
About Shekar Engineering Works Private Limited
Data last updated:
Shekar Engineering Works Private Limited is a private limited company based in Bangalore, Karnataka, India. It operates in the die casting and metal forming segment of the manufacturing sector. It was incorporated on 07 March 2005 and has been in existence for over 21 years.
The company is registered with the Registrar of Companies (ROC), Bangalore, under CIN U27101KA2005PTC035770. Its GSTIN is 29AAICS8473J1ZK (Karnataka). The company holds 2 GST registrations, of which 1 is active.
The company has an authorised share capital of ₹5.5 Cr and a paid-up capital of ₹5.21 Cr. It is led by directors Yashodha Subbegowda (Managing Director) and Bangalore Gopinath Nalini.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at No 46 – A Sompura 1st Stage Industrial Area Sompura Hobli Thyamagondlu Nelamangala, Bangalore, Karnataka, India – 562132.
As per the financials filed for FY 2025, the company reported a revenue of ₹1.79 Cr, reflecting significant growth compared to the previous year. For the same year it recorded a net profit of ₹1.35 Cr (net margin 75.9%) and EBITDA of ₹1.63 Cr (EBITDA margin 91.5%). Revenue has declined at a compounded annual rate (CAGR) of 13% over three years and 25% over five years.
The company has about 23 employees on its provident fund (EPFO) records.
As per MCA filings, the company has satisfied charges of ₹7.22 Cr on record. Court records list 39 cases involving the company, including 39 filed against it.
The current compliance status is marked as compliant by the Registrar of Companies. For more details, the company can be reached via its website shekarengineering.com.
- EmailLocked
- TelephoneLocked
- Website
- Social MediaLocked
- Registered AddressNo 46 – A Sompura 1st Stage Industrial Area Sompura Hobli Thyamagondlu Nelamangala, Bangalore, Karnataka, India – 562132
- IndustryManufacturing, Die Casting & Metal Forming
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of Shekar Engineering Works Private Limited
The main business activity of Shekar Engineering Works is manufacturing. In detail, this covers metal and metal products.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| C | Manufacturing | C7 | Metal and metal products | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Shekar Engineering Works Private Limited FY 2025 filings available
Shekar Engineering Works Private Limited reported revenue of ₹1.79 Cr (up 159% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR) of Shekar Engineering Works Private Limited
Revenue rose 159% in the latest year, though over five years it has declined at a compounded annual rate (CAGR) of 25%. EBITDA rose 281% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of Shekar Engineering Works Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹1.63 Cr | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | ₹1.35 Cr | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of Shekar Engineering Works Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 91.5% | •••• | •••• | •••• | •••• |
| Net Profit Margin | 75.9% | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Shekar Engineering Works are in the company report.
Financial statements from 2015
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of Shekar Engineering Works Private Limited
Shekar Engineering Works Private Limited is compared with the companies closest to it by revenue in the same principal business activity (Metal and metal products). Revenue, net profit, margin and growth of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Guts International Private Limited | •••• | •••• | •••• | •••• | - | Palakkad, Kerala, India |
| Lishika N Private Limited | •••• | •••• | •••• | •••• | - | Nelamangala, Karnataka, India |
| Kiran Technocast Private Limited | •••• | •••• | •••• | •••• | - | Rajkot, Gujarat, India |
| Vansh Homes Appliances Private Limited | •••• | •••• | •••• | •••• | - | Greater Noida, Uttar Pradesh, India |
| Dagger Die Cutting (India) Private Limited | •••• | •••• | •••• | •••• | - | Chennai, Tamil Nadu, India |
| Shekar Engineering Works Private Limited this company | •••• | •••• | •••• | •••• | - | Bangalore, Karnataka, India |
| Tirupati Components Private Limited | •••• | •••• | •••• | •••• | - | Kolkata, West Bengal, India |
| Surya Hard Chrome Private Limited | •••• | •••• | •••• | •••• | - | Bangalore, Karnataka, India |
| PDT Engineering Private Limited | •••• | •••• | •••• | •••• | - | Vadodara, Gujarat, India |
| Star Metal Forms Private Limited | •••• | •••• | •••• | •••• | - | Mumbai, Maharashtra, India |
| Ratnaleksshmi Precision Tools Private Limited | •••• | •••• | •••• | •••• | - | Hosur, Tamil Nadu, India |
Peers are the five companies nearest above and the five nearest below Shekar Engineering Works by revenue in the same principal business activity (Metal and metal products), from the latest filed financials of each company. Revenue, net profit, margin and growth of each peer are in the company report.
Auditor Details of Shekar Engineering Works Private Limited
Shekar Engineering Works Private Limited is audited by M P M & ASSOCIATES for the financial year 2023.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| M P M & ASSOCIATES | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Board of Directors of Shekar Engineering Works Private Limited
Shekar Engineering Works has 2 current directors and 1 former director. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Yashodha Subbegowda Also directs: Shekar Engineering Works LLP | Managing Director | 07 Mar 2005 | 21 Years 7 Months | Current |
| Bangalore Gopinath Nalini Also directs: Shekar Engineering Works LLP | Director | 07 Mar 2005 | 21 Years 7 Months | Current |
Ownership and Shareholding of Shekar Engineering Works Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Shekar Engineering Works Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 14 May 2019 | Others | ₹1.73 Cr | Satisfied |
| 08 May 2019 | Others | ₹64 Lakh | Satisfied |
| 23 Mar 2016 | Vijaya Bank | ₹2.4 Cr | Satisfied |
| 15 Mar 2006 | Vijaya Bank | ₹2.45 Cr | Satisfied |
Total charge records: 4 View all charges
Legal Cases of Shekar Engineering Works Private Limited
Shekar Engineering Works Private Limited has 39 court cases on record: 39 filed against it. All cases are disposed. Status as checked between 21 Sep 2026 and 03 Oct 2026.
Cases by court
| Court | Cases | Against the company | Pending |
|---|---|---|---|
| District courts | 39 | 39 | 0 |
Cases on record (5 of 39)
| Court | Type of case | Party | Status |
|---|---|---|---|
| District court, BENGALURU RURAL, Karnataka | Court case (ID) | Filed against the company by an individual | Disposed |
| District court, BENGALURU RURAL, Karnataka | Court case (ID) | Filed against the company by an individual | Disposed |
| District court, BENGALURU RURAL, Karnataka | Court case (ID) | Filed against the company by an individual | Disposed |
| District court, BENGALURU RURAL, Karnataka | Court case (ID) | Filed against the company by an individual | Disposed |
| District court, BENGALURU RURAL, Karnataka | Court case (ID) | Filed against the company by an individual | Disposed |
Full case history
All 39 cases with case numbers, court, year-wise trend, opposite parties and decision dates are in the company report.
- Every case with its case number
- Year-wise trend
- Opposite parties
- Decision dates and orders
Verified entity values are shown only after access is granted.
Case records are compiled from court listings and may lag the court's own records. A case filed against a company is not a finding against it.
MSME Payment Delays by Shekar Engineering Works Private Limited
Shekar Engineering Works Private Limited has 1 MSME Form 1 return on record for the period ending Mar 2019, listing 5 overdue payments to 3 micro and small suppliers. Companies must report dues to micro and small suppliers that stay unpaid for more than 45 days in a half-yearly MSME Form 1 return.
Suppliers with reported dues (3 of 3)
| Supplier | Amount due | Due since | Reported on |
|---|---|---|---|
| an individual supplier | •••• | •••• | •••• |
| Kiran Global Chems Limited | •••• | •••• | •••• |
| Gargi Huttenes Albertus Private Limited | •••• | •••• | •••• |
Full MSME payment history
Every supplier, amount and due date from all 1 MSME Form 1 returns is in the company report.
- Every reported supplier due
- Amounts and due dates
- Reasons given in each return
- Period-by-period history
Verified entity values are shown only after access is granted.
Individuals and sole proprietors among the suppliers are not named. Amounts, due dates and filing dates are in the company report.
Employees and EPFO Compliance at Shekar Engineering Works Private Limited
Shekar Engineering Works Private Limited has a workforce of 23 employees as of Mar 28, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on Shekar Engineering Works Private Limited
Shekar Engineering Works Private Limited has 2 board changes on record since 2005: 2 appointments. The latest: Bangalore Gopinath Nalini was appointed as Director on 07 Mar 2005.
1 earlier event is listed in the company report.
Credit Ratings, Litigation & Regulatory Alerts for Shekar Engineering Works Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Shekar Engineering Works Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Shekar Engineering Works Private Limited
Shekar Engineering Works has 2 GST registrations: 1 active and 1 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 29AAICS8473J1ZK | Karnataka | Active | 01 Jul 2017 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Shekar Engineering Works Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Shekar Engineering Works Private Limited
Shekar Engineering Works is an active private limited company based in Bangalore, Karnataka, India. The company works in die casting and metal forming, within the manufacturing industry. It was incorporated on 07 March 2005 (21+ years old) and is registered under CIN U27101KA2005PTC035770.
Shekar Engineering Works reported revenue of ₹1.79 Cr for FY 2025 (up 159% YoY).
Shekar Engineering Works has 2 current directors:
- Yashodha Subbegowda - Managing Director
- Bangalore Gopinath Nalini - Director
Shekar Engineering Works reported a net profit of ₹1.35 Cr (net margin 75.9%) and EBITDA of ₹1.63 Cr (EBITDA margin 91.5%) for FY 2025, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of Shekar Engineering Works is 13% over three years and -25% over five years. In the latest year (FY 2025) revenue rose 159%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of Shekar Engineering Works is 29AAICS8473J1ZK, registered in Karnataka. The company has 2 GST registrations in all, of which 1 is active and 1 is cancelled or inactive.
The CIN (Corporate Identification Number) of Shekar Engineering Works is U27101KA2005PTC035770. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Shekar Engineering Works has 39 court cases on record: 39 filed against it.
Shekar Engineering Works was incorporated on 07 March 2005, making it 21+ years old. It is registered with the Registrar of Companies, Bangalore.
The peers of Shekar Engineering Works by revenue are Guts International Private Limited, Lishika N Private Limited, Kiran Technocast Private Limited, Vansh Homes Appliances Private Limited, Dagger Die Cutting (India) Private Limited and 5 more, all in the same principal business activity (Metal and metal products).
Bangalore Gopinath Nalini was appointed as Director on 07 Mar 2005. Yashodha Subbegowda was appointed as Managing Director on 07 Mar 2005.
Shekar Engineering Works has 1 MSME Form 1 return on record for the period ending Mar 2019, listing 5 overdue payments to 3 micro and small suppliers. The latest return was filed on 08 Jun 2019.