
About Powergrid Varanasi Transmission System Limited
Data last updated:
Powergrid Varanasi Transmission System Limited is a public limited union government company based in New Delhi, Delhi, India, a subsidiary of Power Grid Corporation Of India Limited. It operates in the power transmission and distribution services segment of the energy and power sector. It was incorporated on 12 January 2017 and has been in existence for over 9 years.
The company is registered with the Registrar of Companies (ROC), Delhi, under CIN U40100DL2017GOI310478. Its GSTIN is 23AABCW9479K1ZP (Madhya Pradesh). The company holds 4 GST registrations, all of them active.
The company has an authorised share capital of ₹198.9 Cr and a paid-up capital of ₹187.56 Cr. It was formerly known as Wr-Nr Power Transmission Limited. It is led by directors including Kumud Wadhwa and Ajaya Kumar Satapathy.
Its last annual general meeting (AGM) was held on 26 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at B – 9 Qutab Institutional Area Katwaria Sarai, New Delhi, Delhi, India – 110016.
As per the financials filed for FY 2025, the company reported a revenue of ₹121.36 Cr. For the same year it recorded a net profit of ₹28.51 Cr (net margin 23.5%) and EBITDA of ₹117.21 Cr (EBITDA margin 96.6%). Revenue has grown at a compounded annual rate (CAGR) of 15% over three years.
The company has 1 deal on record (1 acquisition); the latest was in March 2018. Its 5 peer companies in the Power industry (Transmission and Distribution), with the same principal business activity (electric power generation, transmission and distribution) are compared by revenue, 5 smaller; the largest is Se Solar Limited with revenue of ₹120.61 Cr.
The current compliance status is marked as compliant by the Registrar of Companies. For more details, the company can be reached via its website powergrid.in.
Company details
Name history
Powergrid Varanasi Transmission System has undergone 3 name changes throughout its history. The company was previously known as Powergrid Varanasi Transmission System Limited, Wr-Nr Power Transmission Limited, and Powergrid Varanasi Transmission Limited. The current legal name is Powergrid Varanasi Transmission System Limited.
| Company Name | Status |
|---|---|
| Powergrid Varanasi Transmission System Limited | Current |
| Wr-Nr Power Transmission Limited | Previous |
| Powergrid Varanasi Transmission Limited | Previous |
Contact details
Powergrid Varanasi Transmission System Limited's registered office is in New Delhi, Delhi. Its website is powergrid.in. Its e-mail address is in the company report.
- Email
- Website
- Registered AddressB – 9 Qutab Institutional Area Katwaria Sarai, New Delhi, Delhi, India – 110016
- IndustryEnergy and Power, Power Transmission & Distribution Services
To see the full contact details of Powergrid Varanasi Transmission System Limited, buy the company report.
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Business activity
The main business activity of Powergrid Varanasi Transmission System is electricity, gas, steam and air condition supply. In detail, this covers electric power generation, transmission and distribution.
| Main activity group code | Main activity | Business activity code | Business activity | Share of turnover |
|---|---|---|---|---|
| D | Electricity, gas, steam and air condition supply | D1 | Electric power generation, transmission and distribution |
To see the full business activity and turnover split of Powergrid Varanasi Transmission System Limited, buy the company report.
Financials of Powergrid Varanasi Transmission System Limited
FY 2025 filings availablePowergrid Varanasi Transmission System Limited reported revenue of ₹121.36 Cr for FY 2025.
Compounded Annual Growth Rate (CAGR)
Revenue has grown at a compounded annual rate (CAGR) of 15% over three years. EBITDA fell 1% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | |||||
| Other Income | |||||
| Total Revenue | |||||
| Cost of Materials Consumed | |||||
| Employee Benefit Expense | |||||
| Finance Costs | |||||
| Depreciation and Amortisation | |||||
| Other Expenses | |||||
| Total Expenses | |||||
| EBITDA | ₹117.21 Cr | ||||
| Profit Before Tax | |||||
| Tax Expense | |||||
| Net Profit (PAT) | ₹28.51 Cr | ||||
| Balance Sheet | |||||
| Share Capital | |||||
| Reserves and Surplus | |||||
| Net Worth (Total Equity) | |||||
| Long-term Borrowings | |||||
| Short-term Borrowings | |||||
| Trade Payables | |||||
| Total Liabilities | |||||
| Fixed Assets | |||||
| Investments | |||||
| Inventories | |||||
| Trade Receivables | |||||
| Cash and Bank Balance | |||||
| Total Assets | |||||
Financial Ratios
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 96.6% | ||||
| Net Profit Margin | 23.5% | ||||
| Return on Equity (ROE) | |||||
| Return on Capital Employed (ROCE) | |||||
| Return on Assets (ROA) | |||||
| Liquidity and Debt | |||||
| Current Ratio | |||||
| Quick Ratio | |||||
| Debt-to-Equity Ratio | |||||
| Interest Coverage Ratio | |||||
| Efficiency and Growth | |||||
| Asset Turnover | |||||
| Receivable Days | |||||
| Payable Days | |||||
| Inventory Days | |||||
| Revenue Growth | |||||
| Net Profit Growth | |||||
To see the full financial statements and ratios of Powergrid Varanasi Transmission System Limited, buy the company report.
Board of directors of Powergrid Varanasi Transmission System Limited
Powergrid Varanasi Transmission System has 5 current directors and 25 former directors. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Dilip Nagesh Rozekar | Additional Director | 23 Jan 2026 | 0 Years 9 Months | Current |
| Kumud Wadhwa | Director | 02 Jul 2025 | 1 Years 4 Months | Current |
| Ajaya Kumar Satapathy | Director | 25 Apr 2025 | 1 Years 6 Months | Current |
| Anand Dubey | Director | 19 Dec 2024 | 1 Years 10 Months | Current |
| Yugesh Kumar Dixit | Director | 17 Dec 2024 | 1 Years 11 Months | Current |
Peer comparison
Powergrid Varanasi Transmission System Limited is compared with the 5 companies closest to it by revenue in the Power industry (Transmission and Distribution), with the same principal business activity (electric power generation, transmission and distribution), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Powergrid Varanasi Transmission System Limitedthis company | ₹121.36 Cr (FY 2025) | ₹28.51 Cr | 23.5% | New Delhi, Delhi, India | ||
| Se Solar Limited | ₹120.61 Cr (FY 2019) | 114.0% | Ahmedabad, Gujarat, India | |||
| Central Transmission Utility of India Limited | ₹118.25 Cr (FY 2025) | 15.0% | Gurgaon, Haryana, India | |||
| NRSS Xxxvi Transmission Limited | ₹113.14 Cr (FY 2025) | 15.0% | New Delhi, Delhi, India | |||
| Powergrid Meerut Simbhavali Transmission Limited | ₹113.1 Cr (FY 2025) | 11.0% | New Delhi, Delhi, India | |||
| Gadag Ii-A Transmission Limited | ₹113.1 Cr (FY 2025) | -31.0% | Delhi, India |
To see the full peer comparison of Powergrid Varanasi Transmission System Limited, buy the company report.
Auditor
Powergrid Varanasi Transmission System Limited is audited by DUBE PANDEY & CO for the financial year 2023.
| Auditor firm | Financial year | Firm registration number |
|---|---|---|
| DUBE PANDEY & CO | FY 2023 | 010593C |
Shareholding
The shareholding of Powergrid Varanasi Transmission System Limited is on record for 5 financial years, the latest being FY 2023, split between promoters, domestic institutions, public shareholders and others.
| Shareholder category | FY 2023 | FY 2022 | FY 2021 | FY 2020 | FY 2019 |
|---|---|---|---|---|---|
| Promoters | |||||
| Domestic institutional investors (DII) | |||||
| Public | |||||
| Others |
To see the full shareholding pattern of Powergrid Varanasi Transmission System Limited, buy the company report.
Deals & funding
Powergrid Varanasi Transmission System Limited has 1 deal on record (1 acquisition); the latest was in March 2018.
Deals on record (1 of 1)
| When | Deal | Amount | Parties |
|---|---|---|---|
| Mar 2018 | Acquisition | Undisclosed | Buyer: Power Grid Corporation of India Limited Seller: Rec Transmission Projects Company Limited |
Deal records are compiled from filings and public sources; amounts are shown only where the source reported them.
Legal cases
No court or tribunal cases involving Powergrid Varanasi Transmission System Limited are on our record; a case search with case numbers, parties and status is in the company report Buy the company report.
MSME payment delays
No delayed payments to MSME suppliers are on our record for Powergrid Varanasi Transmission System Limited; the supplier-wise MSME Form 1 check is in the company report Buy the company report.
GST
Powergrid Varanasi Transmission System has 4 GST registrations: 4 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 23AABCW9479K1ZP | Madhya Pradesh | Active | 01 Jun 2018 |
| 09AABCW9479K1ZF | Uttar Pradesh | Active | 14 Jun 2018 |
| 23AABCW9479K1DY | Madhya Pradesh | Active | 28 Sep 2018 |
| 09AABCW9479K1DO | Uttar Pradesh | Active | 11 Oct 2018 |
To see the full GST registrations and return filing status of Powergrid Varanasi Transmission System Limited, buy the company report.
Recent activity
Powergrid Varanasi Transmission System Limited has 53 board changes on record since 2017: 29 appointments and 24 cessations. The latest: Dilip Nagesh Rozekar was appointed as Additional Director on 23 Jan 2026.
44 earlier events are in the company report.
News
Frequently asked questions
Powergrid Varanasi Transmission System is an active public limited union government company based in New Delhi, Delhi, India. The company works in power transmission and distribution services, within the energy and power industry. It was incorporated on 12 January 2017 (9+ years old) and is registered under CIN U40100DL2017GOI310478.
Powergrid Varanasi Transmission System has 5 current directors:
- Dilip Nagesh Rozekar - Additional Director
- Kumud Wadhwa - Director
- Ajaya Kumar Satapathy - Director
- Anand Dubey - Director
- Yugesh Kumar Dixit - Director
The latest financial statements of Powergrid Varanasi Transmission System on record with the MCA are for the year ended 31 March 2025. Its last annual general meeting was held on 26 September 2025. Year-wise statements from FY 2017 are in the company report.
The GSTIN of Powergrid Varanasi Transmission System is 23AABCW9479K1ZP, registered in Madhya Pradesh. The company has 4 GST registrations in all, of which 4 are active. Other active GSTINs include 09AABCW9479K1ZF (Uttar Pradesh), 23AABCW9479K1DY (Madhya Pradesh), 09AABCW9479K1DO (Uttar Pradesh).
The CIN (Corporate Identification Number) of Powergrid Varanasi Transmission System is U40100DL2017GOI310478. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Powergrid Varanasi Transmission System was incorporated on 12 January 2017, making it 9+ years old. It is registered with the Registrar of Companies, Delhi.
Powergrid Varanasi Transmission System has 1 deal on record (1 acquisition); the latest was in March 2018.
The peers of Powergrid Varanasi Transmission System by revenue are Se Solar Limited, Central Transmission Utility of India Limited, NRSS Xxxvi Transmission Limited, Powergrid Meerut Simbhavali Transmission Limited, Gadag Ii-A Transmission Limited, all in the Power industry (Transmission and Distribution), with the same principal business activity (electric power generation, transmission and distribution).
Dilip Nagesh Rozekar was appointed as Additional Director on 23 Jan 2026. Kailash Kumar Gupta ceased to be Director on 21 Jan 2026. Kumud Wadhwa was appointed as Director on 02 Jul 2025. Powergrid Varanasi Transmission System has 53 board changes on record in total.
Powergrid Varanasi Transmission System can be reached through the website powergrid.in. Its registered office is in New Delhi, Delhi, India.
The registered office of Powergrid Varanasi Transmission System is at B – 9 Qutab Institutional Area Katwaria Sarai, New Delhi, Delhi, India – 110016.

