
Associated brands: Lanco Infratech, Adani Power
CIN: U40109GJ2001PLC162740Ahmedabad, Gujarat, India
About Korba Power Limited
Data last updated:
Korba Power Limited was a public limited company based in Ahmedabad, Gujarat, India, operated as a subsidiary of Adani Power Limited. The company has been amalgamated - it was merged with another entity and no longer exists as a separate legal entity. It operated in the thermal power plants segment of the power sector. It was incorporated on 22 February 2001.
The company was registered with the Registrar of Companies (ROC), Ahmedabad, under CIN U40109GJ2001PLC162740. It held 4 GST registrations, of which 1 is active, including GSTIN 22AACCK0633Q2ZJ (Chhattisgarh). The company had an authorised share capital of ₹6,000 Cr and a paid-up capital of ₹621 Cr. It was led by directors including Samir Kumar Mitra (Whole-Time Director) and Kanti Biswas.
As per the financials filed for FY 2026, the company reported a revenue of ₹1,551.67 Cr, a growth of 25.06% compared to the previous year. It closed the year with a net profit. The company had about 581 employees on its provident fund (EPFO) records before it was dissolved.
Company details
- MCA compliance: Active Compliant
- Public Limited Company
- Registration number 162740
- Incorporated 22 February 2001
- Authorised capital ₹6,000 Cr
- As per EPFO records
- Company limited by shares
- Non-government company
- Class: Public
- Business activity, as per the annual return of FY 2025: Electricity, gas, steam and air conditioning supply
Contact details
Korba Power Limited's registered office is in Ahmedabad, Gujarat.
- Registered AddressAdani Corporate House Shantigram, Near Vaishno Devi Circle S.G. Highway, Ahmedabad, Gujarat, India – 382421
- City: Ahmedabad
- State: Gujarat
- PIN Code: 382421
Company history
- Company details, directors and signatories
- Historical financials and ratios
- Shareholding pattern and group structure
- Charges with holder and property details
- Legal cases, compliance and MCA filings
Brands
Korba Power operates two associated brands: Lanco Infratech and Adani Power. Each brand links to its own profile.
| Brand | Description | Website |
|---|---|---|
| Multinational conglomerate with diverse interests in industries such as heavy equipment, construction, and power generation | lancogroup.com | |
| Coal-powered thermal plants are operated for electricity generation in India. | adanipower.com |
- Sector, stage and staff size of each brand
- Monthly website visits
- Funding rounds, valuation and investors
- Key people of each brand
Business activity
Korba Power operates primarily in the electricity, gas, steam and air condition supply sector. 2 business activities are registered with the MCA.
| Main activity group | Business activity | Share of turnover |
|---|---|---|
| Electricity, gas, steam and air condition supply | Electricity, gas, steam and air conditioning supply | |
| Electricity, gas, steam and air condition supply | Electric power generation, transmission and distribution |
- Each principal business activity with its activity code
- Turnover from each activity
- Industry and segment classification
Financials of Korba Power Limited
FY 2026 filings availableKorba Power Limited reported revenue of ₹1,551.67 Cr (up 25.06% YoY) for FY 2026.
Compounded Annual Growth Rate (CAGR)
Revenue rose 25.06% in the latest year. All are worked out from the filed statements.
Financial Summary
The latest five years are shown here. The company report carries every year filed since 2015.
| Summary | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 | FY 2021-22 |
|---|---|---|---|---|---|
| Revenue | 1,551.67 Cr | ||||
| EBITDA | |||||
| EBITDA Margin | |||||
| Profit After Tax | |||||
| PAT Margin | |||||
| Total Assets |
Financial statements and ratios in the report
The company report carries the complete statements for every financial year filed since 2015, up to FY 2025-26. The latest four years are previewed here. Open a statement to see the lines it carries.
Profit and Loss Statement In the report
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Revenue from Operations | ||||
| Other Income | ||||
| Total Revenue | 1,551.67 Cr | |||
| Cost of Materials Consumed | ||||
| Changes in Inventories of Finished Goods | ||||
| Changes in Inventories of Work-in-Progress | ||||
| Changes in Inventories of Stock-in-Trade | ||||
| Employee Benefit Expense | ||||
| Managerial Remuneration | ||||
| Payment to Auditors | ||||
| Insurance Expenses | ||||
| Power and Fuel | ||||
| Finance Costs | ||||
| Depreciation and Amortisation | ||||
| Other Expenses | ||||
| Total Expenses | ||||
| EBITDA | ||||
| Profit Before Exceptional and Extraordinary Items | ||||
| Exceptional Items | ||||
| Extraordinary Items | ||||
| Profit Before Tax | ||||
| Current Tax | ||||
| Deferred Tax | ||||
| Tax Expense | ||||
| Profit from Discontinuing Operations | ||||
| Tax Expense of Discontinuing Operations | ||||
| Net Profit (PAT) |
Balance Sheet In the report
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Share Capital | ||||
| Reserves and Surplus | ||||
| Money Received Against Share Warrants | ||||
| Other Equity | ||||
| Net Worth (Total Equity) | ||||
| Long-term Borrowings | ||||
| Deferred Tax Liabilities (Net) | ||||
| Other Long-term Liabilities | ||||
| Long-term Provisions | ||||
| Total Non-current Liabilities | ||||
| Short-term Borrowings | ||||
| Trade Payables | ||||
| Other Current Liabilities | ||||
| Short-term Provisions | ||||
| Total Current Liabilities | ||||
| Total Equity and Liabilities | ||||
| Tangible Assets | ||||
| Intangible Assets | ||||
| Capital Work-in-Progress | ||||
| Intangible Assets Under Development | ||||
| Non-current Investments | ||||
| Deferred Tax Assets (Net) | ||||
| Long-term Loans and Advances | ||||
| Other Non-current Assets | ||||
| Total Non-current Assets | ||||
| Current Investments | ||||
| Inventories | ||||
| Trade Receivables | ||||
| Cash and Bank Balance | ||||
| Short-term Loans and Advances | ||||
| Other Current Assets | ||||
| Total Current Assets | ||||
| Total Assets |
Cash Flow Statement In the report
| Particulars | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Profit Before Tax | ||||
| Adjustments for Finance Costs | ||||
| Adjustments for Depreciation and Amortisation | ||||
| Adjustments for Inventories | ||||
| Adjustments for Trade Receivables | ||||
| Adjustments for Trade Payables | ||||
| Adjustments for Other Current Assets | ||||
| Adjustments for Other Current Liabilities | ||||
| Adjustments for Provisions | ||||
| Adjustments for Interest Income | ||||
| Adjustments for Dividend Income | ||||
| Other Non-cash Adjustments | ||||
| Net Cash Flows from Operations | ||||
| Income Taxes Paid | ||||
| Net Cash Flows from Operating Activities | ||||
| Purchase of Property, Plant and Equipment | ||||
| Proceeds from Sale of Property, Plant and Equipment | ||||
| Cash Flows on Acquiring or Losing Control of Subsidiaries | ||||
| Interest Received | ||||
| Dividends Received | ||||
| Net Cash Flows from Investing Activities | ||||
| Proceeds from Issuing Shares | ||||
| Proceeds from Borrowings | ||||
| Repayments of Borrowings | ||||
| Payments of Lease Liabilities | ||||
| Interest Paid | ||||
| Dividends Paid | ||||
| Net Cash Flows from Financing Activities | ||||
| Net Change in Cash and Cash Equivalents | ||||
| Cash and Cash Equivalents at the Beginning | ||||
| Cash and Cash Equivalents at the End |
Liquidity ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Current Ratio | ||||
| Quick Ratio | ||||
| Cash Ratio |
Turnover ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Inventory Days | ||||
| Receivable Days | ||||
| Payable Days | ||||
| Cash Conversion Cycle (Days) | ||||
| Sales to Fixed Assets |
Profitability ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| EBITDA Margin | ||||
| Net Profit Margin | ||||
| Net Worth Margin | ||||
| Return on Equity (ROE) | ||||
| Return on Capital Employed (ROCE) |
Growth ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Revenue Growth | ||||
| Equity Multiplier |
Leverage and Solvency ratios In the report
| Ratio | FY 2025-26 | FY 2024-25 | FY 2023-24 | FY 2022-23 |
|---|---|---|---|---|
| Debt to EBITDA | ||||
| Debt-to-Equity Ratio | ||||
| Interest Coverage Ratio | ||||
| Total Loans to Total Assets | ||||
| Total Investments to Total Assets |
- Profit and loss, balance sheet and cash flow, line by line
- Every financial year filed since 2015
- Liquidity, turnover, profitability, growth and leverage ratios
- Standalone and consolidated statements, where both are filed
- Auditors' remarks and the directors' comments for each year
Board of directors of Korba Power Limited
Korba Power had 4 directors when it last reported to the MCA. 28 more had left the board before that.
| Name | Designation | Appointment Date | Tenure | Status |
|---|---|---|---|---|
| Kanti Biswas | Director | 06 Sep 2024 | 2 yrs 2 mos | As last reported |
| Sushama Oza | Director | 06 Sep 2024 | 2 yrs 2 mos | As last reported |
| Samir Kumar Mitra | Whole-Time Director | 06 Sep 2024 | 2 yrs 2 mos | As last reported |
| Sunil Sheshmal Tokarawat | Director | 06 Sep 2024 | 2 yrs 2 mos | As last reported |
- Every director and KMP with DIN, nationality and appointment date
- Other companies where each director holds a position
- Shares held by directors and KMP
- Changes on the board, with dates
Peer comparison
Korba Power Limited is compared with the 10 companies closest to it by revenue in the Power industry (Thermal Power Plants), with the same principal business activity (electricity, gas, steam and air conditioning supply), from the latest filed financials of each company.
| Company | Revenue | Net profit | Margin | Growth (1 yr) | Employees | Location |
|---|---|---|---|---|---|---|
| Meil Anpara Energy Limited | ₹2,673.46 Cr FY 2025 | -9.0% | Lucknow, Uttar Pradesh, India | |||
| Dhariwal Infrastructure Limited | ₹2,250.45 Cr FY 2026 | 12.0% | Kolkata, West Bengal, India | |||
| Haldia Energy Limited | ₹2,114.09 Cr FY 2025 | 6.0% | Kolkata, West Bengal, India | |||
| GMR Warora Energy Limited | ₹1,950.66 Cr FY 2025 | 2.0% | Mumbai, Maharashtra, India | |||
| Sepc Power Private Limited | ₹1,907.49 Cr FY 2025 | -6.0% | Chennai, Tamil Nadu, India | |||
| Sai Wardha Power Generation Private Limited | ₹1,610.9 Cr FY 2025 | -6.0% | Hyderabad, Telangana, India | |||
| Korba Power Limitedthis company | ₹1,551.67 Cr FY 2026 | 25.1% | Ahmedabad, Gujarat, India | |||
| Meenakshi Energy Limited | ₹1,548.56 Cr FY 2026 | 1174.0% | Hyderabad, Telangana, India | |||
| The Durgapur Projects Ltd | ₹1,505.83 Cr FY 2025 | 8.0% | Burdwan, West Bengal, India | |||
| Vidarbha Industries Power Limited | ₹1,326.56 Cr FY 2026 | 7253.0% | Mumbai, Maharashtra, India | |||
| Inland Power Limited | ₹935.17 Cr FY 2026 | 327.0% | Kolkata, West Bengal, India |
- Revenue, EBITDA, profit after tax and total debt of every peer
- EBITDA margin and PAT margin
- Revenue growth over one year and three years
- Rank among peers on revenue, EBITDA, profit and growth
Charges & borrowings
Korba Power Limited has 19 charge records registered with the MCA, created between 2005 and 2018: none open and 19 satisfied.
Satisfied charges by lender
Latest charges
| Created on | Charge ID | Lender | Amount | Status |
|---|---|---|---|---|
| 03 May 2018 | 100175594 | Power Finance Corporation Limited | ₹574.38 Cr | Satisfied |
| 27 Mar 2018 | 100164307 | Rural Electrification Corporation Limited | ₹280 Cr | Satisfied |
| 21 Sep 2017 | 100153076 | Power Finance Corporation Limited | ₹125 Cr | Satisfied |
| 25 May 2016 | 100028292 | Power Finance Corporation Limited | ₹79 Cr | Satisfied |
| 19 Nov 2015 | 10602638 | Andhra Bank | ₹150.02 Cr | Satisfied |
- All 19 charge records, 2005 to 2018
- Creation, last modification and satisfaction date of each charge
- Open and satisfied amount with every lender
- Each lender's share of the open amount
Deals & funding
Korba Power Limited has 47 deals on record (28 funding rounds, 16 secondary share transfers, 2 rights issues), with disclosed funding of ₹1,164.21 Cr; the latest was in September 2024.
Deals on record (5 of 47)
| When | Deal | Amount | Parties |
|---|---|---|---|
| Sep 2024 | Acquisition | ₹90 Lakh | Buyer: Adani Power Limited |
| Sep 2024 | Funding round | ₹10 Lakh | Investors: Adani Power Limited , Adani Power Limited & Dilip Kumar Jha, Adani Power Limited & Rajiv Rustagi |
| Jan 2020 | Secondary share transfer | Undisclosed | Buyer: Energin Ventures Private Limited Seller: Lanco Infratech Limited |
| Dec 2016 | Secondary share transfer | Undisclosed | Buyer: Ramanagaram Enterprises Private Limited Seller: Lanco Infratech Limited |
| Oct 2016 | Secondary share transfer | Undisclosed | Buyer: Ramanagaram Enterprises Private Limited Seller: Lanco Infratech Limited |
- Every funding round, acquisition and share transfer on record
- Deal amount and post-money valuation
- Investors, buyers and sellers in each deal
- Funding and valuation over time
Deal records are compiled from filings and public sources; amounts are shown only where the source reported them.
Legal cases
Korba Power Limited has 76 court cases on record: 36 filed by Korba Power, 42 filed against it. 16 cases are pending and 60 are disposed.
Cases by court
| Court | Cases | Against the company | Pending |
|---|---|---|---|
| High courts | 28 | 14 | 6 |
| District courts | 19 | 8 | 2 |
| Supreme Court | 17 | 12 | 7 |
| NCLT | 8 | 6 | 0 |
| NCLAT | 4 | 2 | 1 |
Cases on record (5 of 76)
| Court | Type of case | Party | Status |
|---|---|---|---|
| Supreme Court | Court case (1901-Energy Laws - Electricity, Petroleum, Oil and Natural Gas : Energy laws - Electricity, Petroleum, Oil and Natural Gas) | Filed against the company by Chhattisgarh State Power Distribution Company Ltd and 1 other | Pending |
| Supreme Court | Appeal | Filed against the company by Chhattisgarh State Power Distribution Company Limited | Pending |
| NCLAT, NCLAT Chennai | Interim or miscellaneous application | Filed against the company by KRS Erectors Private Limited and 1 other | Pending |
| High Court | Writ petition | Filed by the company against Hindustan Petroleum Corporation Ltd. and 1 other | Pending |
| Supreme Court | Court case (1901-Energy Laws - Electricity, Petroleum, Oil and Natural Gas : Energy laws - Electricity, Petroleum, Oil and Natural Gas) | Filed by the company against M/S Haryana Power Generation Corporation Ltd. Managing Director Urja Bhawan, C-7, Sector 6, Hpgcl, ,Panchkula * , Haryana and 5 others | Pending |
- Case number, court and year of every case
- Parties to each case
- Status of each case: pending or disposed
- Cases by court, filed by and filed against the company
Case records are compiled from court listings and may lag the court's own records. A case filed against a company is not a finding against it.
Credit ratings & regulatory alerts
Korba Power Limited was last rated by Brickwork on 14 Oct 2019.
| Rating agency | Rated on | Rating |
|---|---|---|
| Brickwork | 14 Oct 2019 |
- Current ratings by agency and instrument, with outlook
- Rating history with every rating action and its date
- Regulatory alerts: defaults, violations and suits filed
- Regulator, charge and action for each alert
GST
Korba Power has 4 GST registrations: 1 active and 3 cancelled or inactive.
| GSTIN | State | Status | Registered on |
|---|---|---|---|
| 22AACCK0633Q2ZJ | Chhattisgarh | Active | 27 Apr 2020 |
- Each GSTIN with its state and status
- Last return filed and its due date
- Return filing record of the last 12 months
Recent activity
Korba Power Limited has 32 board changes on record since 2007: 4 appointments and 28 cessations. The latest: Kanti Biswas ceased to be Additional Director on 24 Jun 2025.
| Date | Type | Event |
|---|---|---|
| 5 months ago | AGM | Korba Power Limited last Annual general meeting of members was held on 24 Jun 2026 as per latest MCA records. |
| 7 months ago | Filing | Korba Power Limited has filed its annual Financial statements for the year ended 31 Mar 2026 with ROC Ahmedabad. |
| 1 year 5 months ago | Ceased | Kanti Biswas ceased to be Additional Director. |
| 1 year 5 months ago | Ceased | Sunil Sheshmal Tokarawat ceased to be Additional Director. |
| 1 year 5 months ago | Ceased | Sushama Ashvin Oza ceased to be Additional Director. |
| 1 year 8 months ago | Charges | A charge registered on 26 Dec 2014 via Charge ID 10544115 with IDBI Trusteeship Services Limited was fully satisfied on 10 Mar 2025. |
| 2 years ago | Ceased | Niharendu Sanyal ceased to be CFO. |
| 2 years 2 months ago | Charges | A charge registered on 03 May 2018 via Charge ID 100175594 with Power Finance Corporation Limited was fully satisfied on 06 Sep 2024. |
News
Also available in the company report of Korba Power Limited
MSME payments
- Dues to MSME suppliers from Form MSME-1
- Amount, due date and the reason for each delay
Frequently asked questions
Korba Power has been "Amalgamated" (merged) as per MCA records. The company was combined with another entity and no longer exists as a separate legal entity. Business activities, if any, continue under the successor entity.
Korba Power was a public limited company based in Ahmedabad, Gujarat, India. The company worked in thermal power plants, within the power industry. It was incorporated on 22 February 2001 and is registered under CIN U40109GJ2001PLC162740. The company is recorded as amalgamated in MCA records and no longer exists as a legal entity.
Korba Power was incorporated on 22 February 2001. It is registered with the Registrar of Companies, Ahmedabad.
Korba Power had 4 directors:
- Samir Kumar Mitra - Whole-Time Director
- Kanti Biswas - Director
- Sushama Oza - Director
- Sunil Sheshmal Tokarawat - Director
The CIN (Corporate Identification Number) of Korba Power is U40109GJ2001PLC162740. It is issued by the Ministry of Corporate Affairs under the Companies Act, 2013, and uniquely identifies the company in India.
The registered office of Korba Power is at Adani Corporate House Shantigram, Near Vaishno Devi Circle S.G. Highway, Ahmedabad, Gujarat, India – 382421.
Korba Power can be reached through the website lancogroup.com. Its registered office is in Ahmedabad, Gujarat, India.
The latest financial statements of Korba Power on record with the MCA are for the year ended 31 March 2026. Its last annual general meeting was held on 24 June 2026. Year-wise statements from 2015 are in the company report.
The GSTIN of Korba Power is 22AACCK0633Q2ZJ, registered in Chhattisgarh. The company has 4 GST registrations in all, of which 1 is active and 3 are cancelled or inactive.
Korba Power operated in the power industry, in the thermal power plants segment.
Korba Power has 47 deals on record (28 funding rounds, 16 secondary share transfers, 2 rights issues), with disclosed funding of ₹1,164.21 Cr; the latest was in September 2024.

