- Category
- Small (2023-24)
- Udyam number
- UDYAM-UP-28-0016920

Associated brands: Enkay Solar Power
CIN: U74900DL2015PTC288024New Delhi, Delhi, India
About Enkay Solar Power and Infrastructure Private Limited
Data last updated:
Enkay Solar Power and Infrastructure Private Limited is a private limited company based in New Delhi, Delhi, India. It operates in the power equipment manufacturers segment of the power sector. It was incorporated on 01 December 2015 and has been in existence for over 11 years.
The company is registered with the Registrar of Companies (ROC), Delhi, under CIN U74900DL2015PTC288024. It holds 2 GST registrations, of which 1 is active, including GSTIN 09AAECE1155H1ZS (Uttar Pradesh). The company has an authorised share capital of ₹1.5 Cr and a paid-up capital of ₹1.5 Cr. It has 3 current directors, including Nand Kishor Aggarwal and Poonam Aggarwal.
As per the financials filed for FY 2025, the company reported a revenue of ₹1.27 Cr, a decline of 83% compared to the previous year. It closed the year with a net loss. The company has about 1 employee on its provident fund (EPFO) records.
Company details
- MCA compliance: Active Compliant
- Private Limited Company
- Registration number 288024
- Incorporated 01 December 2015
- Authorised capital ₹1.5 Cr
- Turnover up to ₹10 crore
- Revenue ₹1.27 Cr in FY 2025
- 1 employees, as per EPFO records
- Company limited by shares
- Non-government company
- Class: Private
- Business activity, as per the annual return of FY 2024: Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment
Contact details
Enkay Solar Power and Infrastructure Private Limited's registered office is in New Delhi, Delhi. Its website is enkaysolarpower.com.
- Email
- Telephone
- Website
- Registered AddressF. NO. – 14 – A GH – 2 PASCHIM VIHAR, New Delhi, Delhi, India – 110063
- City: New Delhi
- State: Delhi
- PIN Code: 110063
- Financial statements and ratios, year by year
- Directors, KMP and signatories
- Shareholding and group structure
- Charges, legal cases and credit ratings
Recognitions & Rankings of Enkay Solar Power and Infrastructure
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Key highlights
- Revenue fell 83% in the latest year (FY 2025)
- Reported a net loss in the latest year (FY 2025)
- Employee count fell 91.7% as per EPFO records
- Company status is active and it is marked ACTIVE compliant by the MCA
- In existence for over 11 years
- Has 2 open charges on record
- 3 current directors
- Paid-up capital of ₹1.5 Cr
Brands
Enkay Solar Power and Infrastructure operates one associated brand: Enkay Solar Power. Each brand links to its own profile.
| Brand | Description | Website |
|---|---|---|
| Specializes in developing solar power projects for sustainable energy solutions. | enkaysolarpower.com |
- Sector, stage and staff size of each brand
- Monthly website visits
- Funding rounds, valuation and investors
- Key people of each brand
Business activity
The main business activity of Enkay Solar Power and Infrastructure is manufacturing. In detail, this covers electrical equipment, general purpose and special purpose machinery & equipment, transport equipment.
| Main activity group code | Main activity | Business activity code | Business activity | Share of turnover |
|---|---|---|---|---|
| C | Manufacturing | C10 | Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Enkay Solar Power and Infrastructure Private Limited
FY 2025 filings availableEnkay Solar Power and Infrastructure Private Limited reported revenue of ₹1.27 Cr (down 83% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR)
Revenue has declined at a compounded annual rate (CAGR) of 40% over five years, including a 83% fall in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Summary
The latest five years are shown here. The company report carries every year filed since FY 2015-16.
| Summary | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Revenue | 1.27 Cr | ||||
| EBITDA | |||||
| EBITDA Margin | |||||
| Profit After Tax | |||||
| PAT Margin | |||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since FY 2015-16, up to FY 2024-25. The latest four years are previewed here. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | ||||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Liquidity ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since incorporation
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Enkay Solar Power and Infrastructure Private Limited
Enkay Solar Power and Infrastructure has 3 directors on record.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Nand Kishor Aggarwal | Director | 01 Dec 2015 | 10 yrs 11 mos | Current |
| Poonam Aggarwal | Director | 01 Dec 2015 | 10 yrs 11 mos | Current |
| Manish Aggarwal | Director | 13 Oct 2020 | 6 yrs 1 mo | Current |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Enkay Solar Power and Infrastructure Private Limited is compared with the 10 companies closest to it by revenue in the Power industry (Power Equipment Manufacturers, Solar Power), with the same principal business activity (electrical equipment, general purpose and special purpose machinery & equipment, transport equipment), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Swaraj Solar Private Limited | ₹1.28 Cr FY 2019 | -28.0% | Rajkot, Gujarat, India | |||
| Datar Power Management Private Limited | ₹1.28 Cr FY 2024 | -44.0% | Nashik, Maharashtra, India | |||
| Al Tehene Enterprises Private Limited | ₹1.27 Cr FY 2024 | -41.0% | Coimbatore, Tamil Nadu, India | |||
| Enkay Solar Power and Infrastructure Private Limitedthis company | ₹1.27 Cr FY 2025 | -83.0% | 1 | New Delhi, Delhi, India | ||
| Topo Technology (India) Private Limited | ₹1.27 Cr FY 2024 | -46.0% | Palakkad, Kerala, India | |||
| Moxie Devices Private Limited | ₹1.26 Cr FY 2024 | 18.0% | New Delhi, Delhi, India | |||
| Amt Powder Tech Private Limited | ₹1.25 Cr FY 2023 | -30.0% | Faridabad, Haryana, India | |||
| Sharp Electronics Private Limited | ₹1.25 Cr FY 2025 | -15.0% | Chennai, Tamil Nadu, India | |||
| Biecco Lawrie Limited | ₹1.25 Cr FY 2022 | -91.0% | Kolkata, West Bengal, India | |||
| P S Electricals Private Limited | ₹1.25 Cr FY 2025 | -12.0% | Chennai, Tamil Nadu, India | |||
| Faradigm Ultracapacitors Private Limited | ₹1.24 Cr FY 2025 | 76.0% | Bhopal, Madhya Pradesh, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Auditor
The statutory auditor of Enkay Solar Power and Infrastructure Private Limited is Vrsk And Associates (firm registration number 086499), as per its latest filing for the financial year 2022.
- The statutory auditor of every financial year filed since incorporation
- Audit firm, signing partner, membership number and firm registration number
- Whether each year's audit report was qualified, with the auditors' remarks
- Whether CARO applied, and the CARO remarks
- Auditor resignations, where one was filed
Charges & borrowings
Enkay Solar Power and Infrastructure Private Limited has 4 charge records registered with the MCA, created between 2016 and 2022: 2 open and 2 satisfied.
Open charges by lender
Open and latest charges
| Created on | Charge ID | Lender | Amount | Status |
|---|---|---|---|---|
| 27 Apr 2022 | 100593915 | HDFC Bank Limited | ₹3.3 Cr | Open |
| 07 Feb 2022 | 100562196 | HDFC Bank Limited | ₹3 Cr | Open |
| 10 Aug 2020 | 100376051 | Bank of India | ₹36.7 Lakh | Satisfied |
| 11 Jul 2016 | 100039874 | Bank of India | ₹3 Cr | Satisfied |
- Every charge record
- Creation, last modification and satisfaction date of each charge
- Open and satisfied amount with every lender
- Each lender's share of the open amount
Employees & EPFO
Enkay Solar Power and Infrastructure Private Limited has a workforce of 1 employees on its EPFO records as of Mar 2024, across 1 active EPFO establishment.
Headcount by financial year
| Financial year | Employees (EPFO) |
|---|---|
| FY 2023-24 | 1 |
| FY 2022-23 | |
| FY 2021-22 | |
| FY 2020-21 | |
| FY 2019-20 | |
| FY 2018-19 |
The latest six years are shown here. The company report carries the headcount for all 7 years on record, back to FY 2017-18.
- Head count at every financial year-end
- Employees on provident fund rolls, month by month
- PF amount remitted each month, with late payments marked
- Each establishment with its location, status and head count
GST
Enkay Solar Power and Infrastructure has 2 GST registrations: 1 active and 1 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 09AAECE1155H1ZS | Uttar Pradesh | Active | 01 Jul 2017 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Enkay Solar Power and Infrastructure Private Limited has 3 board changes on record since 2015: 3 appointments. The latest: Manish Aggarwal was appointed as Director on 13 Oct 2020.
| Date | Type | Event |
|---|---|---|
| 1 year 1 month ago | AGM | Enkay Solar Power And Infrastructure Private Limited last Annual general meeting of members was held on 30 Sep 2025 as per latest MCA records. |
| 1 year 7 months ago | Filing | Enkay Solar Power And Infrastructure Private Limited has filed its annual Financial statements for the year ended 31 Mar 2025 with ROC Delhi. |
| 4 years ago | Charges | A charge registered on 10 Aug 2020 via Charge ID 100376051 with Bank Of India was fully satisfied on 10 Oct 2022. |
| 4 years ago | Charges | A charge registered on 11 Jul 2016 via Charge ID 100039874 with Bank Of India was fully satisfied on 10 Oct 2022. |
| 4 years ago | Charges | A charge with HDFC Bank Limited amounted to Rs. 3.30 Cr with Charge ID 100593915 was registered on 27 Apr 2022. |
| 4 years ago | Charges | A charge with HDFC Bank Limited amounted to Rs. 3.00 Cr with Charge ID 100562196 was registered on 07 Feb 2022. |
| 6 years ago | Appointed | Manish Aggarwal was appointed as Director. |
| 6 years ago | Charges | A charge with Bank Of India amounted to Rs. 0.37 Cr with Charge ID 100376051 was registered on 10 Aug 2020. |
Also available in the company report of Enkay Solar Power and Infrastructure Private Limited
Legal cases
- Court and tribunal cases, with case number, court and year
- Parties to each case and its status
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Enkay Solar Power and Infrastructure is an active private limited company based in New Delhi, Delhi, India. The company works in power equipment manufacturers, within the power industry. It was incorporated on 01 December 2015 (11+ years old) and is registered under CIN U74900DL2015PTC288024.
Enkay Solar Power and Infrastructure has 3 current directors:
- Nand Kishor Aggarwal - Director
- Poonam Aggarwal - Director
- Manish Aggarwal - Director
The latest financial statements of Enkay Solar Power and Infrastructure on record with the MCA are for the year ended 31 March 2025. Its last annual general meeting was held on 30 September 2025. Year-wise statements from FY 2016 are in the company report.
The GSTIN of Enkay Solar Power and Infrastructure is 09AAECE1155H1ZS, registered in Uttar Pradesh. The company has 2 GST registrations in all, of which 1 is active and 1 is cancelled or inactive.
The CIN (Corporate Identification Number) of Enkay Solar Power and Infrastructure is U74900DL2015PTC288024. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Enkay Solar Power and Infrastructure was incorporated on 01 December 2015, making it 11+ years old. It is registered with the Registrar of Companies, Delhi.
The peers of Enkay Solar Power and Infrastructure by revenue are Swaraj Solar Private Limited, Datar Power Management Private Limited, Al Tehene Enterprises Private Limited, Topo Technology (India) Private Limited, Moxie Devices Private Limited and 5 more, all in the Power industry (Power Equipment Manufacturers, Solar Power), with the same principal business activity (electrical equipment, general purpose and special purpose machinery & equipment, transport equipment).
Manish Aggarwal was appointed as Director on 13 Oct 2020.
Yes, Enkay Solar Power and Infrastructure is registered as a small enterprise under Udyam registration (number: UDYAM-UP-28-0016920).
Enkay Solar Power and Infrastructure can be reached through the website enkaysolarpower.com. Its registered office is in New Delhi, Delhi, India.
The registered office of Enkay Solar Power and Infrastructure is at F. NO. – 14 – A GH – 2 PASCHIM VIHAR, New Delhi, Delhi, India – 110063.

