
KDM Power & Infrastructure Private Limited
About KDM Power & Infrastructure Private Limited
Data last updated:
KDM Power & Infrastructure Private Limited is a private limited company based in Sambalpur, Odisha, India. It operates in the power epc segment of the energy and power sector. It was incorporated on 27 November 2012 and has been in existence for over 14 years.
The company is registered with the Registrar of Companies (ROC), Cuttack, under CIN U40109OR2012PTC016259. Its GSTIN is 21AAECK9867G1ZB (Odisha).
The company has an authorised share capital of ₹10 Lakh and a paid-up capital of ₹5 Lakh. It is led by directors Manish Singh Kumar (Managing Director) and Dadan Kumar Singh.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at At – Goudapada Po/Ps – Rengali, Sambalpur, Odisha, India – 768212.
As per the financials filed for FY 2025, the company reported a revenue of ₹2.55 Cr, a decline of 67% compared to the previous year. For the same year it recorded a net profit of ₹17.83 Lakh (net margin 7%) and EBITDA of ₹78.87 Lakh (EBITDA margin 31%). Revenue has grown at a compounded annual rate (CAGR) of 45% over three years and 17% over five years.
The company has about 12 employees on its provident fund (EPFO) records.
As per MCA filings, the company has open charges of ₹5.1 Cr and satisfied charges of ₹10 Lakh on record.
The current compliance status is marked as compliant by the Registrar of Companies.
- EmailLocked
- TelephoneLocked
- WebsiteLocked
- Social MediaLocked
- Registered AddressAt – Goudapada Po/Ps – Rengali, Sambalpur, Odisha, India – 768212
- IndustryEnergy and Power, Power EPC, BoP & BTG Services
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of KDM Power & Infrastructure Private Limited
The main business activity of KDM Power & Infrastructure is construction. In detail, this covers demolition & site preparation, electrical, plumbing & other specialized construction activities.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | F3 | Demolition & site preparation, Electrical, plumbing & other Specialized construction Activities | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of KDM Power & Infrastructure Private Limited FY 2025 filings available
KDM Power & Infrastructure Private Limited reported revenue of ₹2.55 Cr (down 67% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR) of KDM Power & Infrastructure Private Limited
Revenue fell 67% in the latest year, but over five years it has grown at a compounded annual rate (CAGR) of 17%. EBITDA rose 32% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of KDM Power & Infrastructure Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹78.87 Lakh | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | ₹17.83 Lakh | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of KDM Power & Infrastructure Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 31% | •••• | •••• | •••• | •••• |
| Net Profit Margin | 7% | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of KDM Power & Infrastructure are in the company report.
Financial statements from 2015
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure Private Limited is compared with the companies closest to it by revenue in the Engineering industry (Maintenance Services). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Peniel Electrical Engineering Private Limited | ₹2.59 Cr (FY 2025) | •••• | •••• | 3.0% | •••• | Navi Mumbai, Maharashtra, India |
| Q M Engineers (India) Private Limited | ₹2.59 Cr (FY 2024) | •••• | •••• | 123.0% | •••• | Nagpur, Maharashtra, India |
| Brandweer Engineering Private Limited | ₹2.56 Cr (FY 2025) | •••• | •••• | 43.0% | •••• | New Delhi, Delhi, India |
| Chrystec Machine Tools Private Limited | ₹2.55 Cr (FY 2025) | •••• | •••• | -10.0% | •••• | Bangalore, Karnataka, India |
| Recreet Maintenance Solutions Private Limited | ₹2.55 Cr (FY 2020) | •••• | •••• | 3.0% | •••• | Delhi, India |
| KDM Power & Infrastructure Private Limited this company | ₹2.55 Cr (FY 2025) | •••• | •••• | -67.0% | •••• | Sambalpur, Odisha, India |
| Ekranfix Private Limited | ₹2.55 Cr (FY 2025) | •••• | •••• | 376.0% | •••• | Hyderabad, Telangana, India |
| Prime Infradevelopers Maintenance Services Private Limited | ₹2.54 Cr (FY 2025) | •••• | •••• | 5.0% | •••• | Gurugram, Haryana, India |
| Inmar Engineering Services Private Limited | ₹2.53 Cr (FY 2025) | •••• | •••• | 8.0% | •••• | Mumbai, Maharashtra, India |
| Spire Innovative Engineering Private Limited | ₹2.53 Cr (FY 2024) | •••• | •••• | 395.0% | •••• | Gurugram, Haryana, India |
| Star Aircon Engineers Private Limited | ₹2.51 Cr (FY 2025) | •••• | •••• | -10.0% | •••• | Navi Mumbai, Maharashtra, India |
Peers are the five companies nearest above and the five nearest below KDM Power & Infrastructure by revenue in the Engineering industry (Maintenance Services), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Auditor Details of KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure Private Limited is audited by BIJAY DHANIRAM & CO for the financial year 2019.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| BIJAY DHANIRAM & CO | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Board of Directors of KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure has 2 current directors and 2 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Manish Singh Kumar Also directs: Oriherbal Wine & Beverage Private Limited | Managing Director | 27 Nov 2012 | 13 Years 10 Months | Current |
| Dadan Kumar Singh | Director | 27 Nov 2012 | 13 Years 10 Months | Current |
Ownership and Shareholding of KDM Power & Infrastructure Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of KDM Power & Infrastructure Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 10 Nov 2025 | Others | ₹1.01 Cr | Open |
| 14 Nov 2024 | State Bank of India | ₹40 Lakh | Open |
| 17 May 2024 | Others | ₹1.02 Cr | Open |
| 19 Jan 2024 | Others | ₹97 Lakh | Open |
| 08 Sep 2023 | Others | ₹48.79 Lakh | Open |
Total charge records: 10 View all charges
Employees and EPFO Compliance at KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure Private Limited has a workforce of 12 employees as of Mar 22, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure Private Limited has 4 board changes on record since 2012: 2 appointments and 2 cessations. The latest: Giridhari Naik ceased to be Additional Director on 31 Dec 2020.
6 earlier events are listed in the company report.
Credit Ratings, Litigation & Regulatory Alerts for KDM Power & Infrastructure Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by KDM Power & Infrastructure Private Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of KDM Power & Infrastructure Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure has 1 GST registration: 1 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 21AAECK9867G1ZB | Odisha | Active | 01 Jul 2017 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of KDM Power & Infrastructure Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about KDM Power & Infrastructure Private Limited
KDM Power & Infrastructure is an active private limited company based in Sambalpur, Odisha, India. The company works in power epc, within the energy and power industry. It was incorporated on 27 November 2012 (14+ years old) and is registered under CIN U40109OR2012PTC016259.
KDM Power & Infrastructure reported revenue of ₹2.55 Cr for FY 2025 (down 67% YoY).
KDM Power & Infrastructure has 2 current directors:
- Manish Singh Kumar - Managing Director
- Dadan Kumar Singh - Director
KDM Power & Infrastructure reported a net profit of ₹17.83 Lakh (net margin 7%) and EBITDA of ₹78.87 Lakh (EBITDA margin 31%) for FY 2025, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of KDM Power & Infrastructure is 45% over three years and 17% over five years. In the latest year (FY 2025) revenue fell 67%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of KDM Power & Infrastructure is 21AAECK9867G1ZB, registered in Odisha.
The CIN (Corporate Identification Number) of KDM Power & Infrastructure is U40109OR2012PTC016259. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
KDM Power & Infrastructure was incorporated on 27 November 2012, making it 14+ years old. It is registered with the Registrar of Companies, Cuttack.
The peers of KDM Power & Infrastructure by revenue are Peniel Electrical Engineering Private Limited, Q M Engineers (India) Private Limited, Brandweer Engineering Private Limited, Chrystec Machine Tools Private Limited, Recreet Maintenance Solutions Private Limited and 5 more, all in the Engineering industry (Maintenance Services).
Giridhari Naik ceased to be Additional Director on 31 Dec 2020. Ajay Kumar Singh ceased to be Director on 10 Aug 2015. Dadan Kumar Singh was appointed as Director on 27 Nov 2012. KDM Power & Infrastructure has 4 board changes on record in total.
The registered office of KDM Power & Infrastructure is at At – Goudapada PoPs – Rengali, Sambalpur, Odisha, India – 768212.