Iav Engineering Projects Limited
About Iav Engineering Projects Limited
Data last updated: 10 January 2026
Iav Engineering Projects Limited is a public limited company based in Mumbai, Maharashtra, India, a subsidiary of Indian Oiltanking Limited. It specialises in general construction services, a part of the broader infrastructure and utilities sector. Incorporated on 07 May 2007, the company has been in operation for over 19 years.
Registered with ROC Mumbai under CIN U74200MH2007PTC170617.
Capital: an authorised share capital of ₹180 Cr and a paid-up capital of ₹138.94 Cr. Formerly known as Iot Engineering Projects Private Limited. It is led by directors including Santosh Kumar Dubey and Arpita Bishoyi.
Last AGM: 23 September 2025. Financial statements filed for year ended 31 March 2025. Office: Mumbai, Maharashtra.
As per the financials filed for FY 2025, the company reported a revenue of ₹2.41 Lakh, a growth of 83% compared to the previous year.
The company has a workforce of approximately 3 employees as per the latest available data. It operates as a subsidiary of Indian Oiltanking Limited.
As per MCA filings, the company has open charges of ₹7.98 Lakh and satisfied charges of ₹818.66 Cr on record.
The current compliance status is marked as compliant by the Registrar of Companies.
-
Email**************
-
Telephone**************
-
Website**************
-
Social Media**************
-
Registered Address103 1St Floor Spectra, Hiranandani Gardens Powai, Mumbai, Maharashtra, India – 400076
-
IndustryInfrastructure and Utilities, General Construction Services
- Historical Financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Litigation, compliance and MCA filings
- PDF report delivered after checkout
CIN History of Iav Engineering Projects Limited
Iav Engineering Projects Limited has one previous CIN (Corporate Identification Number): U74200MH2007PTC170617. The current CIN is U74200MH2007PLC170617, which is the unique identifier assigned by the Registrar of Companies.
| CIN | Status |
|---|---|
| U74200MH2007PLC170617 | Current |
| U74200MH2007PTC170617 | Previous |
Business Activity of Iav Engineering Projects Limited
Iav Engineering Projects Limited is engaged in the principal business activity of construction, with detailed activities including specialized construction activities.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | 43 | Specialized construction activities | ********* |
Board of Directors of Iav Engineering Projects Limited
Iav Engineering Projects Limited is currently managed by 6 directors, with 36 former directors having served the organization. The current Directors play a crucial role in shaping the company's strategic direction and governance.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Santosh Kumar Dubey | Managing Director | 30 Nov 2023 | 2 Years 7 Months | Current |
|
Arpita Bishoyi
Also directs:
Iav Utkarsh Limited, Iav Urja Services Limited, Kazakhstancaspishelf India Private Limited and 2 more
|
Director | 30 Mar 2023 | 3 Years 3 Months | Current |
|
Dayanand Sadashiv Nanaware
Also directs:
Iav Utkarsh Limited, Iav Urja Services Limited
|
Additional Director | 22 Jul 2025 | 0 Years 11 Months | Current |
| Bhupesh Datt Sharma | Director | 30 Mar 2023 | 3 Years 3 Months | Current |
Financials of Iav Engineering Projects Limited FY 2025 filings available
Iav Engineering Projects Limited reported revenue of ₹2.41 Lakh (up 83% YoY) for FY 2025. Profit growth despite declining revenue indicates effective cost management and margin discipline.
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Revenue | |||||
| Revenue from Operations | ***** | ***** | ***** | ***** | ***** |
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Other Income | ***** | ***** | ***** | ***** | ***** |
| Total Revenue | ***** | ***** | ***** | ***** | ***** |
| Expenses | |||||
| Total Expenses | ***** | ***** | ***** | ***** | ***** |
| Raw Material Cost | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory FG | ***** | ***** | ***** | ***** | ***** |
| Change in Inventory WIP | ***** | ***** | ***** | ***** | ***** |
| Purchase of Traded Goods | ***** | ***** | ***** | ***** | ***** |
| Employee Cost | ***** | ***** | ***** | ***** | ***** |
| Managerial Remuneration | ***** | ***** | ***** | ***** | ***** |
| Audit Fees | ***** | ***** | ***** | ***** | ***** |
| Insurance | ***** | ***** | ***** | ***** | ***** |
| Power & Fuel | ***** | ***** | ***** | ***** | ***** |
| Interest | ***** | ***** | ***** | ***** | ***** |
| Depreciation | ***** | ***** | ***** | ***** | ***** |
| Other Expenses | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| EBITDA (Operating Profit) | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| Exceptional Items | ***** | ***** | ***** | ***** | ***** |
| Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Exceptional & Extraordinary Items | ***** | ***** | ***** | ***** | ***** |
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Tax & Net Profit | |||||
| Tax Expense | ***** | ***** | ***** | ***** | ***** |
| Current Tax | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax | ***** | ***** | ***** | ***** | ***** |
| Profit from Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Tax on Discontinued Operations | ***** | ***** | ***** | ***** | ***** |
| Profit | ***** | ***** | ***** | ***** | ***** |
| Net Margin % | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Shareholders' Funds | |||||
| Total Shareholders' Funds | ***** | ***** | ***** | ***** | ***** |
| Equity Capital | ***** | ***** | ***** | ***** | ***** |
| Reserves & Surplus | ***** | ***** | ***** | ***** | ***** |
| Money Against Warrants | ***** | ***** | ***** | ***** | ***** |
| Other Equity | ***** | ***** | ***** | ***** | ***** |
| Non-Current Liabilities | |||||
| Total Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Liabilities | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Long-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Current Liabilities | |||||
| Total Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Borrowings | ***** | ***** | ***** | ***** | ***** |
| Trade Payables | ***** | ***** | ***** | ***** | ***** |
| Other Current Liabilities | ***** | ***** | ***** | ***** | ***** |
| Short-Term Provisions | ***** | ***** | ***** | ***** | ***** |
| Total Equity & Liabilities | ***** | ***** | ***** | ***** | ***** |
| Non-Current Assets | |||||
| Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Tangible Assets | ***** | ***** | ***** | ***** | ***** |
| Intangible Assets | ***** | ***** | ***** | ***** | ***** |
| Capital WIP | ***** | ***** | ***** | ***** | ***** |
| Intangibles Under Dev | ***** | ***** | ***** | ***** | ***** |
| Investments | ***** | ***** | ***** | ***** | ***** |
| Deferred Tax Assets | ***** | ***** | ***** | ***** | ***** |
| LT Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Non-Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Assets | |||||
| Current Assets | ***** | ***** | ***** | ***** | ***** |
| Current Investments | ***** | ***** | ***** | ***** | ***** |
| Inventories | ***** | ***** | ***** | ***** | ***** |
| Trade Receivables | ***** | ***** | ***** | ***** | ***** |
| Cash & Bank Balance | ***** | ***** | ***** | ***** | ***** |
| ST Loans & Advances | ***** | ***** | ***** | ***** | ***** |
| Other Current Assets | ***** | ***** | ***** | ***** | ***** |
| Total Assets | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Cash from Operating Activities (CFO) | |||||
| Profit Before Tax | ***** | ***** | ***** | ***** | ***** |
| Non-Cash Adjustments | ***** | ***** | ***** | ***** | ***** |
| + Interest Expense | ***** | ***** | ***** | ***** | ***** |
| + Depreciation | ***** | ***** | ***** | ***** | ***** |
| +/- Unrealized Forex | ***** | ***** | ***** | ***** | ***** |
| - Dividend Income | ***** | ***** | ***** | ***** | ***** |
| - Interest Income | ***** | ***** | ***** | ***** | ***** |
| +/- Other Non-Cash Items | ***** | ***** | ***** | ***** | ***** |
| Changes in Working Capital | ***** | ***** | ***** | ***** | ***** |
| +/- Inventory | ***** | ***** | ***** | ***** | ***** |
| +/- Debtors | ***** | ***** | ***** | ***** | ***** |
| +/- Creditors | ***** | ***** | ***** | ***** | ***** |
| Reconciliation Adjustments | ***** | ***** | ***** | ***** | ***** |
| Cash Generated from Operations | ***** | ***** | ***** | ***** | ***** |
| Income Taxes Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFO (Cash from Operations) | ***** | ***** | ***** | ***** | ***** |
| Cash from Investing Activities (CFI) | |||||
| Acquisitions & Disposals | ***** | ***** | ***** | ***** | ***** |
| Disposal of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Acquisition of Subsidiaries | ***** | ***** | ***** | ***** | ***** |
| Capex | ***** | ***** | ***** | ***** | ***** |
| Purchase of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Sale of Fixed Assets | ***** | ***** | ***** | ***** | ***** |
| Other Investing Cash Flows | ***** | ***** | ***** | ***** | ***** |
| Net CFI (Cash from Investing) | ***** | ***** | ***** | ***** | ***** |
| Cash from Financing Activities (CFF) | |||||
| Equity Issuance | ***** | ***** | ***** | ***** | ***** |
| Debt Raised | ***** | ***** | ***** | ***** | ***** |
| Debt Repaid | ***** | ***** | ***** | ***** | ***** |
| Dividends Paid | ***** | ***** | ***** | ***** | ***** |
| Interest Paid | ***** | ***** | ***** | ***** | ***** |
| Net CFF (Cash from Financing) | ***** | ***** | ***** | ***** | ***** |
| Net Cash Position | |||||
| Net Change in Cash (Pre-Forex) | ***** | ***** | ***** | ***** | ***** |
| Closing Cash & Equivalents | ***** | ***** | ***** | ***** | ***** |
| Metrics | ***** | ***** | ***** | ***** | ***** |
|---|---|---|---|---|---|
| Liquidity | |||||
| Current Ratio | ***** | ***** | ***** | ***** | ***** |
| Quick Ratio | ***** | ***** | ***** | ***** | ***** |
| Cash Ratio | ***** | ***** | ***** | ***** | ***** |
| Efficiency | |||||
| Inventory Days | ***** | ***** | ***** | ***** | ***** |
| Debtor Days | ***** | ***** | ***** | ***** | ***** |
| Creditor Days | ***** | ***** | ***** | ***** | ***** |
| Cash Conversion Cycle | ***** | ***** | ***** | ***** | ***** |
| Asset Turnover | ***** | ***** | ***** | ***** | ***** |
| Profitability | |||||
| Net Profit Margin % | ***** | ***** | ***** | ***** | ***** |
| Operating Margin % | ***** | ***** | ***** | ***** | ***** |
| ROE % | ***** | ***** | ***** | ***** | ***** |
| ROCE % | ***** | ***** | ***** | ***** | ***** |
| Net Worth Margin % | ***** | ***** | ***** | ***** | ***** |
| Growth | |||||
| Revenue Growth % | ***** | ***** | ***** | ***** | ***** |
| Leverage | |||||
| Equity Multiplier | ***** | ***** | ***** | ***** | ***** |
| Debt / EBITDA | ***** | ***** | ***** | ***** | ***** |
| Solvency | |||||
| D/E Ratio | ***** | ***** | ***** | ***** | ***** |
| ICR | ***** | ***** | ***** | ***** | ***** |
Consolidated Statements
Income Statement, Balance Sheet, Cash Flow & Ratios available in the full report.
Charges & Borrowings of Iav Engineering Projects Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 10 Aug 2007 | Hdfc Bank Limited | ₹7.98 Lakh | Open |
| 19 Dec 2014 | Idbi Bank Limited | ₹65 Cr | Satisfied |
| 19 Dec 2014 | Idbi Bank Limited | ₹308.66 Cr | Satisfied |
| 04 Oct 2011 | Idbi Bank Limited | ₹24 Cr | Satisfied |
| 26 Mar 2010 | Idbi Bank Limited | ₹10 Cr | Satisfied |
Total charge records: 7 View all charges
Employees and EPFO Compliance at Iav Engineering Projects Limited
View historical data on people associated with Iav Engineering Projects Limited, including employment history and EPFO contributions.
Employee Count & EPFO Data of Iav Engineering Projects Limited
Access employee headcount trends, monthly PF payment records, EPFO establishment details, and compliance data.
GST Compliance of Iav Engineering Projects Limited
GSTIN & GST Filing Data of Iav Engineering Projects Limited
Access GSTIN registrations, state-wise filing compliance, HSN/SAC codes, and detailed goods & services data.
Credit Ratings, Litigation & Regulatory Alerts for Iav Engineering Projects Limited
Credit Ratings, Legal Cases & Regulatory Alerts of Iav Engineering Projects Limited
Access complete credit rating history, litigation records, regulatory alerts, and compliance data.
MSME Payment Delays by Iav Engineering Projects Limited
MSME Payment Delays by Iav Engineering Projects Limited
Track payments outstanding to micro and small enterprise vendors, as disclosed in half-yearly MSME-1 returns filed with the MCA.
Subsidiaries & Group Companies of Iav Engineering Projects Limited
Subsidiaries & Group Companies of Iav Engineering Projects Limited
See the full corporate group - holding company, subsidiaries, associates and joint ventures of Iav Engineering Projects Limited with ownership details.
MCA Filings & Documents of Iav Engineering Projects Limited
MCA Filings & Documents of Iav Engineering Projects Limited
Download official documents filed with the Ministry of Corporate Affairs - from incorporation papers to the latest annual filings.
Recent Activity on Iav Engineering Projects Limited
Frequently Asked Questions about Iav Engineering Projects Limited
Iav Engineering Projects Limited is an active public limited company in the infrastructure and utilities sector based in Mumbai, Maharashtra, India. It was incorporated on 07 May 2007 (19+ years old) and is registered under CIN U74200MH2007PLC170617. The company has 3 employees.
Iav Engineering Projects Limited reported revenue of ₹2.41 Lakh for FY 2025 (up 83.00% YoY).
The current directors of Iav Engineering Projects Limited are:
- Santosh Kumar Dubey
- Arpita Bishoyi
- Dayanand Sadashiv Nanaware
- Bhupesh Datt Sharma
- Vaishali Deepak Rane
- Sneha Sunil Ghadigaonkar
The primary industry of Iav Engineering Projects Limited is infrastructure and utilities. The company specifically operates in general construction services. The company is currently active in this sector.
Iav Engineering Projects Limited can be reached at the registered office: 103 1St Floor Spectra, Hiranandani Gardens Powai, Mumbai, Maharashtra, India – 400076.
The authorised capital is ₹180 Cr, and the paid-up capital is ₹138.94 Cr.