** |
| Solvency | |||||
| D/E Ratio | ***** | ***** | ***** | ***** | ***** |
| ICR | ***** | ***** | ***** | ***** | ***** |
Consolidated Statements
Income Statement, Balance Sheet, Cash Flow & Ratios available in the full report.
Shareholding Pattern of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
As of FY 2023, Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited's shareholding pattern shows 100.00% by promoters. The promoters hold a majority stake, indicating strong promoter control.
| Year | 2025 |
|---|---|
| Promoters | 33.19% |
| DII | 23.22% |
| FII | 18.28% |
| Public | 22.89% |
| Others | 2.42% |
Charges & Borrowings of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 31 Aug 2013 | Icici Bank Limited | ₹1.4 Cr | Satisfied |
Total charge records: 1 View all charges
Employees and EPFO Compliance at Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
View historical data on people associated with Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited, including employment history and EPFO contributions.
Employee Count & EPFO Data of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Access employee headcount trends, monthly PF payment records, EPFO establishment details, and compliance data.
GST Compliance of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
GSTIN & GST Filing Data of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Access GSTIN registrations, state-wise filing compliance, HSN/SAC codes, and detailed goods & services data.
Credit Ratings, Litigation & Regulatory Alerts for Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Credit Ratings, Legal Cases & Regulatory Alerts of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Access complete credit rating history, litigation records, regulatory alerts, and compliance data.
MSME Payment Delays by Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
MSME Payment Delays by Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Track payments outstanding to micro and small enterprise vendors, as disclosed in half-yearly MSME-1 returns filed with the MCA.
Subsidiaries & Group Companies of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Subsidiaries & Group Companies of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
See the full corporate group - holding company, subsidiaries, associates and joint ventures of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited with ownership details.
MCA Filings & Documents of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
MCA Filings & Documents of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Download official documents filed with the Ministry of Corporate Affairs - from incorporation papers to the latest annual filings.
Recent Activity on Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Recent News on Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Frequently Asked Questions about Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited has been "Amalgamated" (merged) as per MCA records. The company was combined with another entity and no longer exists as a separate legal entity. Business activities, if any, continue under the successor entity.
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited is a amalgamated private limited company in the infrastructure and utilities sector based in Mumbai, Maharashtra, India. It was incorporated on 22 May 2013 and is registered under CIN U45400MH2013PTC243496. The company was amalgamated as per MCA records and no longer exists as a legal entity.
Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited was incorporated on 22 May 2013. Registered with ROC Mumbai.
The current directors of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited are:
The CIN (Corporate Identification Number) of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited is U45400MH2013PTC243496. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
The primary industry of Cipl-Ppsl-Yongnam Joint Venture Constructions Private Limited is infrastructure and utilities. The company specifically operates in general infrastructure services.