
Nabakiran Power Projects Limited
About Nabakiran Power Projects Limited
Data last updated:
Nabakiran Power Projects Limited is a public limited company based in Kolkata, West Bengal, India. It operates in the electrical equipment manufacturing segment of the electrical equipment sector. It was incorporated on 28 March 2012 and has been in existence for over 14 years.
The company is registered with the Registrar of Companies (ROC), Kolkata, under CIN U40102WB2012PLC178110.
The company has an authorised share capital of ₹1 Cr and a paid-up capital of ₹5 Lakh. It was formerly known as Nabakiran Power Porjects Limited. It is led by directors including Toushik Ghosh and Sachin Mondal.
Its last annual general meeting (AGM) was held on 30 September 2019, and its latest financial statements are for the year ended 31 March 2019. The registered office is at 85/1 B.B. Chatterjee Road Kasba, Kolkata, West Bengal, India – 700042.
The current compliance status is marked as active non-compliant by the Registrar of Companies.
- EmailLocked
- TelephoneLocked
- WebsiteLocked
- Social MediaLocked
- Registered Address85/1 B.B. Chatterjee Road Kasba, Kolkata, West Bengal, India – 700042
- IndustryElectrical, Electrical Equipment, Transport Equipment, General Purpose And Special Purpose Machinery & Equipment
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of Nabakiran Power Projects Limited
The main business activity of Nabakiran Power Projects is manufacturing. In detail, this covers electrical equipment, general purpose and special purpose machinery & equipment, transport equipment.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| C | Manufacturing | C10 | Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Nabakiran Power Projects Limited FY 2019 filings available
Financial Statement Summary of Nabakiran Power Projects Limited
| Metrics | FY 2016-17 | FY 2015-16 | FY 2014-15 |
|---|---|---|---|
| Profit and Loss Statement | |||
| Revenue from Operations | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• |
| EBITDA | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• |
| Net Profit (PAT) | •••• | •••• | •••• |
| Balance Sheet | |||
| Share Capital | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• |
Financial Ratios of Nabakiran Power Projects Limited
| Metrics | FY 2016-17 | FY 2015-16 | FY 2014-15 |
|---|---|---|---|
| Profitability | |||
| EBITDA Margin | •••• | •••• | •••• |
| Net Profit Margin | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• |
| Liquidity and Debt | |||
| Current Ratio | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• |
| Efficiency and Growth | |||
| Asset Turnover | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Nabakiran Power Projects are in the company report.
Financial statements from 2015
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Board of Directors of Nabakiran Power Projects Limited
Nabakiran Power Projects has 3 current directors and 2 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Toushik Ghosh | Director | 28 Mar 2012 | 14 Years 6 Months | Current |
| Sachin Mondal | Director | 28 Mar 2012 | 14 Years 6 Months | Current |
| Ranjan Chowdhury | Director | 28 Mar 2012 | 14 Years 6 Months | Current |
Auditor Details of Nabakiran Power Projects Limited
Nabakiran Power Projects Limited is audited by MUNSHI AND BHATTACHARYA for the financial year 2017.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| MUNSHI AND BHATTACHARYA | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Ownership and Shareholding of Nabakiran Power Projects Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Nabakiran Power Projects Limited
Nabakiran Power Projects Limited does not have any charges (loans) registered with the Registrar of Companies.
Employees and EPFO Compliance at Nabakiran Power Projects Limited
Employment history and EPFO contributions of people linked to Nabakiran Power Projects.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on Nabakiran Power Projects Limited
Nabakiran Power Projects Limited has 5 board changes on record since 2012: 3 appointments and 2 cessations. The latest: Pradip Kumar Bera ceased to be Director on 10 Sep 2018.
Credit Ratings, Litigation & Regulatory Alerts for Nabakiran Power Projects Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by Nabakiran Power Projects Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Nabakiran Power Projects Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Nabakiran Power Projects Limited
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Nabakiran Power Projects Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Nabakiran Power Projects Limited
Nabakiran Power Projects is an active public limited company based in Kolkata, West Bengal, India. The company works in electrical equipment, within the electrical industry. It was incorporated on 28 March 2012 (14+ years old) and is registered under CIN U40102WB2012PLC178110.
Nabakiran Power Projects has 3 current directors:
- Toushik Ghosh - Director
- Sachin Mondal - Director
- Ranjan Chowdhury - Director
The CIN (Corporate Identification Number) of Nabakiran Power Projects is U40102WB2012PLC178110. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Nabakiran Power Projects was incorporated on 28 March 2012, making it 14+ years old. It is registered with the Registrar of Companies, Kolkata.
Pradip Kumar Bera ceased to be Director on 10 Sep 2018. Seetha Kalyan Raman Raman ceased to be Director on 10 Sep 2018. Ranjan Chowdhury was appointed as Director on 28 Mar 2012. Nabakiran Power Projects has 5 board changes on record in total.
The registered office of Nabakiran Power Projects is at 851 B.B. Chatterjee Road Kasba, Kolkata, West Bengal, India – 700042.
Nabakiran Power Projects has an authorised share capital of ₹1 Cr and a paid-up capital of ₹5 Lakh.
Nabakiran Power Projects operates in the electrical industry, in the electrical equipment segment.
No. Nabakiran Power Projects is not listed on any stock exchange. It is an unlisted company.
The compliance status of Nabakiran Power Projects is active non-compliant as of 12 August 2026. The company is actively filing with the Registrar of Companies.