- Category
- Micro (2024-25)
- Udyam number
- UDYAM-OD-19-0000818

About Naivedya Power Construction Private Limited
Data last updated:
Naivedya Power Construction Private Limited is a private limited company based in Bhubaneswar, Odisha, India. It operates in the power equipment manufacturers segment of the energy and power sector. It was incorporated on 05 November 2013 and has been in existence for over 13 years.
The company is registered with the Registrar of Companies (ROC), Cuttack, under CIN U31401OR2013PTC017530. Its GSTIN is 21AATCS8507N1ZQ (Odisha). The company holds 2 GST registrations, of which 1 is active.
The company has an authorised share capital of ₹10 Lakh and a paid-up capital of ₹10 Lakh. It was formerly known as Srimad Sarathi Power Construction Private Limited. It is led by directors Rasmi Ranjan Parida (Managing Director) and Sagarika Nayak.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at Sanjukta Palace Plot No – 3705(P) Prachi Vihar Palasuni Po – Ggp, Bhubaneswar, Odisha, India – 751025.
As per the financials filed for FY 2025, the company reported a revenue of ₹2.73 Cr, a decline of 16% compared to the previous year. For the same year it recorded a net profit of ₹13.47 Lakh (net margin 4.9%) and EBITDA of ₹25.73 Lakh (EBITDA margin 9.4%). Revenue has grown at a compounded annual rate (CAGR) of 24% over three years and 13% over five years.
The company has about 11 employees on its provident fund (EPFO) records.
As per MCA filings, the company has open charges of ₹37.5 Lakh and satisfied charges of ₹15.41 Lakh on record.
Naivedya Power Construction Private Limited is registered as a micro enterprise under the Udyam registration framework (Reg. No. UDYAM-OD-19-0000818). The current compliance status is marked as compliant by the Registrar of Companies. For more details, the company can be reached via its website naivedyapower.com.
Recognitions & Rankings of Naivedya Power Construction
- EmailLocked
- TelephoneLocked
- Website
- Social MediaLocked
- Registered AddressSanjukta Palace Plot No – 3705(P) Prachi Vihar Palasuni Po – Ggp, Bhubaneswar, Odisha, India – 751025
- IndustryEnergy and Power, Power Equipment Manufacturers
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of Naivedya Power Construction Private Limited
The main business activity of Naivedya Power Construction is construction. In detail, this covers demolition & site preparation, electrical, plumbing & other specialized construction activities.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| F | Construction | F3 | Demolition & site preparation, Electrical, plumbing & other Specialized construction Activities | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Naivedya Power Construction Private Limited FY 2025 filings available
Naivedya Power Construction Private Limited reported revenue of ₹2.73 Cr (down 16% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR) of Naivedya Power Construction Private Limited
Revenue fell 16% in the latest year, but over five years it has grown at a compounded annual rate (CAGR) of 13%. EBITDA fell 5% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of Naivedya Power Construction Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹25.73 Lakh | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | ₹13.47 Lakh | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of Naivedya Power Construction Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 9.4% | •••• | •••• | •••• | •••• |
| Net Profit Margin | 4.9% | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Naivedya Power Construction are in the company report.
Financial statements from 2015
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Board of Directors of Naivedya Power Construction Private Limited
Naivedya Power Construction has 2 current directors and 3 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Sagarika Nayak | Director | 09 May 2022 | 4 Years 5 Months | Current |
| Rasmi Ranjan Parida | Managing Director | 05 Nov 2013 | 12 Years 11 Months | Current |
Peer Comparison of Naivedya Power Construction Private Limited
Naivedya Power Construction Private Limited is compared with the companies closest to it by revenue in the Power industry (Power Equipment Manufacturers). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Jaya Technologies System Private Limited | ₹2.75 Cr (FY 2024) | •••• | •••• | 9.0% | •••• | Gwalior, Madhya Pradesh, India |
| Siddheshwar Fabtech Private Limited | ₹2.74 Cr (FY 2024) | •••• | •••• | 321.0% | •••• | Osmanabad, Maharashtra, India |
| Harshiddh Vidhyut Renewable Projects (OPC) Private Limited | ₹2.74 Cr (FY 2025) | •••• | •••• | 135.0% | •••• | Patan, Gujarat, India |
| Total Power Conditioners Private Limited | ₹2.73 Cr (FY 2025) | •••• | •••• | -41.0% | •••• | Bangalore, Karnataka, India |
| Ras Automation Solution Private Limited | ₹2.73 Cr (FY 2025) | •••• | •••• | -14.0% | •••• | New Delhi, Delhi, India |
| Naivedya Power Construction Private Limited this company | ₹2.73 Cr (FY 2025) | •••• | •••• | -16.0% | •••• | Bhubaneswar, Odisha, India |
| Energid Control and Solutions Private Limited | ₹2.72 Cr (FY 2024) | •••• | •••• | 38.0% | •••• | Zirakpur, Punjab, India |
| Chennai Hi-Tech Engineering Private Limited | ₹2.72 Cr (FY 2023) | •••• | •••• | -57.0% | •••• | Kanchipuram, Tamil Nadu, India |
| Eaei Transformers Private Limited | ₹2.72 Cr (FY 2025) | •••• | •••• | 25.0% | •••• | Gaya, Bihar, India |
| Baron Power Limited | ₹2.72 Cr (FY 2024) | •••• | •••• | 35.0% | •••• | Chennai, Tamil Nadu, India |
| Inspire Electric Private Limited | ₹2.72 Cr (FY 2025) | •••• | •••• | 23.0% | •••• | Alapuzha, Kerala, India |
Peers are the five companies nearest above and the five nearest below Naivedya Power Construction by revenue in the Power industry (Power Equipment Manufacturers), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Auditor Details of Naivedya Power Construction Private Limited
Naivedya Power Construction Private Limited is audited by S T BARIK & ASSOCIATES for the financial year 2017.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| S T BARIK & ASSOCIATES | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Ownership and Shareholding of Naivedya Power Construction Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Naivedya Power Construction Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 14 Sep 2023 | Bank of India | ₹12.5 Lakh | Open |
| 13 Feb 2017 | Bank of India | ₹25 Lakh | Open |
| 13 Sep 2016 | Bank of India | ₹6.25 Lakh | Satisfied |
| 11 Feb 2016 | Bank of India | ₹9.16 Lakh | Satisfied |
Total charge records: 4 View all charges
Employees and EPFO Compliance at Naivedya Power Construction Private Limited
Naivedya Power Construction Private Limited has a workforce of 11 employees as of Apr 02, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on Naivedya Power Construction Private Limited
Naivedya Power Construction Private Limited has 5 board changes on record since 2013: 2 appointments and 3 cessations. The latest: Rasmi Ranjan Parida ceased to be Director on 09 May 2022.
2 earlier events are listed in the company report.
Credit Ratings, Litigation & Regulatory Alerts for Naivedya Power Construction Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by Naivedya Power Construction Private Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Naivedya Power Construction Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Naivedya Power Construction Private Limited
Naivedya Power Construction has 2 GST registrations: 1 active and 1 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 21AATCS8507N1ZQ | Odisha | Active | 01 Jul 2017 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Naivedya Power Construction Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Naivedya Power Construction Private Limited
Naivedya Power Construction is an active private limited company based in Bhubaneswar, Odisha, India. The company works in power equipment manufacturers, within the energy and power industry. It was incorporated on 05 November 2013 (13+ years old) and is registered under CIN U31401OR2013PTC017530.
Naivedya Power Construction reported revenue of ₹2.73 Cr for FY 2025 (down 16% YoY).
Naivedya Power Construction has 2 current directors:
- Rasmi Ranjan Parida - Managing Director
- Sagarika Nayak - Director
Naivedya Power Construction reported a net profit of ₹13.47 Lakh (net margin 4.9%) and EBITDA of ₹25.73 Lakh (EBITDA margin 9.4%) for FY 2025, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of Naivedya Power Construction is 24% over three years and 13% over five years. In the latest year (FY 2025) revenue fell 16%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of Naivedya Power Construction is 21AATCS8507N1ZQ, registered in Odisha. The company has 2 GST registrations in all, of which 1 is active and 1 is cancelled or inactive.
The CIN (Corporate Identification Number) of Naivedya Power Construction is U31401OR2013PTC017530. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Naivedya Power Construction was incorporated on 05 November 2013, making it 13+ years old. It is registered with the Registrar of Companies, Cuttack.
The peers of Naivedya Power Construction by revenue are Jaya Technologies System Private Limited, Siddheshwar Fabtech Private Limited, Harshiddh Vidhyut Renewable Projects (OPC) Private Limited, Total Power Conditioners Private Limited, Ras Automation Solution Private Limited and 5 more, all in the Power industry (Power Equipment Manufacturers).
Rasmi Ranjan Parida ceased to be Director on 09 May 2022. Sagarika Nayak was appointed as Director on 09 May 2022. Sanjukta Nayak ceased to be Director on 04 May 2022. Naivedya Power Construction has 5 board changes on record in total.
Yes, Naivedya Power Construction is registered as a micro enterprise under Udyam registration (number: UDYAM-OD-19-0000818).