
Mintack Engineering Private Limited
CIN: U28997DL2021PTC391373New Delhi, Delhi, India
About Mintack Engineering Private Limited
Data last updated:
Mintack Engineering Private Limited is a private limited company based in New Delhi, Delhi, India. It operates in the cables and wires segment of the manufacturing sector. It was incorporated on 17 December 2021 and has been in existence for over 5 years.
The company is registered with the Registrar of Companies (ROC), Delhi, under CIN U28997DL2021PTC391373. Its GSTIN is 07AAPCM2880G1Z5 (Delhi). The company has an authorised share capital of ₹5 Lakh and a paid-up capital of ₹5 Lakh. It has 2 current directors: Raj Gupta and Rohit Gupta.
As per the financials filed for FY 2025, the company reported a revenue of ₹10.72 Cr, a growth of 9% compared to the previous year. It closed the year with a net profit.
Company details
- Private Limited Company
- Registration number 391373
- Incorporated 17 December 2021
- Authorised capital ₹5 Lakh
- Turnover of ₹10 crore to ₹100 crore
- Revenue ₹10.72 Cr in FY 2025
- Company limited by shares
- Non-government company
- Class: Private
- Business activity, as per the annual return of FY 2024: Metal and metal products
Contact details
Mintack Engineering Private Limited's registered office is in New Delhi, Delhi.
- Registered AddressProperty No. 12 Pocket – L Sector – 5 DSIIDC Bawana Industrial Area Bawana, New Delhi, Delhi, India – 110039
- City: New Delhi
- State: Delhi
- PIN Code: 110039
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Business activity
The main business activity of Mintack Engineering is manufacturing. In detail, this covers metal and metal products.
| Main activity group code | Main activity | Business activity code | Business activity | Share of turnover |
|---|---|---|---|---|
| C | Manufacturing | C7 | Metal and metal products |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Mintack Engineering Private Limited
FY 2025 filings availableMintack Engineering Private Limited reported revenue of ₹10.72 Cr (up 9% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR)
Revenue has grown at a compounded annual rate (CAGR) of 244% over three years, including 9% growth in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Summary
| Summary | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue | 10.72 Cr | |||
| EBITDA | ||||
| EBITDA Margin | ||||
| Profit After Tax | ||||
| PAT Margin | ||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since FY 2021-22, up to FY 2024-25. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | ||||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Liquidity ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since incorporation
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Mintack Engineering Private Limited
Mintack Engineering has 2 current directors and 2 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Raj Gupta | Director | 07 Sep 2022 | 4 yrs 2 mos | Current |
| Rohit Gupta | Director | 17 Dec 2021 | 4 yrs 11 mos | Current |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Mintack Engineering Private Limited is compared with the 10 companies closest to it by revenue in the Manufacturing industry (Cables and Wires), with the same principal business activity (metal and metal products), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Andritz Euroslot India Private Limited | ₹11.34 Cr FY 2022 | 20.0% | Chennai, Tamil Nadu, India | |||
| Classic Wire Products Private Limited | ₹11.25 Cr FY 2025 | -4.0% | Raipur, Chhattisgarh, India | |||
| Adity Composite Private Limited | ₹10.84 Cr FY 2024 | 418.0% | Bengaluru, Karnataka, India | |||
| GPL Technical Solutions Private Limited | ₹10.83 Cr FY 2024 | 46.0% | New Delhi, Delhi, India | |||
| Mintack Engineering Private Limitedthis company | ₹10.72 Cr FY 2025 | 9.0% | New Delhi, Delhi, India | |||
| Hind Aluminium Industries Limited | ₹10.54 Cr FY 2026 | 77.0% | Mumbai, Maharashtra, India | |||
| Sreekha Wire Products Private Limited | ₹10.48 Cr FY 2025 | -6.0% | Tiruvallur, Tamil Nadu, India | |||
| Pride Wires Private Limited | ₹10.4 Cr FY 2024 | 37.0% | Indore, Madhya Pradesh, India | |||
| Shriram Transmission Products Private Limited | ₹10.38 Cr FY 2025 | 8.0% | Chhatrapati Sambhajinagar, Maharashtra, India | |||
| Gauravi Steels Private Limited | ₹10.31 Cr FY 2025 | 76.0% | Jaipur, Rajasthan, India | |||
| Daksh Wire and Pin Private Limited | ₹10.27 Cr FY 2025 | -24.0% | Serampore, West Bengal, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Charges & borrowings
Mintack Engineering Private Limited has 2 charge records registered with the MCA, created between 2023 and 2025: 2 open and none satisfied.
Open charges by lender
Open and latest charges
| Created on | Charge ID | Lender | Amount | Status |
|---|---|---|---|---|
| 24 Sep 2025 | 101161283 | Electronica Finance Limited | ₹36.89 Lakh | Open |
| 31 Aug 2023 | 100828701 | Kotak Mahindra Prime Limited | ₹14.64 Lakh | Open |
- Every charge record
- Creation, last modification and satisfaction date of each charge
- Open and satisfied amount with every lender
- Each lender's share of the open amount
GST
Mintack Engineering has 1 GST registration: 1 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 07AAPCM2880G1Z5 | Delhi | Active | 24 Jan 2022 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Mintack Engineering Private Limited has 4 board changes on record since 2021: 2 appointments and 2 cessations. The latest: Raj Gupta ceased to be Additional Director on 30 Nov 2022.
| Date | Type | Event |
|---|---|---|
| 1 year 1 month ago | AGM | Mintack Engineering Private Limited last Annual general meeting of members was held on 30 Sep 2025 as per latest MCA records. |
| 1 year 2 months ago | Charges | A charge with Electronica Finance Limited amounted to Rs. 36.89 Lakh with Charge ID 101161283 was registered on 24 Sep 2025. |
| 1 year 7 months ago | Filing | Mintack Engineering Private Limited has filed its annual Financial statements for the year ended 31 Mar 2025 with ROC Delhi. |
| 3 years ago | Charges | A charge with Kotak Mahindra Prime Limited amounted to Rs. 14.64 Lakh with Charge ID 100828701 was registered on 31 Aug 2023. |
| 3 years ago | Ceased | Raj Gupta ceased to be Additional Director. |
| 4 years ago | Appointed | Raj Gupta was appointed as Director. |
| 4 years ago | Ceased | Vipin Sharma ceased to be Director. |
| 4 years ago | Appointed | Rohit Gupta was appointed as Director. |
Also available in the company report of Mintack Engineering Private Limited
Legal cases
- Court and tribunal cases, with case number, court and year
- Parties to each case and its status
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Mintack Engineering is an active private limited company based in New Delhi, Delhi, India. The company works in cables and wires, within the manufacturing industry. It was incorporated on 17 December 2021 (5+ years old) and is registered under CIN U28997DL2021PTC391373.
Mintack Engineering has 2 current directors:
- Raj Gupta - Director
- Rohit Gupta - Director
The latest financial statements of Mintack Engineering on record with the MCA are for the year ended 31 March 2025. Its last annual general meeting was held on 30 September 2025. Year-wise statements from FY 2022 are in the company report.
The GSTIN of Mintack Engineering is 07AAPCM2880G1Z5, registered in Delhi.
The CIN (Corporate Identification Number) of Mintack Engineering is U28997DL2021PTC391373. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Mintack Engineering was incorporated on 17 December 2021, making it 5+ years old. It is registered with the Registrar of Companies, Delhi.
The peers of Mintack Engineering by revenue are Andritz Euroslot India Private Limited, Classic Wire Products Private Limited, Adity Composite Private Limited, GPL Technical Solutions Private Limited, Hind Aluminium Industries Limited and 5 more, all in the Manufacturing industry (Cables and Wires), with the same principal business activity (metal and metal products).
Raj Gupta ceased to be Additional Director on 30 Nov 2022. Raj Gupta was appointed as Director on 07 Sep 2022. Vipin Sharma ceased to be Director on 06 Sep 2022. Mintack Engineering has 4 board changes on record in total.
The registered office of Mintack Engineering is at Property No. 12 Pocket – L Sector – 5 DSIIDC Bawana Industrial Area Bawana, New Delhi, Delhi, India – 110039.
Mintack Engineering operates in the manufacturing industry, in the cables and wires segment.
Mintack Engineering has open charges of ₹51.53 Lakh and no satisfied charges on record as per latest MCA filings.

