- Category
- Medium (2024-25)
- Udyam number
- UDYAM-MH-18-0002305

About Konstelec Engineers Limited
Data last updated:
Konstelec Engineers Limited is a public limited company based in Mumbai, Maharashtra, India. It operates in the general purpose and special purpose machinery and equipment segment of the electrical equipment sector. It was incorporated on 05 December 1995 and has been in existence for over 31 years.
The company is registered with the Registrar of Companies (ROC), Mumbai, under CIN L45203MH1995PLC095011. Its GSTIN is 27AAACK2747D1ZS (Maharashtra). The company holds 25 GST registrations, of which 20 are active. Its shares are listed on NSE: KONSTELEC.
The company has an authorised share capital of ₹20 Cr and a paid-up capital of ₹15.1 Cr. It is led by directors including Amish Biharilal Shah (Managing Director) and Biharilal Ravilal Shah (Whole-Time Director).
Its last annual general meeting (AGM) was held on 26 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at Mumbai, Maharashtra.
As per the latest consolidated financials for FY 2025-26, the company reported a revenue of ₹210.39 Cr, a growth of 8.6% compared to the previous year. For the same year it recorded a net profit of ₹7.29 Cr (net margin 3.5%) and EBITDA of ₹20 Cr (EBITDA margin 9.5%). The net worth stands at ₹105.97 Cr (up 7.4% YoY). Total assets are valued at ₹196.3 Cr (up 17.1% YoY).
The company has about 1,894 employees on its provident fund (EPFO) records.
The company is associated with 1 brand: Konstelec. As per MCA filings, the company has open charges of ₹208.24 Cr and satisfied charges of ₹48.99 Cr on record. Court records list 1 case involving the company, including 1 filed by the company; 1 case is pending. The company has 3 deals on record (2 secondary share transfers, 1 ipo); the latest was in January 2024. Its 10 peer companies in the Engineering industry (Engineering Procurement and Construction) are compared by revenue, 5 larger and 5 smaller; the largest is Dmi Draexlmaier Manufacturing India Private Limited with revenue of ₹202.65 Cr. The company has 12 MSME Form 1 returns on record between 2019 and 2024, listing 473 overdue payments to 45 micro and small suppliers.
Konstelec Engineers Limited is registered as a medium enterprise under the Udyam registration framework (Reg. No. UDYAM-MH-18-0002305). The current compliance status is marked as compliant by the Registrar of Companies. For more details, the company can be reached via its website konstelec.com.
CIN History of Konstelec Engineers Limited
Konstelec Engineers has 2 previous CINs, indicating changes in the company's corporate structure or registration details. The current CIN is L45203MH1995PLC095011, which is the unique identifier assigned by the Registrar of Companies.
| CIN | Status |
|---|---|
| L45203MH1995PLC095011 | Current |
| U45203MH1995PLC095011 | Previous |
| U45203MH1995PTC095011 | Previous |
Recognitions & Rankings of Konstelec Engineers
- EmailLocked
- TelephoneLocked
- Website
- Social Media
- Registered AddressGr 001 – 007 A Wing Skyline Epitome, Kirol Road Near Jolly Gymkhana Vidyavihar (West), Mumbai, Maharashtra, India – 400086
- IndustryElectrical, General Purpose And Special Purpose Machinery & Equipment, Electrical Equipment, Transport Equipment
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Associated Brands with Konstelec Engineers Limited
Konstelec Engineers operates one associated brand: Konstelec. Each brand links to its own profile.
| Brand | Description | Website |
|---|---|---|
| Engineering, procurement, construction, and commissioning services are provided. | konstelec.com |
Business Activity of Konstelec Engineers Limited
The main business activity of Konstelec Engineers is manufacturing. In detail, this covers electrical equipment, general purpose and special purpose machinery & equipment, transport equipment.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| C | Manufacturing | C10 | Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Konstelec Engineers Limited FY 2025-26 filings available
Konstelec Engineers Limited reported revenue of ₹210.39 Cr (up 8.6% YoY) for FY 2025-26.
Financial Highlights
FY 2025-26 · ConsolidatedRevenue vs Net Profit ₹ Cr
Margin trends
Financial summary ₹ Cr
| Metrics | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Income statement | |||||||
| Revenue | 210 | 194 | 215 | 153 | 107 | 105 | 114 |
| Revenue growth | +8.6% | -10.0% | +40.4% | +43.3% | +2.1% | -7.7% | - |
| EBITDA | 20.00 | 13.58 | 18.49 | 14.28 | 6.57 | 6.00 | 10.77 |
| EBITDA margin | +9.5% | +7.0% | +8.6% | +9.3% | +6.1% | +5.7% | +9.5% |
| Profit before tax | 10.08 | 6.70 | 12.16 | 10.30 | 4.80 | 2.79 | 7.78 |
| Net profit | 7.29 | 4.44 | 8.55 | 7.08 | 2.82 | 1.90 | 5.41 |
| Net profit margin | +3.5% | +2.3% | +4.0% | +4.6% | +2.6% | +1.8% | +4.8% |
| EPS (₹) | 4.83 | 3.14 | 5.91 | 71.84 | 35.23 | 19.03 | 54.68 |
| Balance sheet | |||||||
| Total assets | 196 | 168 | 139 | 96.97 | 80.74 | 76.20 | 66.68 |
| Net worth | 106 | 98.68 | 94.02 | 61.90 | 54.24 | 50.71 | 49.20 |
| Total debt | 90.34 | 68.98 | 45.05 | 35.07 | 26.51 | 25.48 | 17.48 |
| Cash & bank | 26.38 | 21.21 | 24.44 | 9.70 | 9.88 | 11.51 | 8.25 |
| Net working capital | 176 | 149 | 123 | 83.43 | 70.01 | 65.77 | 51.39 |
| Cash flow | |||||||
| Cash from operations | (10.28) | (14.82) | (20.69) | (4.57) | 0.43 | (3.34) | (3.79) |
| Cash from investing | (3.77) | (3.97) | 0.04 | (0.62) | (0.12) | (2.23) | (0.90) |
| Cash from financing | 13.38 | 18.11 | 27.74 | 4.98 | (1.16) | 5.31 | 5.32 |
| Metrics | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Income statement | |||||||
| Revenue | 210 | 194 | 215 | 153 | 106 | 101 | 114 |
| Revenue growth | +8.6% | -10.0% | +40.4% | +44.8% | +5.1% | -11.3% | - |
| EBITDA | 20.21 | 13.11 | 18.81 | 14.28 | 7.24 | 6.77 | 10.78 |
| EBITDA margin | +9.6% | +6.8% | +8.7% | +9.3% | +6.8% | +6.7% | +9.5% |
| Profit before tax | 10.29 | 6.22 | 12.48 | 10.30 | 5.04 | 3.50 | 7.79 |
| Net profit | 7.51 | 4.44 | 8.87 | 7.08 | 3.05 | 2.45 | 5.42 |
| Net profit margin | +3.6% | +2.3% | +4.1% | +4.6% | +2.9% | +2.4% | +4.8% |
| EPS (₹) | 4.96 | 2.83 | 6.12 | 71.85 | 37.66 | 24.30 | 54.75 |
| Balance sheet | |||||||
| Total assets | 196 | 168 | 140 | 97.27 | 81.90 | 77.93 | 67.16 |
| Net worth | 106 | 98.66 | 94.48 | 62.04 | 55.24 | 51.66 | 49.34 |
| Total debt | 90.21 | 68.98 | 45.10 | 35.22 | 26.66 | 26.27 | 17.81 |
| Cash & bank | 26.37 | 21.21 | 24.12 | 9.69 | 4.46 | 5.26 | 8.24 |
| Net working capital | 176 | 149 | 123 | 83.42 | 65.47 | 61.06 | 51.39 |
| Cash flow | |||||||
| Cash from operations | (10.18) | (14.40) | (26.90) | (4.57) | 0.43 | (3.34) | (3.78) |
| Cash from investing | (3.75) | (4.08) | 0.04 | (0.62) | (0.12) | (1,74,474) | (0.90) |
| Cash from financing | 13.26 | 18.11 | 27.63 | 4.98 | (1.16) | 5.30 | 5.31 |
Financial Statements
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Revenue | 210 | 194 | 215 | 153 | 107 | 105 | 114 |
| Revenue growth | +8.6% | -10.0% | +40.4% | +43.3% | +2.1% | -7.7% | - |
| Other income | 2.33 | 1.95 | 2.09 | 1.72 | 1.98 | 1.28 | 1.15 |
| Total expenses | 190 | 180 | 197 | 139 | 100 | 98.89 | 103 |
| Employee cost | 32.45 | 32.56 | 32.10 | 23.61 | 17.79 | 17.20 | 15.35 |
| EBITDA | 20.00 | 13.58 | 18.49 | 14.28 | 6.57 | 6.00 | 10.77 |
| EBITDA margin | +9.5% | +7.0% | +8.6% | +9.3% | +6.1% | +5.7% | +9.5% |
| Depreciation | 1.77 | 1.09 | 0.99 | 0.81 | 0.78 | 0.92 | 0.87 |
| Interest | 10.48 | 7.74 | 7.43 | 4.89 | 2.97 | 3.57 | 3.27 |
| Profit before tax | 10.08 | 6.70 | 12.16 | 10.30 | 4.80 | 2.79 | 7.78 |
| Tax | 2.80 | 1.93 | 3.24 | 3.12 | 1.29 | 0.89 | 2.31 |
| Net profit | 7.29 | 4.44 | 8.55 | 7.08 | 2.82 | 1.90 | 5.41 |
| Net profit margin | +3.5% | +2.3% | +4.0% | +4.6% | +2.6% | +1.8% | +4.8% |
| EPS (₹) | 4.83 | 3.14 | 5.91 | 71.84 | 35.23 | 19.03 | 54.68 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Equity & liabilities | |||||||
| Share capital | 15.10 | 15.10 | 15.10 | 1.00 | 1.00 | 1.00 | 1.00 |
| Reserves & surplus | 90.87 | 83.58 | 78.92 | 60.90 | 53.24 | 49.71 | 48.20 |
| Shareholders' funds (net worth) | 106 | 98.68 | 94.02 | 61.90 | 54.24 | 50.71 | 49.20 |
| Minority interest | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Secured loans | 80.58 | 68.27 | 44.82 | 33.92 | 25.93 | 25.01 | 17.21 |
| Unsecured loans | 9.76 | 0.71 | 0.23 | 1.15 | 0.58 | 0.47 | 0.27 |
| Total debt | 90.34 | 68.98 | 45.05 | 35.07 | 26.51 | 25.48 | 17.48 |
| Total liabilities | 196 | 168 | 139 | 96.97 | 80.74 | 76.20 | 66.68 |
| Assets | |||||||
| Gross block | 27.13 | 21.36 | 18.87 | 17.65 | 16.18 | 15.78 | 14.59 |
| Net block | 14.40 | 10.33 | 8.60 | 8.37 | 7.51 | 7.77 | 7.45 |
| Capital work in progress | 0.00 | 2.13 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Investments | 0.13 | 0.09 | 0.82 | 1.57 | 2.47 | 1.89 | 0.88 |
| Inventories | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 30.66 |
| Sundry debtors | 72.12 | 66.85 | 69.46 | 53.17 | 51.28 | 32.70 | 36.85 |
| Cash & bank balances | 26.38 | 21.21 | 24.44 | 9.70 | 9.88 | 11.51 | 8.25 |
| Loans & advances | 147 | 132 | 96.16 | 69.75 | 46.95 | 49.01 | 12.66 |
| Total current assets | 246 | 220 | 190 | 133 | 108 | 93.22 | 88.42 |
| Total current liabilities | 69.79 | 70.76 | 66.77 | 49.19 | 38.10 | 27.45 | 37.03 |
| Net working capital | 176 | 149 | 123 | 83.43 | 70.01 | 65.77 | 51.39 |
| Total assets | 196 | 168 | 139 | 96.97 | 80.74 | 76.20 | 66.68 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Opening cash | 0.82 | 1.50 | 0.42 | 0.63 | 1.48 | 1.75 | 1.12 |
| Net cash from operating activities | (10.28) | (14.82) | (20.69) | (4.57) | 0.43 | (3.34) | (3.79) |
| Net cash from investing activities | (3.77) | (3.97) | 0.04 | (0.62) | (0.12) | (2.23) | (0.90) |
| Net cash from financing activities | 13.38 | 18.11 | 27.74 | 4.98 | (1.16) | 5.31 | 5.32 |
| Net change in cash | (0.67) | (0.68) | 7.09 | (0.21) | (0.85) | (0.27) | 0.63 |
| Closing cash | 26.38 | 21.21 | 24.44 | 9.70 | 9.88 | 11.51 | 8.25 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Growth | |||||||
| Sales growth | +8.6% | -10.0% | +40.4% | +43.3% | +2.1% | -7.7% | - |
| EBITDA growth | +47.3% | -26.6% | +29.5% | +117.4% | +9.5% | -44.3% | - |
| PBT growth | +50.5% | -44.9% | +18.1% | +114.6% | +72.0% | -64.1% | +9997.0% |
| Net income growth | +64.2% | -48.1% | +20.8% | +151.1% | +48.4% | -64.9% | - |
| Revenue CAGR (3Y) | +11.1% | +21.9% | +27.1% | +10.5% | - | - | - |
| EBITDA CAGR (3Y) | +11.9% | +27.4% | +45.5% | +9.9% | - | - | - |
| Profitability & leverage | |||||||
| Net income margin | +3.5% | +2.5% | +4.1% | +4.7% | +3.3% | +1.8% | +4.8% |
| Return on capital employed | +11.3% | +9.4% | +16.6% | +17.1% | +8.7% | +8.9% | +16.6% |
| Return on net worth | +7.1% | +4.9% | +11.4% | +12.4% | +5.4% | +3.8% | +11.1% |
| Debt / equity | 0.78 | 0.59 | 0.51 | 0.53 | 0.50 | 0.43 | 0.36 |
| Long-term debt / equity | 0.06 | 0.04 | 0.07 | 0.07 | 0.05 | 0.04 | 0.02 |
| Interest cover | 57.49 | 61.97 | 42.46 | 36.30 | 51.30 | 70.28 | 33.03 |
| Efficiency & per share | |||||||
| Fixed asset turnover | 8.68 | 9.63 | 11.79 | 9.07 | 6.70 | 6.91 | 7.79 |
| Inventory turnover | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6.84 | 3.71 |
| Debtors turnover | 3.03 | 2.84 | 3.51 | 2.94 | 2.55 | 3.02 | 3.08 |
| EPS (₹) | 4.83 | 3.14 | 5.91 | 71.84 | 35.23 | 19.03 | 54.68 |
| Dividend per share (₹) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Book value per share (₹) | 70.18 | 65.35 | 62.26 | 618.95 | 542.37 | 507.15 | 491.99 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Revenue | 210 | 194 | 215 | 153 | 106 | 101 | 114 |
| Revenue growth | +8.6% | -10.0% | +40.4% | +44.8% | +5.1% | -11.3% | - |
| Other income | 2.33 | 1.94 | 2.09 | 1.72 | 1.85 | 1.28 | 1.15 |
| Total expenses | 190 | 181 | 197 | 139 | 98.68 | 93.97 | 103 |
| Employee cost | 32.35 | 32.56 | 32.10 | 23.61 | 17.70 | 17.07 | 16.54 |
| EBITDA | 20.21 | 13.11 | 18.81 | 14.28 | 7.24 | 6.77 | 10.78 |
| EBITDA margin | +9.6% | +6.8% | +8.7% | +9.3% | +6.8% | +6.7% | +9.5% |
| Depreciation | 1.77 | 1.09 | 0.99 | 0.81 | 0.78 | 0.92 | 0.87 |
| Interest | 10.48 | 7.74 | 7.43 | 4.89 | 3.27 | 3.63 | 3.27 |
| Profit before tax | 10.29 | 6.22 | 12.48 | 10.30 | 5.04 | 3.50 | 7.79 |
| Tax | 2.80 | 1.93 | 3.24 | 3.12 | 1.29 | 1.05 | 2.31 |
| Net profit | 7.51 | 4.44 | 8.87 | 7.08 | 3.05 | 2.45 | 5.42 |
| Net profit margin | +3.6% | +2.3% | +4.1% | +4.6% | +2.9% | +2.4% | +4.8% |
| EPS (₹) | 4.96 | 2.83 | 6.12 | 71.85 | 37.66 | 24.30 | 54.75 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Equity & liabilities | |||||||
| Share capital | 15.10 | 15.10 | 15.10 | 1.00 | 1.00 | 1.00 | 1.00 |
| Reserves & surplus | 91.05 | 83.56 | 79.38 | 61.04 | 54.24 | 50.66 | 48.34 |
| Shareholders' funds (net worth) | 106 | 98.66 | 94.48 | 62.04 | 55.24 | 51.66 | 49.34 |
| Secured loans | 86.03 | 68.27 | 44.82 | 33.92 | 25.93 | 25.01 | 17.21 |
| Unsecured loans | 4.18 | 0.71 | 0.28 | 1.30 | 0.73 | 1.26 | 0.60 |
| Total debt | 90.21 | 68.98 | 45.10 | 35.22 | 26.66 | 26.27 | 17.81 |
| Total liabilities | 196 | 168 | 140 | 97.27 | 81.90 | 77.93 | 67.16 |
| Assets | |||||||
| Gross block | 27.11 | 21.36 | 18.87 | 17.65 | 16.18 | 15.78 | 14.59 |
| Net block | 14.38 | 10.33 | 8.60 | 8.37 | 7.51 | 7.77 | 7.45 |
| Capital work in progress | 0.00 | 2.13 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Investments | 0.24 | 0.20 | 1.29 | 2.04 | 2.94 | 2.36 | 1.35 |
| Inventories | 0.00 | 0.00 | 0.00 | 0.00 | 35.94 | 34.82 | 30.66 |
| Sundry debtors | 72.12 | 66.85 | 69.46 | 53.17 | 51.28 | 32.70 | 36.85 |
| Cash & bank balances | 26.37 | 21.21 | 24.12 | 9.69 | 4.46 | 5.26 | 8.24 |
| Loans & advances | 147 | 132 | 95.77 | 69.75 | 7.96 | 12.14 | 12.67 |
| Total current assets | 246 | 220 | 189 | 133 | 99.64 | 84.92 | 88.42 |
| Total current liabilities | 69.79 | 70.87 | 66.03 | 49.19 | 34.17 | 23.86 | 37.03 |
| Net working capital | 176 | 149 | 123 | 83.42 | 65.47 | 61.06 | 51.39 |
| Total assets | 196 | 168 | 140 | 97.27 | 81.90 | 77.93 | 67.16 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Opening cash | 0.81 | 1.18 | 0.41 | 0.62 | 1.47 | 1,74,474 | 1.11 |
| Net cash from operating activities | (10.18) | (14.40) | (26.90) | (4.57) | 0.43 | (3.34) | (3.78) |
| Net cash from investing activities | (3.75) | (4.08) | 0.04 | (0.62) | (0.12) | (1,74,474) | (0.90) |
| Net cash from financing activities | 13.26 | 18.11 | 27.63 | 4.98 | (1.16) | 5.30 | 5.31 |
| Net change in cash | (0.67) | (0.37) | 0.77 | (0.21) | (0.85) | (1,74,472) | 0.63 |
| Closing cash | 26.37 | 21.21 | 24.12 | 9.69 | 4.46 | 5.26 | 8.24 |
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 | FY 2019-20 |
|---|---|---|---|---|---|---|---|
| Growth | |||||||
| Sales growth | +8.6% | -10.0% | +40.4% | +44.8% | +5.1% | -11.3% | - |
| EBITDA growth | +54.2% | -30.3% | +31.7% | +97.2% | +6.9% | -37.2% | - |
| PBT growth | +65.4% | -50.2% | +21.2% | +104.4% | +44.0% | -55.1% | +14.9% |
| Net income growth | +69.1% | -49.9% | +25.3% | +132.1% | +24.5% | -54.8% | - |
| Revenue CAGR (3Y) | +11.1% | +22.3% | +28.8% | +10.5% | +8.6% | +15.0% | - |
| EBITDA CAGR (3Y) | +12.3% | +21.9% | +40.6% | +9.8% | -6.3% | -8.7% | - |
| Profitability & leverage | |||||||
| Net income margin | +3.6% | +2.2% | +4.3% | +4.7% | +3.5% | +2.4% | +4.8% |
| Return on capital employed | +11.4% | +9.1% | +16.8% | +17.0% | +9.2% | +9.8% | +18.5% |
| Return on net worth | +7.3% | +4.4% | +11.8% | +12.3% | +5.7% | +4.8% | +12.0% |
| Debt / equity | 0.78 | 0.59 | 0.51 | 0.53 | 0.50 | 0.44 | 0.31 |
| Long-term debt / equity | 0.04 | 0.04 | 0.07 | 0.07 | 0.05 | 0.04 | 0.01 |
| Interest cover | 56.83 | 64.39 | 41.69 | 36.30 | 50.62 | 62.05 | 33.00 |
| Efficiency & per share | |||||||
| Fixed asset turnover | 8.68 | 9.63 | 11.79 | 9.07 | 6.63 | 6.63 | 8.06 |
| Inventory turnover | 0.00 | 0.00 | 0.00 | 8.54 | 2.99 | 3.08 | 4.42 |
| Debtors turnover | 3.03 | 2.84 | 3.51 | 2.94 | 2.52 | 2.90 | 3.86 |
| EPS (₹) | 4.96 | 2.83 | 6.12 | 71.85 | 37.66 | 24.30 | 54.75 |
| Dividend per share (₹) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Book value per share (₹) | 70.30 | 65.34 | 62.57 | 620.39 | 552.41 | 516.55 | 493.41 |
Board of Directors of Konstelec Engineers Limited
Konstelec Engineers has 6 current directors and 5 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Biharilal Ravilal Shah Also directs: Konstelec Hitech Engineers Private Limited | Whole-Time Director | 05 Dec 1995 | 30 Years 10 Months | Current |
| Amish Biharilal Shah | Managing Director | 02 Apr 2016 | 10 Years 6 Months | Current |
| Jigar Dhiresh Shah Also directs: Konstelec Sastra Automation Private Limited | Whole-Time Director | 27 Mar 2023 | 3 Years 6 Months | Current |
| Ranjan Mathur | Director | 01 Aug 2023 | 3 Years 2 Months | Current |
| Manisha Abhay Lalan | Director | 01 Aug 2023 | 3 Years 2 Months | Current |
| Amita Sachin Karia Also directs: Alna Trading and Exports Limited, Welspun Investments and Commercials Limited, Magellanic Cloud Limited and 5 more | Director | 18 Sep 2023 | 3 Years 1 Months | Current |
Peer Comparison of Konstelec Engineers Limited
Konstelec Engineers Limited is compared with the companies closest to it by revenue in the Engineering industry (Engineering Procurement and Construction). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Konstelec Engineers Limited this company | ₹210.39 Cr (FY 2026) | •••• | •••• | 8.6% | •••• | Mumbai, Maharashtra, India |
| Dmi Draexlmaier Manufacturing India Private Limited | ₹202.65 Cr (FY 2025) | •••• | •••• | 46.0% | •••• | Pune, Maharashtra, India |
| Ssepl Techno Private Limited | ₹201.24 Cr (FY 2024) | •••• | •••• | 162.0% | •••• | Pune, Maharashtra, India |
| Naolin Infrastructure Private Limited | ₹201.16 Cr (FY 2022) | •••• | •••• | 19.0% | •••• | Hyderabad, Telangana, India |
| Taal Tech Limited Listed | ₹198.31 Cr (FY 2024) | •••• | •••• | 19.0% | •••• | Bangalore, Karnataka, India |
| Metal Scope India Private Limited | ₹197.36 Cr (FY 2024) | •••• | •••• | -25.0% | •••• | Puducherry, India |
| Pradhan Associates Private Limited | ₹191.08 Cr (FY 2025) | •••• | •••• | 53.0% | •••• | Bhubaneswar, Odisha, India |
| Caresoft Global Private Limited | ₹190.49 Cr (FY 2024) | •••• | •••• | 22.0% | •••• | Coimbatore, Tamil Nadu, India |
| Yalavarti Projects Private Limited | ₹190.41 Cr (FY 2025) | •••• | •••• | 3.0% | •••• | Hyderabad, Telangana, India |
| Jain International Power Limited | ₹190.01 Cr (FY 2025) | •••• | •••• | 195.0% | •••• | Kolkata, West Bengal, India |
| Holistic Technoengineers Private Limited | ₹189.51 Cr (FY 2025) | •••• | •••• | 160.0% | •••• | New Delhi, Delhi, India |
Peers are the five companies nearest above and the five nearest below Konstelec Engineers by revenue in the Engineering industry (Engineering Procurement and Construction), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Auditor Details of Konstelec Engineers Limited
Konstelec Engineers Limited is audited by SHAH P M AND ASSOCIATES for the financial year 2024.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| SHAH P M AND ASSOCIATES | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Shareholding Pattern of Konstelec Engineers Limited
Shareholding for the quarter ended Sep 2026: promoters hold 66.80%, foreign institutional investors hold 0.00%, domestic institutional investors hold 0.00% and retail and other public shareholders hold 33.20%.
| Sep 2026 | Jun 2026 | Mar 2026 | Dec 2025 | |
|---|---|---|---|---|
| Promoters | 66.80% | 66.80% | 66.80% | 66.80% |
| Public | 33.20% | 33.20% | 33.20% | 33.20% |
Charges & Borrowings of Konstelec Engineers Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 09 Sep 2026 | Hdfc Bank Limited | ₹6.94 Cr | Open |
| 01 Sep 2026 | Others | ₹3 Cr | Open |
| 21 May 2026 | Others | ₹9.17 Lakh | Open |
| 17 Jan 2026 | Hdfc Bank Limited | ₹14 Lakh | Open |
| 17 Jan 2026 | Others | ₹11.8 Lakh | Open |
Total charge records: 32 View all charges
Deals & Funding of Konstelec Engineers Limited
Konstelec Engineers Limited has 3 deals on record (2 secondary share transfers, 1 ipo); the latest was in January 2024.
Deals on record (3 of 3)
| When | Deal | Amount | Parties |
|---|---|---|---|
| Jan 2024 | IPO | ₹28.7 Cr | Investors: FINAVENUE GROWTH FUND, INDIA MAX INVESTMENT FUND LIMITED, Moneywise Financial Services Private Limited |
| Sep 2017 | Secondary share transfer | Undisclosed | Buyer: 4 individuals Seller: 4 individuals |
| Aug 2009 | Secondary share transfer | Undisclosed | Buyer: an individual Seller: 4 individuals |
Full deal history
All 3 deals with amounts, valuations, instruments and every party are in the company report.
- Every funding round and share transfer
- Amounts and valuations
- Investors, buyers and sellers
- Instruments and deal dates
Verified entity values are shown only after access is granted.
Deal records are compiled from filings and public sources; amounts are shown only where the source reported them.
Legal Cases of Konstelec Engineers Limited
Konstelec Engineers Limited has 1 court case on record: 1 filed by Konstelec Engineers. All case is pending. Status as checked on 21 Sep 2026.
Cases by court
| Court | Cases | Against the company | Pending |
|---|---|---|---|
| High courts | 1 | 0 | 1 |
Cases on record (1 of 1)
| Court | Type of case | Party | Status |
|---|---|---|---|
| Allahabad High Court | Writ petition | Filed by the company against Advanced Weapon and Equipment India Limited | Pending |
Full case history
All 1 cases with case numbers, court, year-wise trend, opposite parties and decision dates are in the company report.
- Every case with its case number
- Year-wise trend
- Opposite parties
- Decision dates and orders
Verified entity values are shown only after access is granted.
Case records are compiled from court listings and may lag the court's own records. A case filed against a company is not a finding against it.
MSME Payment Delays by Konstelec Engineers Limited
Konstelec Engineers Limited has 12 MSME Form 1 returns on record between 2019 and 2024, listing 473 overdue payments to 45 micro and small suppliers. Companies must report dues to micro and small suppliers that stay unpaid for more than 45 days in a half-yearly MSME Form 1 return.
Suppliers with reported dues (5 of 45)
| Supplier | Amount due | Due since | Reported on |
|---|---|---|---|
| Gujarat Plug-In Devices Pvt Ltd | •••• | •••• | •••• |
| Hirpara Metal Products | •••• | •••• | •••• |
| Stratpro Hvacr and Building Solutions Private Limited | •••• | •••• | •••• |
| an individual supplier | •••• | •••• | •••• |
| an individual supplier | •••• | •••• | •••• |
Full MSME payment history
Every supplier, amount and due date from all 12 MSME Form 1 returns is in the company report.
- Every reported supplier due
- Amounts and due dates
- Reasons given in each return
- Period-by-period history
Verified entity values are shown only after access is granted.
Individuals and sole proprietors among the suppliers are not named. Amounts, due dates and filing dates are in the company report.
Employees and EPFO Compliance at Konstelec Engineers Limited
Konstelec Engineers Limited has a workforce of 1,894 employees as of Apr 05, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Group Structure of Konstelec Engineers Limited
Konstelec Engineers has 1 joint venture. This group structure data is as of FY 2024. The table lists each entity with its relationship and holding.
Recent Activity on Konstelec Engineers Limited
Konstelec Engineers Limited has 13 board changes on record since 1995: 10 appointments and 3 cessations. The latest: Hardik Maheshbhai Sarvaiya was appointed as CFO on 17 Oct 2024.
52 earlier events are listed in the company report.
Credit Ratings, Litigation & Regulatory Alerts for Konstelec Engineers Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Konstelec Engineers Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Konstelec Engineers Limited
Konstelec Engineers has 25 GST registrations: 20 active and 5 cancelled or inactive. The first 4 active GSTINs are listed below.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 27AAACK2747D1ZS | Maharashtra | Active | 01 Jul 2017 |
| 27AAACK2747D2ZR | Maharashtra | Active | 27 Sep 2017 |
| 03AAACK2747D1Z2 | Punjab | Active | 01 Jul 2017 |
| 06AAACK2747D1ZW | Haryana | Active | 01 Jul 2017 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Konstelec Engineers Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Related news about Konstelec Engineers Limited
Frequently Asked Questions about Konstelec Engineers Limited
Konstelec Engineers is an active public limited company based in Mumbai, Maharashtra, India. The company works in general purpose and special purpose machinery and equipment, within the electrical industry. It was incorporated on 05 December 1995 (31+ years old) and is registered under CIN L45203MH1995PLC095011. Listed on NSE: KONSTELEC.
Konstelec Engineers reported revenue of ₹210.39 Cr for FY 2025-26 (up 8.6% YoY) based on consolidated financials.
Konstelec Engineers has 6 current directors:
- Amish Biharilal Shah - Managing Director
- Biharilal Ravilal Shah - Whole-Time Director
- Jigar Dhiresh Shah - Whole-Time Director
- Ranjan Mathur - Director
- Manisha Abhay Lalan - Director
- Amita Sachin Karia - Director
The GSTIN of Konstelec Engineers is 27AAACK2747D1ZS, registered in Maharashtra. The company has 25 GST registrations in all, of which 20 are active and 5 are cancelled or inactive. Other active GSTINs include 27AAACK2747D2ZR (Maharashtra), 03AAACK2747D1Z2 (Punjab), 06AAACK2747D1ZW (Haryana).
The CIN (Corporate Identification Number) of Konstelec Engineers is L45203MH1995PLC095011. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Yes. Konstelec Engineers is listed on NSE with symbol KONSTELEC.
Konstelec Engineers has 1 court case on record: 1 filed by the company. 1 is pending.
Konstelec Engineers was incorporated on 05 December 1995, making it 31+ years old. It is registered with the Registrar of Companies, Mumbai.
Konstelec Engineers has 3 deals on record (2 secondary share transfers, 1 ipo); the latest was in January 2024.
The peers of Konstelec Engineers by revenue are Dmi Draexlmaier Manufacturing India Private Limited, Ssepl Techno Private Limited, Naolin Infrastructure Private Limited, Taal Tech Limited, Metal Scope India Private Limited and 5 more, all in the Engineering industry (Engineering Procurement and Construction).
Hardik Maheshbhai Sarvaiya was appointed as CFO on 17 Oct 2024. Amita Sachin Karia was appointed as Director on 18 Sep 2023. Manisha Abhay Lalan was appointed as Director on 01 Aug 2023. Konstelec Engineers has 13 board changes on record in total.
Yes, Konstelec Engineers is registered as a medium enterprise under Udyam registration (number: UDYAM-MH-18-0002305).