About Elron Power Systems Private Limited
Data last updated:
Elron Power Systems Private Limited is a private limited company based in Ernakulam, Kerala, India. The company operates in the electricity, gas, steam and air condition supply sector. It was incorporated on 06 April 2017 and has been in existence for over 9 years.
The company is registered with the Registrar of Companies (ROC), Ernakulam, under CIN U74999KL2017PTC048804. It holds 2 GST registrations, of which 1 is active, including GSTIN 32AAECE5993K1ZA (Kerala). The company has an authorised share capital of ₹1 Lakh and a paid-up capital of ₹1 Lakh. It has 2 current directors: Suseela and Vysakh Nair.
As per the financials filed for FY 2024, the company reported a revenue of ₹13.28 Lakh, a growth of 67% compared to the previous year. It closed the year with a net loss.
Company details
- MCA compliance: Active Compliant
- Private Limited Company
- Registration number 048804
- Incorporated 06 April 2017
- Authorised capital ₹1 Lakh
- Turnover up to ₹10 crore
- Revenue ₹13.28 Lakh in FY 2024
- Company limited by shares
- Non-government company
- Class: Private
- Electricity, gas, steam and air condition supply
- As per the annual return of FY 2024
Contact details
Elron Power Systems Private Limited's registered office is in Ernakulam, Kerala. Its website is elronpower.com.
- Email
- Website
- Registered Address12/164 SREEVARAM NANDIKULANGARA MANNAM P O, Ernakulam, Kerala, India – 683520
- City: Ernakulam
- State: Kerala
- PIN Code: 683520
- Financial statements and ratios, year by year
- Directors, KMP and signatories
- Shareholding and group structure
- Charges, legal cases and credit ratings
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Key highlights
Business activity
The main business activity of Elron Power Systems is electricity, gas, steam and air condition supply. In detail, this covers electric power generation, transmission and distribution.
| Main activity group code | Main activity | Business activity code | Business activity | Share of turnover |
|---|---|---|---|---|
| D | Electricity, gas, steam and air condition supply | D1 | Electric power generation, transmission and distribution |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Elron Power Systems Private Limited
FY 2024 filings availableElron Power Systems Private Limited reported revenue of ₹13.28 Lakh (up 67% YoY) for FY 2024.
Compounded Annual Growth Rate (CAGR)
Revenue rose 67% in the latest year, though over five years it has declined at a compounded annual rate (CAGR) of 13%. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Summary
The latest five years are shown here. The company report carries every year filed since FY 2017-18.
| Summary | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|
| Revenue | 13.28 Lakh | ||||
| EBITDA | |||||
| EBITDA Margin | |||||
| Profit After Tax | |||||
| PAT Margin | |||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since FY 2017-18, up to FY 2023-24. The latest four years are previewed here. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | ||||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Liquidity ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since incorporation
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Elron Power Systems Private Limited
Elron Power Systems has 2 current directors and 2 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Suseela | Director | 06 Apr 2017 | 9 yrs 7 mos | Current |
| Vysakh Nair | Additional Director | 09 May 2019 | 7 yrs 6 mos | Current |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Elron Power Systems Private Limited is compared with the 10 companies closest to it by revenue in the same principal business activity (electric power generation, transmission and distribution), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Adolphus Energy Private Limited | ₹13.37 Lakh FY 2019 | 0.0% | Chandigarh, India | |||
| Mytrah Vayu (Tapti) Private Limited | ₹13.3 Lakh FY 2024 | 0.0% | Hyderabad, Telangana, India | |||
| Elron Power Systems Private Limitedthis company | ₹13.28 Lakh FY 2024 | 67.0% | Ernakulam, Kerala, India | |||
| Nak Wind Farm Private Limited | ₹13.27 Lakh FY 2024 | -3.0% | Erode, Tamil Nadu, India | |||
| Ansab Ventures Private Limited | ₹13.25 Lakh FY 2022 | -30.0% | Bengaluru, Karnataka, India | |||
| Sri Nagamma Powers Private Limited | ₹13.25 Lakh FY 2025 | -60.0% | Aruppukkottai, Tamil Nadu, India | |||
| Sathyasai Wind Energy Private Limited | ₹13.23 Lakh FY 2025 | 7.0% | Chennai, Tamil Nadu, India | |||
| Srri Shamundi Spinners Private Limited | ₹13.19 Lakh FY 2024 | 31.0% | Coimbatore, Tamil Nadu, India | |||
| Bhavani Hydro Power Projects Private Limited | ₹13.18 Lakh FY 2025 | -39.0% | Hyderabad, Telangana, India | |||
| Enermass Power Solutions Private Limited | ₹13.16 Lakh FY 2024 | 32.0% | Thrissur, Kerala, India | |||
| Quidel Solar Power Private Limited | ₹13.14 Lakh FY 2022 | 0.0% | Chennai, Tamil Nadu, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Legal cases
Elron Power Systems Private Limited has 1 court case on record: 1 filed against it. All case is pending.
Cases by court
| Court | Cases | Against the company | Pending |
|---|---|---|---|
| High courts | 1 | 1 | 1 |
Cases on record (1 of 1)
| Court | Type of case | Party | Status |
|---|---|---|---|
| High Court of Kerala | Writ petition | Filed against the company | Pending |
- Case number, court and year of every case
- Parties to each case
- Status of each case: pending or disposed
- Cases by court, filed by and filed against the company
Case records are compiled from court listings and may lag the court's own records. A case filed against a company is not a finding against it.
GST
Elron Power Systems has 2 GST registrations: 1 active and 1 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 32AAECE5993K1ZA | Kerala | Active | 01 Jul 2017 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Elron Power Systems Private Limited has 4 board changes on record since 2017: 2 appointments and 2 cessations. The latest: Vijayakumar ceased to be Additional Director on 09 May 2019.
| Date | Type | Event |
|---|---|---|
| 2 years 1 month ago | AGM | Elron Power Systems Private Limited last Annual general meeting of members was held on 30 Sep 2024 as per latest MCA records. |
| 2 years 7 months ago | Filing | Elron Power Systems Private Limited has filed its annual Financial statements for the year ended 31 Mar 2024 with ROC Ernakulam. |
| 7 years ago | Ceased | Vijayakumar ceased to be Additional Director. |
| 7 years ago | Appointed | Vysakh Nair was appointed as Additional Director. |
| 8 years ago | Ceased | Jyothilekshmi Gopalakrishnan ceased to be Director. |
| 9 years ago | Appointed | Suseela was appointed as Director. |
| 06 Apr 2017 | Incorporation | Elron Power Systems Private Limited was registered on 06 Apr 2017 with ROC Ernakulam & aged 9 years 7 months as per MCA records. |
Also available in the company report of Elron Power Systems Private Limited
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Elron Power Systems is an active private limited company based in Ernakulam, Kerala, India. The company works in the electricity, gas, steam and air condition supply industry. It was incorporated on 06 April 2017 (9+ years old) and is registered under CIN U74999KL2017PTC048804.
Elron Power Systems has 2 current directors:
- Suseela - Director
- Vysakh Nair - Additional Director
The latest financial statements of Elron Power Systems on record with the MCA are for the year ended 31 March 2024. Its last annual general meeting was held on 30 September 2024. Year-wise statements from FY 2018 are in the company report.
The GSTIN of Elron Power Systems is 32AAECE5993K1ZA, registered in Kerala. The company has 2 GST registrations in all, of which 1 is active and 1 is cancelled or inactive.
The CIN (Corporate Identification Number) of Elron Power Systems is U74999KL2017PTC048804. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Elron Power Systems has 1 court case on record: 1 filed against it. 1 is pending.
Elron Power Systems was incorporated on 06 April 2017, making it 9+ years old. It is registered with the Registrar of Companies, Ernakulam.
The peers of Elron Power Systems by revenue are Adolphus Energy Private Limited, Mytrah Vayu (Tapti) Private Limited, Nak Wind Farm Private Limited, Ansab Ventures Private Limited, Sri Nagamma Powers Private Limited and 5 more, all in the same principal business activity (electric power generation, transmission and distribution).
Vijayakumar ceased to be Additional Director on 09 May 2019. Vysakh Nair was appointed as Additional Director on 09 May 2019. Jyothilekshmi Gopalakrishnan ceased to be Director on 29 Mar 2018. Elron Power Systems has 4 board changes on record in total.
Elron Power Systems can be reached through the website elronpower.com. Its registered office is in Ernakulam, Kerala, India.
The registered office of Elron Power Systems is at 12164 SREEVARAM NANDIKULANGARA MANNAM P O, Ernakulam, Kerala, India – 683520.


