
Daya Engineering Works (Sleeper) Limited
About Daya Engineering Works (Sleeper) Limited
Data last updated:
Daya Engineering Works (Sleeper) Limited is a public limited company based in Chatra, Jharkhand, India. It operates in the cement and cement products segment of the manufacturing sector. It was incorporated on 22 May 1982 and has been in existence for over 44 years.
The company is registered with the Registrar of Companies (ROC), Ranchi, under CIN U27102JH1982PLC001652. Its GSTIN is 10AAACD8204A2ZN (Bihar). The company holds 9 GST registrations, of which 1 is active.
The company has an authorised share capital of ₹20 Cr and a paid-up capital of ₹12.6 Cr. It was formerly known as Daya Engineering Works (Sleeper) Private Limited. It is led by directors including Mukesh Kumar and Vinay Kumar.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at House Of Shri Mukesh Prasad Gram Khuti Kewal Khurd Hunter Gunj, Chatra, Jharkhand, India – 825420.
As per the financials filed for FY 2025, the company reported a revenue of ₹17.78 Cr, a growth of 32% compared to the previous year. For the same year it recorded a net profit of ₹8.17 Cr (net margin 46%) and EBITDA of ₹9.41 Cr (EBITDA margin 52.9%). Revenue has grown at a compounded annual rate (CAGR) of 95% over three years.
The company has about 29 employees on its provident fund (EPFO) records.
As per MCA filings, the company has open charges of ₹10 Cr and satisfied charges of ₹69.65 Cr on record. Court records list 31 cases involving the company, including 22 filed by the company and 6 filed against it; 6 cases are pending.
The current compliance status is marked as compliant by the Registrar of Companies.
- EmailLocked
- TelephoneLocked
- WebsiteLocked
- Social MediaLocked
- Registered AddressHouse Of Shri Mukesh Prasad Gram Khuti Kewal Khurd Hunter Gunj, Chatra, Jharkhand, India – 825420
- IndustryManufacturing, Cement & Cement Products
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of Daya Engineering Works (Sleeper) Limited
The main business activity of Daya Engineering Works (Sleeper) is construction. In detail, this covers roads, railways, utility projects.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | F2 | Roads, railways, Utility projects | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Daya Engineering Works (Sleeper) Limited FY 2025 filings available
Daya Engineering Works (Sleeper) Limited reported revenue of ₹17.78 Cr (up 32% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR) of Daya Engineering Works (Sleeper) Limited
Revenue has grown at a compounded annual rate (CAGR) of 95% over three years, including 32% growth in the latest year. EBITDA rose 436% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of Daya Engineering Works (Sleeper) Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹9.41 Cr | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | ₹8.17 Cr | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of Daya Engineering Works (Sleeper) Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 52.9% | •••• | •••• | •••• | •••• |
| Net Profit Margin | 46% | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Daya Engineering Works (Sleeper) are in the company report.
Financial statements from 2015
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) Limited is compared with the companies closest to it by revenue in the Manufacturing industry (Cement and Cement Products). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| White Roots Infra Private Limited | ₹17.99 Cr (FY 2025) | •••• | •••• | •••• | Mumbai, Maharashtra, India | |
| Garg Redimix Private Limited | ₹17.97 Cr (FY 2025) | •••• | •••• | -11.0% | •••• | Ballabgarh, Haryana, India |
| Nuwayultra Projects Private Limited | ₹17.94 Cr (FY 2025) | •••• | •••• | -7.0% | •••• | Visnagar, Dist: Mehsana, Gujarat, India |
| Six Seasons Services and Consultants Private Limited | ₹17.91 Cr (FY 2024) | •••• | •••• | -40.0% | •••• | Kolkata, West Bengal, India |
| Sangam Prefab Concrete Products Private Limited | ₹17.85 Cr (FY 2025) | •••• | •••• | 27.0% | •••• | Falakata, West Bengal, India |
| Daya Engineering Works (Sleeper) Limited this company | ₹17.78 Cr (FY 2025) | •••• | •••• | 32.0% | •••• | Chatra, Jharkhand, India |
| Triangle Readymix Concrete Private Limited | ₹17.77 Cr (FY 2025) | •••• | •••• | 6.0% | •••• | Jaipur, Rajasthan, India |
| Binit Infratech Private Limited | ₹17.69 Cr (FY 2024) | •••• | •••• | 856.0% | •••• | Asansol, West Bengal, India |
| Global Readymix Private Limited | ₹17.63 Cr (FY 2025) | •••• | •••• | 37.0% | •••• | Darjeeling, West Bengal, India |
| Balaji Swiftcrete Private Limited | ₹17.63 Cr (FY 2025) | •••• | •••• | 988.0% | •••• | Gandhidham, Gujarat, India |
| JCL Cement Private Limited | ₹17.17 Cr (FY 2024) | •••• | •••• | -7.0% | •••• | New Delhi, Delhi, India |
Peers are the five companies nearest above and the five nearest below Daya Engineering Works (Sleeper) by revenue in the Manufacturing industry (Cement and Cement Products), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Auditor Details of Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) Limited is audited by B. S. SAHAY & COMPANY for the financial year 2023.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| B. S. SAHAY & COMPANY | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Board of Directors of Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) has 4 current directors and 21 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Mukesh Kumar Also directs: Daya Rail Infrastructure Private Limited | Director | 11 Dec 2017 | 8 Years 10 Months | Current |
| Vinay Kumar Also directs: Daya Rail Infrastructure Private Limited | Director | 08 Jul 2022 | 4 Years 3 Months | Current |
| Shashikant Pawar | Director | 23 May 2022 | 4 Years 4 Months | Current |
| Dhirendra Agarwal | Additional Director | 19 Nov 2025 | 0 Years 10 Months | Current |
Ownership and Shareholding of Daya Engineering Works (Sleeper) Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Daya Engineering Works (Sleeper) Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 03 Dec 1999 | Ifci Limited | ₹10 Cr | Open |
| 29 May 2008 | Central Bank of India | ₹1.95 Cr | Satisfied |
| 25 Mar 2008 | Punjab National Bank | ₹2.95 Cr | Satisfied |
| 13 Feb 2008 | Indian Overseas Bank(Lead Bank) | ₹13 Cr | Satisfied |
| 20 Apr 2007 | Indian Overseas Bank | ₹2.15 Cr | Satisfied |
Total charge records: 8 View all charges
Legal Cases of Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) Limited has 31 court cases on record: 22 filed by Daya Engineering Works (Sleeper), 6 filed against it, 3 where it is another party. 6 cases are pending and 25 are disposed. Status as checked between 21 Sep 2026 and 05 Oct 2026.
Cases by court
| Court | Cases | Against the company | Pending |
|---|---|---|---|
| High courts | 26 | 3 | 5 |
| District courts | 4 | 3 | 1 |
| Supreme Court | 1 | 0 | 0 |
Cases on record (5 of 31)
| Court | Type of case | Party | Status |
|---|---|---|---|
| Patna High Court | Court case (L.P.A) | Filed by the company against Daya Engineering Works (Sleeper) Limited | Disposed |
| Patna High Court | Court case (CWJC) | Filed by the company against Daya Engineering Works (Sleeper) Limited | Disposed |
| District court, North, Delhi | Civil suit | Filed against the company by Sadhna International Private Limited | Disposed |
| Calcutta High Court | Court case (EC) | Filed by the company against HMP Cement Ltd. | Disposed |
| Patna High Court | Court case (CWJC) | Filed by the company against Union of India | Pending |
Full case history
All 31 cases with case numbers, court, year-wise trend, opposite parties and decision dates are in the company report.
- Every case with its case number
- Year-wise trend
- Opposite parties
- Decision dates and orders
Verified entity values are shown only after access is granted.
Case records are compiled from court listings and may lag the court's own records. A case filed against a company is not a finding against it.
Employees and EPFO Compliance at Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) Limited has a workforce of 29 employees as of Apr 09, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
CIN History of Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) has 2 previous CINs, indicating changes in the company's corporate structure or registration details. The current CIN is U27102JH1982PLC001652, which is the unique identifier assigned by the Registrar of Companies.
| CIN | Status |
|---|---|
| U27102JH1982PLC001652 | Current |
| U00371JH1982PLC001652 | Previous |
| U00371JH1982PTC001652 | Previous |
Recent Activity on Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) Limited has 44 board changes on record since 1982: 24 appointments and 20 cessations. The latest: Dhirendra Agarwal was appointed as Additional Director on 19 Nov 2025.
55 earlier events are listed in the company report.
Credit Ratings, Litigation & Regulatory Alerts for Daya Engineering Works (Sleeper) Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by Daya Engineering Works (Sleeper) Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Daya Engineering Works (Sleeper) Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) has 9 GST registrations: 1 active and 8 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 10AAACD8204A2ZN | Bihar | Active | 19 Jul 2017 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Daya Engineering Works (Sleeper) Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Daya Engineering Works (Sleeper) Limited
Daya Engineering Works (Sleeper) is an active public limited company based in Chatra, Jharkhand, India. The company works in cement and cement products, within the manufacturing industry. It was incorporated on 22 May 1982 (44+ years old) and is registered under CIN U27102JH1982PLC001652.
Daya Engineering Works (Sleeper) reported revenue of ₹17.78 Cr for FY 2025 (up 32% YoY).
Daya Engineering Works (Sleeper) has 4 current directors:
- Mukesh Kumar - Director
- Vinay Kumar - Director
- Shashikant Pawar - Director
- Dhirendra Agarwal - Additional Director
Daya Engineering Works (Sleeper) reported a net profit of ₹8.17 Cr (net margin 46%) and EBITDA of ₹9.41 Cr (EBITDA margin 52.9%) for FY 2025, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of Daya Engineering Works (Sleeper) is 95% over three years. In the latest year (FY 2025) revenue rose 32%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of Daya Engineering Works (Sleeper) is 10AAACD8204A2ZN, registered in Bihar. The company has 9 GST registrations in all, of which 1 is active and 8 are cancelled or inactive.
The CIN (Corporate Identification Number) of Daya Engineering Works (Sleeper) is U27102JH1982PLC001652. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Daya Engineering Works (Sleeper) has 31 court cases on record: 22 filed by the company and 6 filed against it. 6 are pending. Most are in the high courts.
Daya Engineering Works (Sleeper) was incorporated on 22 May 1982, making it 44+ years old. It is registered with the Registrar of Companies, Ranchi.
The peers of Daya Engineering Works (Sleeper) by revenue are White Roots Infra Private Limited, Garg Redimix Private Limited, Nuwayultra Projects Private Limited, Six Seasons Services and Consultants Private Limited, Sangam Prefab Concrete Products Private Limited and 5 more, all in the Manufacturing industry (Cement and Cement Products).
Dhirendra Agarwal was appointed as Additional Director on 19 Nov 2025. Suman Murarka ceased to be Company Secretary on 31 May 2025. Laxmikanta Sharma ceased to be Director on 15 May 2025. Daya Engineering Works (Sleeper) has 44 board changes on record in total.