
Terabuilt Electrical & Construction Private Limited
About Terabuilt Electrical & Construction Private Limited
Data last updated:
Terabuilt Electrical & Construction Private Limited is a private limited company based in Bengaluru, Karnataka, India. It operates in the bop and btg services segment of the energy and power sector. It was incorporated on 20 October 2022.
The company is registered with the Registrar of Companies (ROC), Bangalore, under CIN U45500KA2022PTC167278. Its GSTIN is 29AAJCT7435N2ZH (Karnataka). The company holds 2 GST registrations, of which 1 is active.
The company has an authorised share capital of ₹1 Lakh and a paid-up capital of ₹1 Lakh. It is led by directors Amith Balaram and Mudde Gowda Varush.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at No.30 1st Floor 9th A Main Road 5th Block Jayanagar, Bengaluru, Karnataka, India – 560041.
As per the financials filed for FY 2025, the company reported a revenue of ₹60.95 Lakh. For the same year it recorded a net profit of ₹2 Lakh (net margin 3.3%) and EBITDA of ₹2 Lakh (EBITDA margin 3.3%).
As per MCA filings, the company has open charges of ₹11 Lakh on record.
- EmailLocked
- TelephoneLocked
- WebsiteLocked
- Social MediaLocked
- Registered AddressNo.30 1st Floor 9th A Main Road 5th Block Jayanagar, Bengaluru, Karnataka, India – 560041
- IndustryEnergy and Power, BoP & BTG Services, Power EPC
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Financials of Terabuilt Electrical & Construction Private Limited FY 2025 filings available
Terabuilt Electrical & Construction Private Limited reported revenue of ₹60.95 Lakh for FY 2025.
Financial Statement Summary of Terabuilt Electrical & Construction Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|
| Profit and Loss Statement | |||
| Revenue from Operations | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• |
| EBITDA | ₹2 Lakh | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• |
| Net Profit (PAT) | ₹2 Lakh | •••• | •••• |
| Balance Sheet | |||
| Share Capital | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• |
Financial Ratios of Terabuilt Electrical & Construction Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|
| Profitability | |||
| EBITDA Margin | 3.3% | •••• | •••• |
| Net Profit Margin | 3.3% | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• |
| Liquidity and Debt | |||
| Current Ratio | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• |
| Efficiency and Growth | |||
| Asset Turnover | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Terabuilt Electrical & Construction are in the company report.
Financial statements from FY 2023
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction Private Limited is compared with the companies closest to it by revenue in the Real Estate industry (Builders and Developers). Net profit, margin and employee counts of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Udbhav Projects Private Limited | ₹60.98 Lakh (FY 2025) | •••• | •••• | -69.0% | •••• | Hyderabad, Telangana, India |
| Nuvaan Buildtech Private Limited | ₹60.97 Lakh (FY 2025) | •••• | •••• | 7.0% | •••• | New Delhi, Delhi, India |
| LPF Systems Private Limited | ₹60.97 Lakh (FY 2025) | •••• | •••• | -98.0% | •••• | Hyderabad, Telangana, India |
| SKDK Developers Private Limited | ₹60.96 Lakh (FY 2025) | •••• | •••• | 0.0% | •••• | Kanpur, Uttar Pradesh, India |
| Abhilashini Realcon Private Limited | ₹60.95 Lakh (FY 2023) | •••• | •••• | -80.0% | •••• | Kolkata, West Bengal, India |
| Terabuilt Electrical & Construction Private Limited this company | ₹60.95 Lakh (FY 2025) | •••• | •••• | •••• | Bengaluru, Karnataka, India | |
| Sathi Nirman Private Limited | ₹60.94 Lakh (FY 2024) | •••• | •••• | -19.0% | •••• | Muzaffarpur, Bihar, India |
| Upplate India Private Limited | ₹60.92 Lakh (FY 2025) | •••• | •••• | •••• | Gurgaon, Haryana, India | |
| Arpana Tie Up Private Limited | ₹60.91 Lakh (FY 2025) | •••• | •••• | 304452.0% | •••• | Kolkata, West Bengal, India |
| Anupam Advertising Private Limited | ₹60.9 Lakh (FY 2025) | •••• | •••• | 26.0% | •••• | Secunderabad, Telangana, India |
| Rashleela Buildcon Private Limited | ₹60.9 Lakh (FY 2022) | •••• | •••• | -1.0% | •••• | Bhopal, Madhya Pradesh, India |
Peers are the five companies nearest above and the five nearest below Terabuilt Electrical & Construction by revenue in the Real Estate industry (Builders and Developers), from the latest filed financials of each company. Net profit, margin and employee counts of each peer are in the company report.
Auditor Details of Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction Private Limited is audited by NAGA&Associates for the financial year 2023.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| NAGA&Associates | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Board of Directors of Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction has 2 current directors and 1 former director. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Mudde Gowda Varush | Additional Director | 31 May 2024 | 2 Years 4 Months | Current |
| Amith Balaram Also directs: Sri Krishna Solar Energy LLP | Director | 20 Oct 2022 | 3 Years 11 Months | Current |
Ownership and Shareholding of Terabuilt Electrical & Construction Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Terabuilt Electrical & Construction Private Limited
| Date | Lender | Amount | Status |
|---|---|---|---|
| 10 Mar 2023 | Hdfc Bank Limited | ₹11 Lakh | Open |
Total charge records: 1 View all charges
Employees and EPFO Compliance at Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction Private Limited has a workforce of 0 employees as of Apr 08, 2024.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction Private Limited has 3 board changes on record since 2022: 2 appointments and 1 cessation. The latest: Balaram Gujjanadu Venkatesh ceased to be Director on 08 Jun 2024.
Credit Ratings, Litigation & Regulatory Alerts for Terabuilt Electrical & Construction Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by Terabuilt Electrical & Construction Private Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Terabuilt Electrical & Construction Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction has 2 GST registrations: 1 active and 1 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 29AAJCT7435N2ZH | Karnataka | Active | 25 Jul 2024 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Terabuilt Electrical & Construction Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Terabuilt Electrical & Construction Private Limited
Terabuilt Electrical & Construction is an active private limited company based in Bengaluru, Karnataka, India. The company works in bop and btg services, within the energy and power industry. It was incorporated on 20 October 2022 (4+ years old) and is registered under CIN U45500KA2022PTC167278.
Terabuilt Electrical & Construction reported revenue of ₹60.95 Lakh for FY 2025.
Terabuilt Electrical & Construction has 2 current directors:
- Mudde Gowda Varush - Additional Director
- Amith Balaram - Director
Terabuilt Electrical & Construction reported a net profit of ₹2 Lakh (net margin 3.3%) and EBITDA of ₹2 Lakh (EBITDA margin 3.3%) for FY 2025, as per its filed financial statements.
The GSTIN of Terabuilt Electrical & Construction is 29AAJCT7435N2ZH, registered in Karnataka. The company has 2 GST registrations in all, of which 1 is active and 1 is cancelled or inactive.
The CIN (Corporate Identification Number) of Terabuilt Electrical & Construction is U45500KA2022PTC167278. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Terabuilt Electrical & Construction was incorporated on 20 October 2022, making it 4+ years old. It is registered with the Registrar of Companies, Bangalore.
The peers of Terabuilt Electrical & Construction by revenue are Udbhav Projects Private Limited, Nuvaan Buildtech Private Limited, LPF Systems Private Limited, SKDK Developers Private Limited, Abhilashini Realcon Private Limited and 5 more, all in the Real Estate industry (Builders and Developers).
Balaram Gujjanadu Venkatesh ceased to be Director on 08 Jun 2024. Mudde Gowda Varush was appointed as Additional Director on 31 May 2024. Amith Balaram was appointed as Director on 20 Oct 2022.
The registered office of Terabuilt Electrical & Construction is at No.30 1st Floor 9th A Main Road 5th Block Jayanagar, Bengaluru, Karnataka, India – 560041.
Terabuilt Electrical & Construction has an authorised share capital of ₹1 Lakh and a paid-up capital of ₹1 Lakh.