Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems Private Limited - metals and minerals in Kanjikode, Kerala, India. FY 2026 financials & compliance.
CIN U74200KL2013PTC035696 Incorporated 18 December 2013 ROC Ernakulam HQ Kanjikode, Kerala, India
Active Private Limited Company metals and minerals
Data last updated
Revenue · FY 2025
₹14.54 Cr
▲ 18% YoY
Net profit · FY 2025
₹23.34 Lakh
Net margin 1.6%
EBITDA · FY 2025
₹72.71 Lakh
EBITDA margin 5%
Authorised capital
₹60 Lakh
Registered with MCA
Paid-up capital
₹60 Lakh
Issued & subscribed
Open charges
₹2.8 Cr
Secured borrowings
Company age
13 yrs
Est. 2013
Directors on board
3
As per MCA filings

About Prime Pre Engineered Building Systems Private Limited

Data last updated:

Prime Pre Engineered Building Systems Private Limited is a private limited company based in Kanjikode, Kerala, India. It operates in the metal manufacturing and processing segment of the metals and mining sector. It was incorporated on 18 December 2013 and has been in existence for over 13 years.

The company is registered with the Registrar of Companies (ROC), Ernakulam, under CIN U74200KL2013PTC035696. Its GSTIN is 32AAECT8956D1Z9 (Kerala).

The company has an authorised share capital of ₹60 Lakh and a paid-up capital of ₹60 Lakh. It is led by directors including Bindu Chakrampilly Thomas (Managing Director) and Jifri Mulambel Sainudheen.

Its last annual general meeting (AGM) was held on 27 September 2024, and its latest financial statements are for the year ended 31 March 2024. The registered office is at S – 83 Kinfra Integrated Industrial Park Syno509/Ipt 3Pt Kanjikode Industrial Estate, Kerala, India – 678621.

As per the financials filed for FY 2025, the company reported a revenue of ₹14.54 Cr, a growth of 18% compared to the previous year. For the same year it recorded a net profit of ₹23.34 Lakh (net margin 1.6%) and EBITDA of ₹72.71 Lakh (EBITDA margin 5%). Revenue has grown at a compounded annual rate (CAGR) of 9% over three years and 32% over five years.

As per MCA filings, the company has open charges of ₹2.8 Cr on record.

The current compliance status is marked as compliant by the Registrar of Companies.

Company Details of Prime Pre Engineered Building Systems Private Limited
CIN U74200KL2013PTC035696
Registration Number 035696
Incorporation Date 18 December 2013
ROC Ernakulam
Listing Status Unlisted
Company Status Active
Date of Last AGM 27 September 2024
Date of Balance Sheet 31 March 2024
Compliance Status Active Compliant
Contact Details
  • Email
    Locked
  • Telephone
    Locked
  • Website
    Locked
  • Social Media
    Locked
  • Registered Address
    S – 83 Kinfra Integrated Industrial Park Syno509/Ipt 3Pt Kanjikode Industrial Estate, Kerala, India – 678621
  • Industry
    Metals and Minerals, Metal Manufacturing & Processing
Comprehensive company report
Prime Pre Engineered Building Systems Private Limited - one report that includes everything
  • Company details, directors and signatories
  • Historical financials and ratios
  • Shareholding pattern and group structure
  • Charges with holder and property details
  • Legal cases, compliance and MCA filings
  • One PDF report, delivered after checkout
₹799 ₹999 20% off excluding 18% GST
Secure checkout · GST invoice included

Unlock the full Prime Pre Engineered Building Systems Private Limited report

Financials, compliance, directors, charges, ownership and filings for Prime Pre Engineered Building Systems Private Limited in one report.

Financials from 2015 Directors & ownership Charges & compliance

Business Activity of Prime Pre Engineered Building Systems Private Limited

The main business activity of Prime Pre Engineered Building Systems is manufacturing. In detail, this covers metal and metal products.

Main Activity Group CodeDescription of Main ActivityBusiness Activity CodeDescription of Business ActivityTurnover Percentage
CManufacturingC7Metal and metal productsLocked
Premium access

Business activity turnover details

Turnover share and past changes in activity are in the company report.

  • Turnover contribution
  • Historical classifications
  • Filing-level activity changes

Verified entity values are shown only after access is granted.

Financials of Prime Pre Engineered Building Systems Private Limited FY 2024 filings available

Prime Pre Engineered Building Systems Private Limited reported revenue of ₹14.54 Cr (up 18% YoY) for FY 2025.

Revenue · FY 2025
₹14.54 Cr ▲ 18%
Net profit · FY 2025
₹23.34 Lakh margin 1.6%
EBITDA · FY 2025
₹72.71 Lakh margin 5%

Compounded Annual Growth Rate (CAGR) of Prime Pre Engineered Building Systems Private Limited

Revenue CAGR growth
1 year
▲ 18%
3 years · compounded
▲ 9%
5 years · compounded
▲ 32%
EBITDA CAGR growth
1 year
▲ 20%
3 years · compounded
▲ 36%
5 years · compounded
▲ 31%

Revenue has grown at a compounded annual rate (CAGR) of 32% over five years, including 18% growth in the latest year. EBITDA rose 20% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.

Financial Statement Summary of Prime Pre Engineered Building Systems Private Limited

MetricsFY 2024-25FY 2023-24FY 2022-23FY 2021-22FY 2020-21
Profit and Loss Statement
Revenue from Operations••••••••••••••••••••
Other Income••••••••••••••••••••
Total Revenue••••••••••••••••••••
Cost of Materials Consumed••••••••••••••••••••
Employee Benefit Expense••••••••••••••••••••
Finance Costs••••••••••••••••••••
Depreciation and Amortisation••••••••••••••••••••
Other Expenses••••••••••••••••••••
Total Expenses••••••••••••••••••••
EBITDA₹72.71 Lakh••••••••••••••••
Profit Before Tax••••••••••••••••••••
Tax Expense••••••••••••••••••••
Net Profit (PAT)₹23.34 Lakh••••••••••••••••
Balance Sheet
Share Capital••••••••••••••••••••
Reserves and Surplus••••••••••••••••••••
Net Worth (Total Equity)••••••••••••••••••••
Long-term Borrowings••••••••••••••••••••
Short-term Borrowings••••••••••••••••••••
Trade Payables••••••••••••••••••••
Total Liabilities••••••••••••••••••••
Fixed Assets••••••••••••••••••••
Investments••••••••••••••••••••
Inventories••••••••••••••••••••
Trade Receivables••••••••••••••••••••
Cash and Bank Balance••••••••••••••••••••
Total Assets••••••••••••••••••••

Financial Ratios of Prime Pre Engineered Building Systems Private Limited

MetricsFY 2024-25FY 2023-24FY 2022-23FY 2021-22FY 2020-21
Profitability
EBITDA Margin5%••••••••••••••••
Net Profit Margin1.6%••••••••••••••••
Return on Equity (ROE)••••••••••••••••••••
Return on Capital Employed (ROCE)••••••••••••••••••••
Return on Assets (ROA)••••••••••••••••••••
Liquidity and Debt
Current Ratio••••••••••••••••••••
Quick Ratio••••••••••••••••••••
Debt-to-Equity Ratio••••••••••••••••••••
Interest Coverage Ratio••••••••••••••••••••
Efficiency and Growth
Asset Turnover••••••••••••••••••••
Receivable Days••••••••••••••••••••
Payable Days••••••••••••••••••••
Inventory Days••••••••••••••••••••
Revenue Growth••••••••••••••••••••
Net Profit Growth••••••••••••••••••••

Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Prime Pre Engineered Building Systems are in the company report.

Premium access

Financial statements from 2015

Earlier years and trend charts are in the company report.

  • Income statements
  • Balance sheets
  • Cash-flow statements
  • Ratios and benchmarks

Verified entity values are shown only after access is granted.

Peer Comparison of Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems Private Limited is compared with the companies closest to it by revenue in the Metals and Minerals industry (Construction Materials, Metals). Revenue, net profit, margin and growth of each company are in the company report.

CompanyRevenueNet profitMarginGrowth (1 yr)EmployeesLocation
Malwa Concrete Udyog Private Limited••••••••••••••••-Bara Chauraha, Uttar Pradesh, India
M . K . Mineral & Metals Private Limited••••••••••••••••-Howrah, West Bengal, India
Ictl Precoat Panels Private Limited••••••••••••••••18Medak, Telangana, India
Hadid Scaffolding and Aluform Private Limited••••••••••••••••-Pune City, Maharashtra, India
Swastika Structural Products Pvt Ltd••••••••••••••••16Kolkata, West Bengal, India
Prime Pre Engineered Building Systems Private Limited this company••••••••••••••••-Kanjikode, Kerala, India
Mform Technologies Private Limited••••••••••••••••-Delhi, India
Alagar Polytex Private Limited••••••••••••••••-Chidambaranar Dt., Tamil Nadu, India
Bisapa Exim Private Limited••••••••••••••••-Kolkata, West Bengal, India
Panchashil Industries (Nashik) Private Limited••••••••••••••••-Nashik, Maharashtra, India
Corros Metals Private Limited••••••••••••••••-Pune, Maharashtra, India

Peers are the five companies nearest above and the five nearest below Prime Pre Engineered Building Systems by revenue in the Metals and Minerals industry (Construction Materials, Metals), from the latest filed financials of each company. Revenue, net profit, margin and growth of each peer are in the company report.

Auditor Details of Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems Private Limited is audited by DAVY & CO for the financial year 2023.

NameStatusAppointment DateCessation Date
DAVY & COLockedLockedLocked
Premium access

Complete auditor history

Appointment and cessation dates and past auditor changes are in the company report.

  • Appointment status
  • Appointment dates
  • Cessation dates
  • Auditor changes

Verified entity values are shown only after access is granted.

Board of Directors of Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems has 3 current directors and 7 former directors. Current directors are listed first, with their designation and appointment date.

Current Directors
NameDesignationAppointment DateTenureStatus
Jifri Mulambel SainudheenDirector26 Oct 20196 Years 11 MonthsCurrent
Joseph Mathew SankurikalDirector18 Dec 201312 Years 9 MonthsCurrent
Bindu Chakrampilly ThomasManaging Director09 Jun 20224 Years 3 MonthsCurrent

Ownership and Shareholding of Prime Pre Engineered Building Systems Private Limited

Premium access

Shareholding and ownership data

Promoter, institutional, public and beneficial ownership figures are in the company report.

  • Ownership categories
  • Historical changes
  • Group structure
  • FII and DII holdings

Verified entity values are shown only after access is granted.

Charges & Borrowings of Prime Pre Engineered Building Systems Private Limited

Open charges
₹2.8 Cr
Satisfied charges
None
Breakdown by lending institutions
Others₹2.80 Cr
Latest charge details
DateLenderAmountStatus
16 Apr 2025Others₹80 LakhOpen
01 Feb 2023Others₹2 CrOpen

Total charge records: 2 View all charges

Employees and EPFO Compliance at Prime Pre Engineered Building Systems Private Limited

Employment history and EPFO contributions of people linked to Prime Pre Engineered Building Systems.

Premium access

Employee and EPFO history

Monthly headcount, contribution history and filing status are in the company report.

  • Monthly headcount
  • PF contributions
  • ECR filing status
  • Establishment history

Verified entity values are shown only after access is granted.

Recent Activity on Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems Private Limited has 10 board changes on record since 2013: 3 appointments and 7 cessations. The latest: Abuhashim Madathil ceased to be Director on 09 Jun 2022.

Charges
A charge with Others amounted to Rs. 80.00 Lakh with Charge ID 101092902 was registered on 16 Apr 2025.
AGM
Prime Pre Engineered Building Systems Private Limited last Annual general meeting of members was held on 27 Sep 2024 as per latest MCA records.
Filing
Prime Pre Engineered Building Systems Private Limited has filed its annual Financial statements for the year ended 31 Mar 2024 with Roc Ernakulam.
Charges
A charge with Others amounted to Rs. 200.00 Lakh with Charge ID 100681133 was registered on 01 Feb 2023.
Ceased
Abuhashim Madathil ceased to be Director.
Appointed
Bindu Chakrampilly Thomas was appointed as Managing Director.
Ceased
Bindu Chakrampilly Thomas ceased to be Additional Director.
Ceased
Sankurikkal Jacob Mathew ceased to be Director.
Ceased
Jifri Mulambel Sainudheen ceased to be Additional Director.
Ceased
Shajen Cheriyan ceased to be Additional Director.
Appointed
Jifri Mulambel Sainudheen was appointed as Director.
Ceased
Cheruvathur Cheru Rejinold ceased to be Director.

3 earlier events are listed in the company report.

Credit Ratings, Litigation & Regulatory Alerts for Prime Pre Engineered Building Systems Private Limited

Premium access

Credit ratings, litigation, and regulatory alerts

Credit ratings, court records and regulatory alerts are in the company report.

  • Rating history
  • Court and tribunal cases
  • Regulatory alerts
  • Director-linked violations

Verified entity values are shown only after access is granted.

MSME Payment Delays by Prime Pre Engineered Building Systems Private Limited

Premium access

MSME payment history

Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.

  • Outstanding amounts
  • Delay periods and reasons
  • MSME-1 filing history
  • Vendor payment signals

Verified entity values are shown only after access is granted.

Subsidiaries & Group Companies of Prime Pre Engineered Building Systems Private Limited

Premium access

Corporate group structure

Parent, subsidiary, associate and joint venture records with holdings are in the company report.

  • Parent company
  • Subsidiaries and ownership
  • Associates and joint ventures
  • Entity investments

Verified entity values are shown only after access is granted.

GST Compliance of Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems has 1 GST registration: 1 active.

Total GSTINs
1
Active
1
GSTINStateStatusRegistered on
32AAECT8956D1Z9KeralaActive01 Jul 2017
Premium access

GST registrations and filing compliance

State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.

  • GSTIN registrations
  • State-wise filing status
  • HSN and SAC details
  • Tax jurisdiction records

Verified entity values are shown only after access is granted.

MCA Filings & Documents of Prime Pre Engineered Building Systems Private Limited

Premium access

MCA filings and documents

Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.

  • Incorporation documents
  • Annual returns and statements
  • Charge filings
  • Complete filing index

Verified entity values are shown only after access is granted.

Frequently Asked Questions about Prime Pre Engineered Building Systems Private Limited

Prime Pre Engineered Building Systems is an active private limited company based in Kanjikode, Kerala, India. The company works in metal manufacturing and processing, within the metals and minerals industry. It was incorporated on 18 December 2013 (13+ years old) and is registered under CIN U74200KL2013PTC035696.

Prime Pre Engineered Building Systems reported revenue of ₹14.54 Cr for FY 2025 (up 18% YoY).

Prime Pre Engineered Building Systems has 3 current directors:

Prime Pre Engineered Building Systems reported a net profit of ₹23.34 Lakh (net margin 1.6%) and EBITDA of ₹72.71 Lakh (EBITDA margin 5%) for FY 2025, as per its filed financial statements.

The compounded annual growth rate (CAGR) of the revenue of Prime Pre Engineered Building Systems is 9% over three years and 32% over five years. In the latest year (FY 2025) revenue rose 18%. CAGR is the steady yearly rate that links the first and the last year.

The GSTIN of Prime Pre Engineered Building Systems is 32AAECT8956D1Z9, registered in Kerala.

The CIN (Corporate Identification Number) of Prime Pre Engineered Building Systems is U74200KL2013PTC035696. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.

Prime Pre Engineered Building Systems was incorporated on 18 December 2013, making it 13+ years old. It is registered with the Registrar of Companies, Ernakulam.

The peers of Prime Pre Engineered Building Systems by revenue are Malwa Concrete Udyog Private Limited, M . K . Mineral & Metals Private Limited, Ictl Precoat Panels Private Limited, Hadid Scaffolding and Aluform Private Limited, Swastika Structural Products Pvt Ltd and 5 more, all in the Metals and Minerals industry (Construction Materials, Metals).

Abuhashim Madathil ceased to be Director on 09 Jun 2022. Bindu Chakrampilly Thomas was appointed as Managing Director on 09 Jun 2022. Bindu Chakrampilly Thomas ceased to be Additional Director on 09 Jun 2022. Prime Pre Engineered Building Systems has 10 board changes on record in total.

The registered office of Prime Pre Engineered Building Systems is at S – 83 Kinfra Integrated Industrial Park Syno509Ipt 3Pt Kanjikode Industrial Estate, Kerala, India – 678621.

7M+ Indian companies. One platform.

Financials, directors, compliance, charges and shareholding - compiled from official filings and updated regularly.

Subscription plans available