
Trupti Power Projects Private Limited
About Trupti Power Projects Private Limited
Data last updated:
Trupti Power Projects Private Limited is a private limited company based in Nashik, Maharashtra, India. It operates in the power equipment manufacturers segment of the energy and power sector. It was incorporated on 17 July 2007 and has been in existence for over 19 years.
The company is registered with the Registrar of Companies (ROC), Mumbai, under CIN U45207MH2007PTC172441. Its GSTIN is 27AACCT7479F1ZY (Maharashtra). The company holds 2 GST registrations, of which 1 is active.
The company has an authorised share capital of ₹1.3 Cr and a paid-up capital of ₹1.27 Cr. It is led by directors Ranjana Babanrao Chaure and Baban Bhagwant Chaure.
Its last annual general meeting (AGM) was held on 30 September 2025, and its latest financial statements are for the year ended 31 March 2025. The registered office is at C – 11/30 Nice MIDC Area Satpur, Nashik, Maharashtra, India – 422007.
As per the financials filed for FY 2025, the company reported a revenue of ₹14.69 Lakh, a growth of 4% compared to the previous year. For the same year it recorded EBITDA of ₹4.96 Lakh (EBITDA margin 33.8%). Revenue has grown at a compounded annual rate (CAGR) of 41% over three years and 3% over five years.
The current compliance status is marked as compliant by the Registrar of Companies.
- EmailLocked
- TelephoneLocked
- WebsiteLocked
- Social MediaLocked
- Registered AddressC – 11/30 Nice MIDC Area Satpur, Nashik, Maharashtra, India – 422007
- IndustryEnergy and Power, Power Equipment Manufacturers
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
- One PDF report, delivered after checkout
Business Activity of Trupti Power Projects Private Limited
The main business activity of Trupti Power Projects is manufacturing. In detail, this covers electrical equipment, general purpose and special purpose machinery & equipment, transport equipment.
| Main Activity Group Code | Description of Main Activity | Business Activity Code | Description of Business Activity | Turnover Percentage |
|---|---|---|---|---|
| C | Manufacturing | C10 | Electrical equipment, General Purpose and Special purpose Machinery & equipment, Transport equipment | Locked |
Business activity turnover details
Turnover share and past changes in activity are in the company report.
- Turnover contribution
- Historical classifications
- Filing-level activity changes
Verified entity values are shown only after access is granted.
Financials of Trupti Power Projects Private Limited FY 2025 filings available
Trupti Power Projects Private Limited reported revenue of ₹14.69 Lakh (up 4% YoY) for FY 2025.
Compounded Annual Growth Rate (CAGR) of Trupti Power Projects Private Limited
Revenue has grown at a compounded annual rate (CAGR) of 3% over five years, including 4% growth in the latest year. EBITDA fell 45% in the latest year. Three- and five-year figures are compounded annual growth rates (CAGR): the steady yearly rate that links the first and the last year. All are worked out from the filed statements.
Financial Statement Summary of Trupti Power Projects Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profit and Loss Statement | |||||
| Revenue from Operations | •••• | •••• | •••• | •••• | •••• |
| Other Income | •••• | •••• | •••• | •••• | •••• |
| Total Revenue | •••• | •••• | •••• | •••• | •••• |
| Cost of Materials Consumed | •••• | •••• | •••• | •••• | •••• |
| Employee Benefit Expense | •••• | •••• | •••• | •••• | •••• |
| Finance Costs | •••• | •••• | •••• | •••• | •••• |
| Depreciation and Amortisation | •••• | •••• | •••• | •••• | •••• |
| Other Expenses | •••• | •••• | •••• | •••• | •••• |
| Total Expenses | •••• | •••• | •••• | •••• | •••• |
| EBITDA | ₹4.96 Lakh | •••• | •••• | •••• | •••• |
| Profit Before Tax | •••• | •••• | •••• | •••• | •••• |
| Tax Expense | •••• | •••• | •••• | •••• | •••• |
| Net Profit (PAT) | •••• | •••• | •••• | •••• | •••• |
| Balance Sheet | |||||
| Share Capital | •••• | •••• | •••• | •••• | •••• |
| Reserves and Surplus | •••• | •••• | •••• | •••• | •••• |
| Net Worth (Total Equity) | •••• | •••• | •••• | •••• | •••• |
| Long-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Short-term Borrowings | •••• | •••• | •••• | •••• | •••• |
| Trade Payables | •••• | •••• | •••• | •••• | •••• |
| Total Liabilities | •••• | •••• | •••• | •••• | •••• |
| Fixed Assets | •••• | •••• | •••• | •••• | •••• |
| Investments | •••• | •••• | •••• | •••• | •••• |
| Inventories | •••• | •••• | •••• | •••• | •••• |
| Trade Receivables | •••• | •••• | •••• | •••• | •••• |
| Cash and Bank Balance | •••• | •••• | •••• | •••• | •••• |
| Total Assets | •••• | •••• | •••• | •••• | •••• |
Financial Ratios of Trupti Power Projects Private Limited
| Metrics | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 | FY 2020-21 |
|---|---|---|---|---|---|
| Profitability | |||||
| EBITDA Margin | 33.8% | •••• | •••• | •••• | •••• |
| Net Profit Margin | •••• | •••• | •••• | •••• | •••• |
| Return on Equity (ROE) | •••• | •••• | •••• | •••• | •••• |
| Return on Capital Employed (ROCE) | •••• | •••• | •••• | •••• | •••• |
| Return on Assets (ROA) | •••• | •••• | •••• | •••• | •••• |
| Liquidity and Debt | |||||
| Current Ratio | •••• | •••• | •••• | •••• | •••• |
| Quick Ratio | •••• | •••• | •••• | •••• | •••• |
| Debt-to-Equity Ratio | •••• | •••• | •••• | •••• | •••• |
| Interest Coverage Ratio | •••• | •••• | •••• | •••• | •••• |
| Efficiency and Growth | |||||
| Asset Turnover | •••• | •••• | •••• | •••• | •••• |
| Receivable Days | •••• | •••• | •••• | •••• | •••• |
| Payable Days | •••• | •••• | •••• | •••• | •••• |
| Inventory Days | •••• | •••• | •••• | •••• | •••• |
| Revenue Growth | •••• | •••• | •••• | •••• | •••• |
| Net Profit Growth | •••• | •••• | •••• | •••• | •••• |
Paid data: the figures shown as dots are available after purchase of the company report. Figures as filed with the MCA in Form AOC-4. The full year-wise statements and ratios of Trupti Power Projects are in the company report.
Financial statements from 2015
Earlier years and trend charts are in the company report.
- Income statements
- Balance sheets
- Cash-flow statements
- Ratios and benchmarks
Verified entity values are shown only after access is granted.
Peer Comparison of Trupti Power Projects Private Limited
Trupti Power Projects Private Limited is compared with the companies closest to it by revenue in the Power industry (Power Equipment Manufacturers, Power Projects). Revenue, net profit, margin and growth of each company are in the company report.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Bagahan Energy Private Limited | •••• | •••• | •••• | •••• | - | Gorakhpur, Uttar Pradesh, India |
| Interface Electronics Private Limited | •••• | •••• | •••• | •••• | - | Madras-17, Tamil Nadu, India |
| Aaryav Electricals Private Limited | •••• | •••• | •••• | •••• | - | Chaprola, G B Nagar, Uttar Pradesh, India |
| Srivathsa Power Projects Private Limited | •••• | •••• | •••• | •••• | 12 | Visakhapatnam, Andhra Pradesh, India |
| Saheb Siraj Industries Private Limited | •••• | •••• | •••• | •••• | - | Delhi, India |
| Trupti Power Projects Private Limited this company | •••• | •••• | •••• | •••• | - | Nashik, Maharashtra, India |
| Topaz Solar Private Limited | •••• | •••• | •••• | •••• | - | Kolkata, West Bengal, India |
| Lumigre Technology Private Limited | •••• | •••• | •••• | •••• | - | Navimumbai, Maharashtra, India |
| Pranag Indenergy Private Limited | •••• | •••• | •••• | •••• | - | Coimbatore, Tamil Nadu, India |
| Aasara Digital Marketing Private Limited | •••• | •••• | •••• | •••• | - | Noida, Uttar Pradesh, India |
| Generic Renewable Energy Private Limited | •••• | •••• | •••• | •••• | - | Rajkot, Gujarat, India |
Peers are the five companies nearest above and the five nearest below Trupti Power Projects by revenue in the Power industry (Power Equipment Manufacturers, Power Projects), from the latest filed financials of each company. Revenue, net profit, margin and growth of each peer are in the company report.
Auditor Details of Trupti Power Projects Private Limited
Trupti Power Projects Private Limited is audited by S. S. PATKI & CO. for the financial year 2020.
| Name | Status | Appointment Date | Cessation Date |
|---|---|---|---|
| S. S. PATKI & CO. | Locked | Locked | Locked |
Complete auditor history
Appointment and cessation dates and past auditor changes are in the company report.
- Appointment status
- Appointment dates
- Cessation dates
- Auditor changes
Verified entity values are shown only after access is granted.
Board of Directors of Trupti Power Projects Private Limited
Trupti Power Projects has 2 current directors and 1 former director. Current directors are listed first, with their designation and appointment date.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Ranjana Babanrao Chaure | Director | 17 Jul 2007 | 19 Years 2 Months | Current |
| Baban Bhagwant Chaure | Director | 17 Jul 2007 | 19 Years 2 Months | Current |
Ownership and Shareholding of Trupti Power Projects Private Limited
Shareholding and ownership data
Promoter, institutional, public and beneficial ownership figures are in the company report.
- Ownership categories
- Historical changes
- Group structure
- FII and DII holdings
Verified entity values are shown only after access is granted.
Charges & Borrowings of Trupti Power Projects Private Limited
Trupti Power Projects Private Limited does not have any charges (loans) registered with the Registrar of Companies.
Employees and EPFO Compliance at Trupti Power Projects Private Limited
Employment history and EPFO contributions of people linked to Trupti Power Projects.
Employee and EPFO history
Monthly headcount, contribution history and filing status are in the company report.
- Monthly headcount
- PF contributions
- ECR filing status
- Establishment history
Verified entity values are shown only after access is granted.
Recent Activity on Trupti Power Projects Private Limited
Trupti Power Projects Private Limited has 3 board changes on record since 2007: 2 appointments and 1 cessation. The latest: Pallavi Ravindra Jannawar ceased to be Director on 04 Sep 2019.
Credit Ratings, Litigation & Regulatory Alerts for Trupti Power Projects Private Limited
Credit ratings, litigation, and regulatory alerts
Credit ratings, court records and regulatory alerts are in the company report.
- Rating history
- Court and tribunal cases
- Regulatory alerts
- Director-linked violations
Verified entity values are shown only after access is granted.
MSME Payment Delays by Trupti Power Projects Private Limited
MSME payment history
Amounts due to small suppliers, the reasons given and MSME-1 filings are in the company report.
- Outstanding amounts
- Delay periods and reasons
- MSME-1 filing history
- Vendor payment signals
Verified entity values are shown only after access is granted.
Subsidiaries & Group Companies of Trupti Power Projects Private Limited
Corporate group structure
Parent, subsidiary, associate and joint venture records with holdings are in the company report.
- Parent company
- Subsidiaries and ownership
- Associates and joint ventures
- Entity investments
Verified entity values are shown only after access is granted.
GST Compliance of Trupti Power Projects Private Limited
Trupti Power Projects has 2 GST registrations: 1 active and 1 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 27AACCT7479F1ZY | Maharashtra | Active | 01 Jul 2017 |
GST registrations and filing compliance
State-wise GST registrations, return filing status and HSN or SAC codes are in the company report.
- GSTIN registrations
- State-wise filing status
- HSN and SAC details
- Tax jurisdiction records
Verified entity values are shown only after access is granted.
MCA Filings & Documents of Trupti Power Projects Private Limited
MCA filings and documents
Filed forms, annual returns, financial statements and charge filings with their dates are in the company report.
- Incorporation documents
- Annual returns and statements
- Charge filings
- Complete filing index
Verified entity values are shown only after access is granted.
Frequently Asked Questions about Trupti Power Projects Private Limited
Trupti Power Projects is an active private limited company based in Nashik, Maharashtra, India. The company works in power equipment manufacturers, within the energy and power industry. It was incorporated on 17 July 2007 (19+ years old) and is registered under CIN U45207MH2007PTC172441.
Trupti Power Projects reported revenue of ₹14.69 Lakh for FY 2025 (up 4% YoY).
Trupti Power Projects has 2 current directors:
- Ranjana Babanrao Chaure - Director
- Baban Bhagwant Chaure - Director
Trupti Power Projects reported EBITDA of ₹4.96 Lakh (EBITDA margin 33.8%) for FY 2025, as per its filed financial statements.
The compounded annual growth rate (CAGR) of the revenue of Trupti Power Projects is -41% over three years and 3% over five years. In the latest year (FY 2025) revenue rose 4%. CAGR is the steady yearly rate that links the first and the last year.
The GSTIN of Trupti Power Projects is 27AACCT7479F1ZY, registered in Maharashtra. The company has 2 GST registrations in all, of which 1 is active and 1 is cancelled or inactive.
The CIN (Corporate Identification Number) of Trupti Power Projects is U45207MH2007PTC172441. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
Trupti Power Projects was incorporated on 17 July 2007, making it 19+ years old. It is registered with the Registrar of Companies, Mumbai.
The peers of Trupti Power Projects by revenue are Bagahan Energy Private Limited, Interface Electronics Private Limited, Aaryav Electricals Private Limited, Srivathsa Power Projects Private Limited, Saheb Siraj Industries Private Limited and 5 more, all in the Power industry (Power Equipment Manufacturers, Power Projects).
Pallavi Ravindra Jannawar ceased to be Director on 04 Sep 2019. Baban Bhagwant Chaure was appointed as Director on 17 Jul 2007. Ranjana Babanrao Chaure was appointed as Director on 17 Jul 2007.
The registered office of Trupti Power Projects is at C – 1130 Nice MIDC Area Satpur, Nashik, Maharashtra, India – 422007.