
Rhomboid Engineering Private Limited
CIN: U29266GJ2013PTC076311Ahmedabad, Gujarat, India
About Rhomboid Engineering Private Limited
Data last updated:
Rhomboid Engineering Private Limited is a private limited company based in Ahmedabad, Gujarat, India. It operates in the engineering design segment of the engineering sector. It was incorporated on 05 August 2013 and has been in existence for over 13 years.
The company is registered with the Registrar of Companies (ROC), Ahmedabad, under CIN U29266GJ2013PTC076311. Its GSTIN is 24AAGCR5459P1ZP (Gujarat). The company has an authorised share capital of ₹1 Lakh and a paid-up capital of ₹1 Lakh. It has 2 current directors: Parthiv Suryakantbhai Patel and Radhi Parthiv Patel.
As per the financials filed for FY 2025, the company reported a revenue of ₹1.89 Cr, a decline of 37% compared to the previous year. It closed the year with a net profit.
Company details
- MCA compliance: Active Compliant
- Private Limited Company
- Registration number 076311
- Incorporated 05 August 2013
- Authorised capital ₹1 Lakh
- Turnover up to ₹10 crore
- Revenue ₹1.89 Cr in FY 2025
- Company limited by shares
- Non-government company
- Class: Private
- Business activity, as per the annual return of FY 2024: Architecture, engineering activities, technical testing and analysis activities
Contact details
Rhomboid Engineering Private Limited's registered office is in Ahmedabad, Gujarat.
- Email
- Registered AddressHARI VALLABH NR POLYTECHNIC AMBAWADI, Ahmedabad, Gujarat, India – 380009
- City: Ahmedabad
- State: Gujarat
- PIN Code: 380009
- Financial statements and ratios, year by year
- Directors, KMP and signatories
- Shareholding and group structure
- Charges, legal cases and credit ratings
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Business activity
The main business activity of Rhomboid Engineering is professional, scientific and technical. In detail, this covers architecture, engineering activities, technical testing and analysis activities.
| Main activity group code | Main activity | Business activity code | Business activity | Share of turnover |
|---|---|---|---|---|
| M | Professional, Scientific and Technical | M4 | Architecture, engineering activities, technical testing and analysis activities |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Rhomboid Engineering Private Limited
FY 2025 filings availableRhomboid Engineering Private Limited reported revenue of ₹1.89 Cr (down 37% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR)
Revenue has declined at a compounded annual rate (CAGR) of 2% over five years, including a 37% fall in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Summary
The latest five years are shown here. The company report carries every year filed since 2015.
| Summary | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Revenue | 1.89 Cr | ||||
| EBITDA | |||||
| EBITDA Margin | |||||
| Profit After Tax | |||||
| PAT Margin | |||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since 2015, up to FY 2024-25. The latest four years are previewed here. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | ||||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Liquidity ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since 2015
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Rhomboid Engineering Private Limited
Rhomboid Engineering has 2 directors on record.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Parthiv Suryakantbhai Patel | Director | 05 Aug 2013 | 13 yrs 3 mos | Current |
| Radhi Parthiv Patel | Director | 05 Aug 2013 | 13 yrs 3 mos | Current |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Rhomboid Engineering Private Limited is compared with the 10 companies closest to it by revenue in the Engineering industry (Engineering Design), with the same principal business activity (architecture, engineering activities, technical testing and analysis activities), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Inroad Techno Consultants Private Limited | ₹1.93 Cr FY 2024 | -19.0% | Bengaluru, Karnataka, India | |||
| M G Engineering Systems Pvt Ltd | ₹1.93 Cr FY 2025 | 68.0% | Vadodara, Gujarat, India | |||
| Bildx Technologies Private Limited | ₹1.92 Cr FY 2025 | 420.0% | Ernakulam, Kerala, India | |||
| Design Well (India) Private Limited | ₹1.92 Cr FY 2023 | 0.0% | New Delhi, Delhi, India | |||
| Rush PCB India Private Limited | ₹1.92 Cr FY 2024 | 184.0% | Mumbai, Maharashtra, India | |||
| Argi Design and Engineering Private Limited | ₹1.9 Cr FY 2023 | 197.0% | Bengaluru, Karnataka, India | |||
| Rhomboid Engineering Private Limitedthis company | ₹1.89 Cr FY 2025 | -37.0% | Ahmedabad, Gujarat, India | |||
| Struframe Solutions Private Limited | ₹1.89 Cr FY 2023 | 44.0% | Bengaluru, Karnataka, India | |||
| Thyron Engineering Private Limited | ₹1.89 Cr FY 2020 | 47.0% | Mumbai, Maharashtra, India | |||
| Agartha Project Consultancy Services Private Limited | ₹1.87 Cr FY 2025 | -6.0% | Agartala, Tripura, India | |||
| Atit Admulwar Planners (OPC) Private Limited | ₹1.86 Cr FY 2024 | 60.0% | Pune, Maharashtra, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Auditor
The statutory auditor of Rhomboid Engineering Private Limited is SURESH R SHAH & ASSOCIATES (firm registration number 110691W), as per its latest filing for the financial year 2021.
- The statutory auditor of every financial year filed since 2015
- Audit firm, signing partner, membership number and firm registration number
- Whether each year's audit report was qualified, with the auditors' remarks
- Whether CARO applied, and the CARO remarks
- Auditor resignations, where one was filed
Shareholding
The shareholding of Rhomboid Engineering Private Limited is on record for 4 financial years, from FY 2016 to FY 2021, split between promoters, domestic institutions, foreign institutions, public shareholders and others.
| Shareholder category | FY 2021 | FY 2019 | FY 2017 | FY 2016 |
|---|---|---|---|---|
| Promoters | ||||
| Domestic institutional investors (DII) | ||||
| Foreign institutional investors (FII) | ||||
| Public | ||||
| Others |
- Promoter and public holding for every financial year
- Number of shares and percentage, category by category
- Shares held by each director and KMP
- Share transfers with transferor, transferee and number of shares
GST
Rhomboid Engineering has 1 GST registration: 1 active.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 24AAGCR5459P1ZP | Gujarat | Active | 01 Jul 2017 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Rhomboid Engineering Private Limited has 2 board changes on record since 2013: 2 appointments. The latest: Parthiv Suryakantbhai Patel was appointed as Director on 05 Aug 2013.
| Date | Type | Event |
|---|---|---|
| 1 year 1 month ago | AGM | Rhomboid Engineering Private Limited last Annual general meeting of members was held on 30 Sep 2025 as per latest MCA records. |
| 1 year 7 months ago | Filing | Rhomboid Engineering Private Limited has filed its annual Financial statements for the year ended 31 Mar 2025 with ROC Ahmedabad. |
| 13 years ago | Appointed | Parthiv Suryakantbhai Patel was appointed as Director. |
| 13 years ago | Appointed | Radhi Parthiv Patel was appointed as Director. |
| 05 Aug 2013 | Incorporation | Rhomboid Engineering Private Limited was registered on 05 Aug 2013 with ROC Ahmedabad & aged 13 years 3 months as per MCA records. |
Also available in the company report of Rhomboid Engineering Private Limited
Legal cases
- Court and tribunal cases, with case number, court and year
- Parties to each case and its status
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Rhomboid Engineering is an active private limited company based in Ahmedabad, Gujarat, India. The company works in engineering design, within the engineering industry. It was incorporated on 05 August 2013 (13+ years old) and is registered under CIN U29266GJ2013PTC076311.
Rhomboid Engineering has 2 current directors:
- Parthiv Suryakantbhai Patel - Director
- Radhi Parthiv Patel - Director
The latest financial statements of Rhomboid Engineering on record with the MCA are for the year ended 31 March 2025. Its last annual general meeting was held on 30 September 2025. Year-wise statements from 2015 are in the company report.
The GSTIN of Rhomboid Engineering is 24AAGCR5459P1ZP, registered in Gujarat.
The CIN (Corporate Identification Number) of Rhomboid Engineering is U29266GJ2013PTC076311. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Rhomboid Engineering was incorporated on 05 August 2013, making it 13+ years old. It is registered with the Registrar of Companies, Ahmedabad.
The peers of Rhomboid Engineering by revenue are Inroad Techno Consultants Private Limited, M G Engineering Systems Pvt Ltd, Bildx Technologies Private Limited, Design Well (India) Private Limited, Rush PCB India Private Limited and 5 more, all in the Engineering industry (Engineering Design), with the same principal business activity (architecture, engineering activities, technical testing and analysis activities).
Parthiv Suryakantbhai Patel was appointed as Director on 05 Aug 2013. Radhi Parthiv Patel was appointed as Director on 05 Aug 2013.
The registered office of Rhomboid Engineering is at HARI VALLABH NR POLYTECHNIC AMBAWADI, Ahmedabad, Gujarat, India – 380009.
Rhomboid Engineering operates in the engineering industry, in the engineering design segment.
Rhomboid Engineering is marked "ACTIVE compliant" in MCA records as of 13 November 2026. This means it has filed e-form INC-22A (ACTIVE), which confirms its registered office. The latest financial statements on record are for the year ended 31 March 2025.

